REVISIONS
DATE/DELTA REMARKS
CITY OF LOS ANGELES
DEPARTMENT OF BUILDING AND SAFETY
DISABLED ACCESS SECTION E
This set of plans and specifications has been reviewed and is approved for
compliance with state and local laws and ordinances related to accessibility to
public accommedations and housing.
The stamping of this set of plans and specifications shall not be held to
permit or to be ав approval of the violation of any provisions of federal, state, and
local laws and ordinances related to accessibility to public accommodations and
| | | | ) | ) | | / 1 | / y | Ву: EDDIE GARIN Total of bests
417 SOUTH HILL STREET
LOS ANGELES. CALIFORNIA
OWNER: 417 S HILL ST LA ШС
680 DAVIS STREET
SAN FRANCISCO, CALIFORNIA 94111
TEL: (909) 229-5073
SCOPE OF WORK CODE SUMMARY CONTACTS SHEET INDEX
PROJECT DESCRIPTION : CODE REFERENCES ARCHITECTURAL GENERAL NOTES:
1.
THIS IS A REHABILITATION FOR THE GROUND FLOOR OF AN EXISTING HISTORICAL APPLICABLE CODES INCLUDE, BUT NOT LIMITED TO THE FOLLOWING: LANDLORD: дї ЖШ. Saba Nb A-0.0 TITLE SHEET THE GENERAL CONDITIONS OF THE CONTRACT FOR CONSTRUCTION — A201 2007 EDITION
BUILDING. IT INCLUDES INTERIOR REHABILITATION OF EXISTING MARBLE FLOORS, TERRA E60 DAVIS STREET A-0.1 CAL GREEN OF THE AMERICAN INSTITUTE OF ARCHITECTS ARE HEREBY MADE A PART OF THESE
COTTA FINISHES, PLASTER COFFER CEILINGS, GLASS WORK, AND PARTIAL EXTERIOR BUILDING: LABC 2020 SAN FRANCISCO. CALIFORNIA 94411 АСОБА STANDARD FOR IRENABIIMATION CONTRACT DOCUMENTS TO THE SAME EXTENT AS IF BOUND HEREIN. 26. EXIT HARDWARE SHALL COMPLY WITH C.B.C. CHAPTER 10 ON EXITING.
CLEANING OF EXISTING GRANITE TILES AND CORBELS, PLASTER WORK, GLASS MOSAIC, FIRE: LABC 2020 кысы 02025073 оя
LIGHT FIXTURES; NEW STOREFRONT IN EXISTING OPENNINGS. ENERGY: LABC 2020 . ALL WORK SHALL CONFORM TO THE REQUIREMENTS OF THE 2019 С.В.С. AND ALL OTHER 27, THE REQUIREMENTS OF UFC ART. 87 SHALL BE FOLLOWED DURING CONSTRUCTION.
TITLE 24: LABC 2020 CALIFORNIA TITLE 24 DISABLED ACCESS REQUIREMENTS CONTACT: George Hajjar A-0.2C STANDARD FOR REHABILITATION GOVERNING AUTHORITIES HAVING JURISDICTION.
GREEN: LABC 2020 A-0.20 STANDARD FOR REHABILITATION 28. ADDITIONAL EXIT SIGNS MAY BE REQUIRED AT THE REQUEST OF THE BUILDING INSPECTOR
DEFERRED SUBMITTALS : A-0.2E STANDARD FOR REHABILITATION . ALL WORK SHALL CONFORM TO THE CABO/ANSI A117.1 2009 STANDARD, AND SHALL BE OR FIRE DEPARTMENT FIELD INSPECTOR. GENERAL CONTRACTOR TO PROVIDE UNIT COST AT
DEFERRED SUBMITTALS : LOS ANGELES MUNICIPAL CODE ARCHITECT: BICKEL GROUP ARCHITECTURE mol чо ыш оо Oa ACCESSIBLE TO, AND USABLE BY, THE PHYSICALLY HANDICAPPED AS REQUIRED BY ALL COMMENCEMENT OF PROJECT.
— FIRE LIFE SAFETY SYSTEM, INCLUDING FIRE SPRINKLER SYSTEM, FIRE ALARM SYSTEM, STROBES AND
АБО BROH СТ APPLICABLE CODES AND CALIFORNIA TITLE 24, INCLUDING ANY SPECIAL LOCAL
HORNS AS REQUIRED PER CODE AND LOCAL ORDINANCE TO COMPLY WITH NFPA 13 AND NFPA 72 THE SECRETARY OF INTERIOR’S STANDARDS FOR THE TREATMENT OF HISTORIC PROPERTIES WITH SUITE 120 l AUS ЕМЕАНОЕР SITE PLANCA PASEO 8 EGRESS PLAN ORDINANCES. 29. HAZARDOUS MATERIALS STORED AND/OR USED ON SITE WILL NOT EXCEED QUANTITIES
SUBMITTAL DOCUMENTS FOR DEFERRED SUBMITTAL ITEMS SHALL BE SUBMITTED TO THE
| F NG, ITATING, TORING, | | | А-1.0 EXISTING FLOOR PLAN LISTED IN CBC SECTION 307.1 (1 & 2).
E NE р ee a ar BEACH, кезү Ca диз. RN INSTALL ALL MANUFACTURED ITEMS, MATERIALS AND EQUIPMENT IN STRICT ACCORDANCE ( )
оо eee ee WITH THE MANUFACTURER'S SPECIFICATIONS. 30. ALL FINISHES SHALL COMPLY WITH TABLE 803.5 OF CBC.
CONTACT: ELENA MASHIN A-2.1 REFLECTED CEILING PLAN
A-3.0 ELEVATION TO BE RESTORED CONTRACTOR IS RESPONSIBLE FOR EXAMINING ALL CONTRACT DOCUMENTS AND FIELD
CONDITIONS TO CONFIRM THAT WORK IS BUILDABLE AS SHOWN BEFORE PROCEEDING WITH А
CONSTRUCTION. IF COORDINATION QUESTIONS OCCUR, THE CONTRACTOR IS RESPONSIBLE FLOOR PLAN NOTES:
FOR OBTAINING A CLARIFICATION FROM THE ARCHITECT AND/OR TENANT CONSTRUCTION 1. NOT USED.
COORDINATOR BEFORE PROCEEDING WITH THE WORK IN QUESTION OR RELATED WORK.
Бак: — 03/31/2023
22016-10000-19644
GENERAL NOTES
417 SOUTH HILL STREET
LOS ANGELES, CALIFORNIA
25. PEDESTRIANS SHALL BE PROTECTED DURING CONSTRUCTION AND DEMOLITION ACTIVITIES AS
REQUIRED BY SECTION 3306, 2019 CBC.
417 S HILL STREET
HISTORIC REHABILITATION
ARCHITECT OR ENGINEER OF RECORD WHO SHALL REVIEW THEM FOR GENERAL CONFORMANCE | BUILDINGS, AS REVISED BY ANNE E. GRIMMER, 2017
WITH THE DESICN OF THE BUILDING AND RETURN THEM TO THE GENERAL CONTRACTOR. THE
GENERAL CONTRACTOR IS RESPONSIBLE FOR SUBMITTING THE DOCUMENTS TO THE BUILDING
DEPARTMENT (OR OTHER REQUIRED REGULATING AGENCY) FOR REVIEW AND APPROVAL AND | ub ER
OBTAINING THE NECESSARY PERMITS. NO CONSTRUCTION FOR DEFERRED SUBMITTAL ITEMS STRUCTURAL NABIH YOUSSEF STRUCTURAL ENGINEERS
SHALL COMMENCE UNTIL ITEM IS APPROVED AND PERMITTED BY THE BUILDING DEPARTMENT. BUILDING DATA
HISTORICAL PRESERVATION :
С.С. TO FOLLOW THE SECRETARY OF THE INTERIOR'S STANDARDS FOR THE TREATMENT OF
HISTORIC PROPERTIES WITH GUIDELINES FOR PRESERVING, REHABILITATING, RESTORING, AND
RECONSTRUCTING HISTORIC BUILDINGS, TECHNICAL DOCUMENTS AND SPECIFICATIONS FROM |
THE FEDERAL GENERAL SERVICES ADMINISTRATION. SPECIFICALLY, SEE SEE А—0.2А THROUGH BUILDING GROSS AREA:
550 SOUTH HOPE STREET, SUITE 1700
LOS ANGELES, CALIFORNIA 90071 A-5.0 DOOR SCHEDULE, EXTERIOR & INTERIOR DETAILS
(213) 362-0707 DIRECT (213) 417-1239
CONTACT: JACOB RODRIGUEZ
ENGINEER:
OCCUPANCY TYPE: E.T.R. OFFICE (B OCCUPANCY)
О
2. ALL PARTITIONS TO BE ТҮРЕ 1 U.N.O.
CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING ALL PERMITS.
CONSTRUCTION TYPE: ET.R. TYPE 1A | FULLY SPRINKLERED
E.T.R. 626,830 SF HISTORIC
.C
3. INSTALL METAL CORNER BEADS AT ALL EXPOSED WALLBOARD EDGES, INSTALL CASING
BEADS WHEREVER WALLBOARD, PLASTER, ETC. ABUTS A DISSIMILAR FINISH MATERIAL AND
PROVIDE SEALANT AS REQUIRED.
CONTRACTOR SHALL SUBMIT CONFIRMATION OF DELIVERY DATES FOR ORDERED MATERIALS
HISTORIC RESOURCE GROUP AND EQUIPMENT, AND SHALL NOTIFY THE ARCHITECT OF ANY LONG LEAD TIMES FOR
CA 92660
F: 949.757.0511
QO
ш N
H T
< ш
£ r-
A-0.2E 128 FAIR OAKS ACENUE, SUITE 200 7 o.
-0. | NSULTANT: ORDERED ITEMS. l ‚
AREA OF REHABILITATION: Е.А, 26,970 SF | GROUND FLOOR ONLY CONSU PASADENA, CALIFORNIA 91105-3816 4. PROVIDE A MINIMUM OF 20 GA. BACKING STUDS AND/OR 18 GA. BY 6" WIDE BACK'G C ` -
DE SIGN BU | LD EGIPAT TO: ENE TO REAN (626) 793-2400 X109 CONTRACTOR SHALL SUBMIT FIVE REPRODUCIBLE SETS OF SHOP DRAWINGS OR PLATES IN WALLS & CEILINGS WHEN REQUIRED FOR SUPPORT U.O.N. OF -0D
= CONTACT: JOHN LoCASCIO MANUFACTURERS DATA SHEETS OF THE FOLLOWING ITEMS: Ow I
EGRESS REQUIREMENTS: EXISTING ТО REMAIN а Se USE B/E TPE X GYP- BI; FHKOUCHOUT, Zzuouv,
FOR DESIGN-BUILD PORTIONS OF WORK REFER TO GENERAL NOTE 24 CONTRACTOR: T.B.D ALL FINISH MATERIALS 6. PROVIDE EXTRA STUDS AS REQUIRED TO MOUNT ELECTRICAL OR MECHANICAL CONTROLS. 0L E < T
ii SPRINKLER DRAWINGS INSURE STUDS REMAIN PLUMB. CRIMP OR SCREW ATTACH TO RUNNERS AS REQUIRED. ш -x
ALLOWABLE AREA CALCULATIONS CEILING SYSTEMS 20 Mto
UNLIMITED, EXISTING TO REMAIN, MIXED OCCUPANCY B & R2, NON SEPARATED 7. REMOVE ALL PINS, NAILS, COAT HOOKS ETC. FROM WALLS. REPAIR ALL EXISTING O О
SHOP DRAWINGS SHOULD INCLUDE DETAILED FABRICATION AND ERECTION DRAWINGS, DRYWALL DAMAGES AND BLEMISHES AND FINISH AS NOTED ON FINISH PLAN. X Т. ——
SETTING DRAWINGS, DIAGRAMMATIC DRAWINGS AND MATERIAL SCHEDULES, LOCATION AND 6 O г! о
SITE INFORMATION ALLOWABLE HEIGHT ORIENTATION OF ALL ITEMS SHALL BE CLEARLY INDICATED. BEGIN FABRICATION ONLY 8. ALL GLASS SHALL BE TEMPERED. ALL EXPOSED EDGES SHALL BE POLISHED. таб 0
—— EE AFTER ARCHITECT AND/OR TENANT CONSTRUCTION COORDINATOR HAS REVIEWED THE SHOP Am ON
EXISTING TO REMAIN: DRAWINGS AND MARKED THEM "NO EXCEPTION TAKEN” . THE ABOVE LIST DOES NOT LIMIT 9. PREPARE SLAB AS REQUIRED FOR SPECIFIED FINISH. SEE FINISH PLAN. Ш Oo >
ASSESSORS PARCEL NO. : ADDITIONAL SUBMITTALS THAT MAY BE REQUIRED BY THE ARCHITECT, TENANT, OWNER OR Y Oo
DUM BUILDING HEIGHT = E.T.R. 178° THEIR CONSULTANTS. REVIEW BY THE ARCHITECT DOES NOT RELIEVE THE CONTRACTOR 10. NEW BUILDING STANDARD INTERIOR DOOR AND FRAMES SHALL BE FINISHED TO MATCH O О oz
5149-027-BRK ИРИ FROM RESPONSIBILITY FOR ERRORS WHICH MAY EXIST IN THE SUBMITTED DATA. OWNER SPECIFICATIONS. Vow.
. ALL REQUESTS FOR SUBSTITUTIONS OF ITEMS SPECIFIED SHALL BE IN WRITING. 11. PATCH AND REPAIR ALL SURFACES DAMAGED AS A RESULT OF ANY WORK PERFORMED ON moznus
LEGAL DESCRIPTION : PLUMBING FIXTURE CALCULATIONS ACCEPTANCE OF A SUBSTITUTION WILL BE AT THE DISCRETION OF THE ARCHITECT AND THIS PROJECT.
BUILDING MANAGEMENT WITH RECOMMENDATIONS FROM THE TENANT'S CONSTRUCTION
COORDINATOR AND OTHER DESIGN CONSULTANTS TO THE JOB. ANY PROPOSED
SUBSTITUTION SHOULD PROVIDE BETTER SERVICE TO THE FACILITIES, A MORE
mie quoe ae TOILET FACILITY AND CALCULATIONS TO BE PROVIDED UNDER SEPARATE TENANT IMPROVEMENT PERMIT 12. PREPARE ALL NEW SURFACE TO RECEIVE A NEW FINISH.
MAP REFERENCE: MB 1324-69/78
LOT: LT1 ADVANTAGEOUS DELIVERY DATE OR A LOWER PRICE TO THE OWNER, WITH OUT SACRIFICING
MAP SHEET: 129A211 QUALITY, APPEARANCE OR FUNCTION. IN NO CASE SHALL THE ARCHITECT BE REQUIRED
130-5A211 TO PROVE THAT A PRODUCT PROPOSED FOR SUBSTITUTION IS OR IS NOT OF EQUAL
QUALITY TO THE PRODUCT SPECIFIED.
. ALL WORK NOTED °N.I.C.” OR NOT IN CONTRACT IS TO BE ACCOMPLISHED BY A
CONTRACTOR OTHER THAN THE GENERAL CONTRACTOR AND IS NOT TO BE A PART OF THE
DRAVWI NG SYM BOLS LEG EN D оосо. ОЕ GENERAL CONTRACTOR SHALL COORDINATE WITH OTHER
. ALL DIMENSIONS ARE TO FACE OF FINISH UNLESS OTHERWISE NOTED.
SECTION
NUMBER. MATERIAL
NUMBER.
ELEVATION MARKER SECTION 48 SET И. e —— ELEVATION DATUM POINT
. "ALIGN" AS USED IN THESE DOCUMENTS SHALL MEAN TO ACCURATELY LOCATE FINISH OF
SURFACES IN THE SAME PLANE.
ELEVATIDN
ELEVATION CALL OUT DOOR NO.
. “TYPICAL” AS USED IN THESE DOCUMENTS SHALL MEAN THAT THE CONDITION IS THE SAME
REPRESENTATIVE OF SIMILAR CONDITIONS THROUGHOUT, UNLESS OTHERWISE NOTED.
SHEET NUMBER. , »
SHEET NUMBER. DETAILS ARE USUALLY KEYED AND NOTED “TYPICAL” ONLY ONCE.
COLOR & FINISH
. COLUMN CENTER LINES ARE SHOWN FOR REFERENCE ONLY TO ESTABLISH POINT OF
REFERENCE FOR DIMENSIONING. REFER TO SHELL BUILDING DRAWINGS OR FIELD VERIFY
EXACT COLUMN LOCATIONS.
. ALL VERTICAL DIMENSIONS ARE TO SLAB, UNLESS NOTED A.F.F. (ABOVE FINISH FLOOR).
. DO NOT SCALE DRAWINGS, DIMENSIONS GOVERN. THERE IS NO IMPLIED DIRECTION FOR
ONE DRAWING TO GOVERN OVER ANOTHER. IF ANY DISCREPANCIES IN DIMENSIONS ARE
FOUND, NOTIFY THE ARCHITECT IMMEDIATELY FOR CLARIFICATION.
DIAMETER . CAMBER . EAST . GLASS . MISCELLANEOUS REQ'D. REQUIRED TOP OF PARAPET
SQUARE FOOT/FEET CABLE TELEVISION . EACH . GROUND .O. MASONRY OPENING RESIL. RESILIENT .S. TOP OF SHEATHING
| a АТ В. CATCH BASIN .C. EVAPORATIVE COOLER . GRADE . MOUNTED RM. ROOM „ОМ. TOP OF WALL
PROJECT LOCATION: . CEMENT EXPANSION JOINT . GYPSUM MAIN TELEPHONE TERMINAL R.H.B. RECESSED HOSE BIBB . TYPICAL
CENTERLINE
SUBWAY TERMINAL BUILDING
417 SOUTH HILL STREET
LOS ANGELES, CA 90013
POUND OR NUMBER
EXISTING
ANCHOR BOLT
ABOVE
AIR CONDITIONING
ASPHALTIC CONCRETE
AREA DRAIN
AUDIO/VISUAL
ACOUSTICAL
ABOVE FINISH FLOOR
ALUMINUM
APPROXIMATE
ARCHITECTURAL
AUTOMATIC SPRINKLER
SYSTEM
ABOVE SHEATHING
BOARD
BOTTOM FRAMING
BUILDING
BLOCK
BLOCKING
BEAM
BOUNDARY NAILING
BOTTOM
BETWEEN
CERAMIC
CONCEALED HOSE BIBB
CAST IRON
CEILING JOIST
CONTROL JOIST
CEILING
CLEAR
CONCRETE MASONRY UNIT
CLEANOUT
CONDUIT ONLY
COLUMN
CONCRETE
CONNECTION
CONSTRUCTION
CONTINUOUS
CONTRACTOR
COUNTERSUNK
CUBIC YARD
DOUBLE
DEPARTMENT
DETAIL
DOUGLAS FIR
DRINKING FOUNTAIN
DIAMETER
DIMENSION
DOWN
DOOR
DOWN SPOUT
DRAWING
ELECTRICAL
ELEVATION
ELECTRICAL PANEL
EQUAL
EQUIPMENT
EACH WAY
EXISTING
EXTERIOR
FOUNDATION
FLOOR DRAIN
FINISH FLOOR
FINISH
FIXTURE
FLOOR
FLOW LINE
FLUORESCENT
FIRE HYDRANT
FACE OF FINISH
FACE OF MASONRY
FACE OF SHEATHING
FLOOR SINK
FIRE SPRINKLER RISER
FOOT/FEET
FOOTING
FURRING
FUTURE
GAUGE
GALVANIZED
GENERAL CONTRACTOR
GALVANIZED IRON
GLU-LAM BEAM
MULLION
HOSE BIB
HOLLOW CORE
HEADER
HARDWARE
HEIGHT
HOLLOW METAL
HORIZONTAL
HIGH POINT
HEATING
HARDWOOD
HEATING, VENTILATION AND
AIR CONDITIONING
INSIDE DIAMETER
INVERT ELEVATION
INCH
INSULATION
INTERIOR
JOINT
KNOCK DOWN
LAMINATED
LAVATORY
LIGHT
MAXIMUM
MACHINE BOLT
MECHANICAL
METAL
MANUFACTURER
MANHOLE
MINIMUM
NORTH
NOT IN CONTRACT
NUMBER
NOMINAL
NOT TO SCALE
OVERALL
ON CENTER
OUTSIDE DIAMETER
OVERFLOW DRAIN
OPENING
OPPOSITE
PARTITION
PROPERTY LINE
PLASTER
PLUMBING
PLYWOOD
POINT OF CONNECTION
POLYPROPYLENE
PAIR
PRESSURE TREATED
QUARRY TILE
RISER
RADIUS
ROOF DRAIN
REDWOOD
REFERENCE
REFRIGERATOR
REINFORCED
ROUGH OPENING
RIGHT OF WAY
RE-SAWN
SOUTH
SCALE AS NOTED
SUSPENDED ACOUSTICAL TILE
SOLID CORE
SCHEDULE
SECTION
SHEET
SHEATHING
SIMILAR
SUPPLY/INSTALLATION
SCHEDULE
SPECIFICATION
SQUARE
SERVICE SINK
STAINLESS STEEL
STANDARD
STEEL
STORAGE
STRUCTURAL
SHUT OFF VALVE
SYMMETRICAL
TREAD
TOP OF BEAM
TELEPHONE
TONGUE AND GROOVE
THICK
TOP OF CURB
UNIFORM BUILDING CODE
UNLESS OTHERWISE NOTED
VINYL BASE
VERTICAL
VINYL COMPOSITION TILE
VENT THROUGH ROOF
WEST
WITH
WATER CLOSET
WOOD
WATER HEATER
WITHOUT
WEAKENED PLANE JOINT
WATER RESISTANT
WELDED WIRE FABRIC
. ALL WORK PERFORMED BY THE CONTRACTOR SHALL CONFORM TO THE EXISTING BUILDING
STANDARDS. SEE NOTE 8 FOR SUBSTITUTIONS
. CONTRACTOR SHALL PATCH ANY EXISTING WALLS AND/OR CEILINGS AS REQUIRED TO
REFURBISH THE LEASE SPACE AND REPAIR ALL DAMAGES.
. CONTRACTOR SHALL BE RESPONSIBLE FOR THE GENERAL CLEANING OF THE JOB AFTER
CLEANING SHALL INCLUDE THE INTERIOR OF THE
BUILDING, PATH OF TRAVEL TO THE JOB SITE, PARKING LOT, STAIRS, LOBBIES, CORRIDOR
COMPLETION OF CONSTRUCTION.
AND CARPET.
. CONTRACTOR SHALL REFINISH ANY DAMAGED DOOR OR REPLACE THE DOOR IF UNABLE TO
PROPERLY REFINISH.
. CONTRACTOR TO FLOAT AND SAND SMOOTH BASE OF ALL WALLS BEFORE PLACEMENT OF
VINYL BASE.
. THE CONTRACTOR SHALL PROVIDE RECORD DOCUMENTS OF ALL WORK PERFORMED AND
SHALL INDICATE ANY DEVIATIONS FROM THE DESIGN DOCUMENTS AS WELL AS THE
LOCATION OF ALL WORK WHICH IS HIDDEN BY SUBSEQUENT CONSTRUCTION.
DOCUMENTS SHALL BE GIVEN TO THE OWNER AT COMPLETION OF TENANT CONSTRUCTION
PRIOR TO APPLICATION FOR FINAL PAYMENT.
. AS A "DESIGN—BUILD" PORTION OF THE CONTRACT, THE CONTRACTOR IS TO ADAPT THE
FIRE LIFE SAFETY SYSTEM TO THE NEW BUILDING LAYOUT, INCLUDING FIRE SPRINKLER
SYSTEM AND FIRE ALARM SYSTEM INCLUDING STROBES AND HORNS AS REQUIRED BY
CODE AND THE LOCAL GOVERNING AGENCY. THIS IS TO INCLUDE ALL WORK NECESSARY TO
MEET ALL APPLICABLE CODES AND ORDINANCES. ALL SPRINKLER HEADS TO BE IN DEAD
The plans, ideas, arrangements and designs indicated or represented by this
drawing are owned by, and are the property of BICKEL GROUP, and were
created and developed solely for use on, and in connection with this
specific project, and shall not be used, in whole or in part, for any purpose
for which they were not originally intended without written permission from
BICKEL GROUP © 2021
SHEET TITLE:
TITLE SHEET
SUB DATE 06/17/2022
BID DATE
DATE: 06/13/2022
DRAWN BY:
JOB NO:
CHECKED BY:
CENTER OF CEILING TILES AND/OR CREATE A SYMMETRICAL PATTERN IN GYP. BD. SHEEPHUNBER
CEILINGS. ANY WORK TO THE FIRE LIFE SAFETY SYSTEM SHALL BE SUBMITTED TO THE
CITY FOR A SEPARATE PERMIT.
REVISIONS
Wy DEPARTMENT OF TOXIC SUBSTANCES CONTROL d DEPARTMENT OF TOXIC SUBSTANCES CONTROL d DEPARTMENT OF TOXIC SUBSTANCES CONTROL Ro DEPARTMENT OF TOXIC SUBSTANCES CONTROL E DEPARTMENT OF TOXIC SUBSTANCES CONTROL
DATE/DELTA
Our mission is to pro vide the highest level of safety, and to protect public health and the environment fiom toxic harm. Our mission is to pro vide the highest level of safety, and to protect public health and the environment from toxic harm. Our mission is to pro vide the highest level of safety, and to protect public health and the environment from toxic harm. Our mission is to pro vide the highest level of. safety, amd to protect public health and the environment from toxic harm. Our mission is to provide the highest level of safery, and to protect public health and the environment from toxic harm.
Fact Sheet, January 2010 e Provide personnel training to personnel who manage universal waste, or who supervise Households and Conditionally Exempt Small Quantity Universal Waste Generators 1. Another handler (typically a business that specializes in collecting, storing, accumulating
Uni | Е Sh Regulatory Standards for Universal Waste personnel who manage universal waste and keep training records (CESQUWG) and shipping universal wastes). Examples:
niversa M aste Fact cet — i m m т cs pen ЫБ.
The UWR has separate requirements for of each of the three types of regulated entities: e Respond to releases of universal waste or its contents; cetermine if spill residuals аге Two categories of universal waste handlers—households and CESQUWGs—are exempt from e. A household hazardous waste facility
А hazardous waste n . : Sp 8 : з , з В
California’s Universal Waste Rule all nde ЕГЕ toss FIT TNT 1. Universal waste handlers most of the requirements of the universal waste regulations provided they comply with certain è А "Take-it-Back Partner" such as a retailer or manufacturer
оик eee cA 2. Universal waste transporters e Track shipments by keeping records of what was received and shipped (name, address, conditions. Handlers who qualify for these exemptions are not re quired:
recycle certain common hazardous wastes, termed universal wastes, in a manner that differs from e А collection event
the requirements for most hazardous wastes. The more relaxed requirements for managing
universal wastes were adopted to ensure that they are managed safely and are not disposed of in
the trash.
3. Destination Facilities quantities) for three years e To obtain an EPA ID number or otherwise notify DTSC; 2. A universal waste transporter. Examples:
Universal Waste Handlers
Universal Waste Transporters e То keep records of shipments or provide annual reports to DT SC; or
e A curbside HHW collection program
A universal waste handler is a generator of universal waste or the owner or operator of a facility A universal waste transporter is a person engaged in the offsite transportation of universal waste dL d ag e A package service (¢.g., postal service, UPS)
that receives universal waste from another universal waste handler, accumulates universal waste, by air, rail, highway or water. A universal waste transporter may be:
and sends universal waste to another universal waste handler, a facility that accepts hazardous
What are Universal Wastes? 1 lity th f k
| A ; Н e А destination facility that offers a pick-up service
A household is defined to include a single detached residence (e.g., a house) or a single unit of a destination facility that olers a pick-up service
Universal wastes are hazardous wastes that are widely produced by households and many 1. Universal waste handler carrying universal waste in his or her own vehicle
à : ae waste, or a foreign country. multiple residence unit (e.g., an apartment or condominium). Households that generate 3. Auniversal waste destination facility (generally, a facility with a permit to treat, store, or
diff sofb Universal lude tel d oth gn cound ИР ! p с лар pes that ge
he pes Cue —— atiis wastes include televisions, computers and other 2. А package shipping service (e.g., US Postal Service; FedEx, UPS) hazardous wastes other than universal wastes (e.g., paints and motor oil) can visit DTSC’s dispose of hazardous waste).
electronic = as well as Sena ар lamps, mercury thermostats, and other A universal waste handler may be: 3. A commercial carrier (e.g., a trucking company, a hauler specializing in universal waste household hazardous waste Web page (http://www. disc.ca.2 ow/HazardousWaste/UniversalW aste HHW.ctin)
mercury contaumng equipment, among others. ; 193923 m Э S à ; 4 i i ispose of the: ines availa’ fi cations accepti iversal waste i ur area:
1. А person (e.g., a household or business) who generates universal waste but does not or the operator of a destination facility that offers a universal waste pick-up service) for informe tion ШКУ property арн OL Men. а эе mde ow Ba We are а A Pj
The hazardous waste regulations (Cal. Code Regs, tit. 22, div. 4.5, ch. 11 section 66261 9) 5 np P n oe E е i —m T Es > Ifyou do not own or operate a facility that accepts, generates, accumulates, or stores A Conditionally Exempt Small Quantity Universal Waste Generator (CESQUWG) is a universal
identify seven categories of hazardous wastes that can be managed as universal wastes. Any У | v who accepts and accumulates universal waste generated by others at his or her universal waste, but you pick up and trensport universal waste (е, g., electronic waste generator who produces lessthan 100 kilograms (220 pounds) о ОКА hazardous waste
unwanted item that falls within one of these waste streams can. be handled, transported and 3 kn у һ У. 1 ч ied by vif: о СТИ. devices from office complexes) to a recycling or collection facility, you are a including universal waste that is RCRA universal waste and less than 1 kilogram of acutely For more information, see DTSC's Universal Waste Web page at:
recycled following the simple requirements set forth in the universal waste regulations (UWR) Ё -—— a 2 "w^ X ai ut d B he cniveredl s =n ww — Nu polum universal waste transporter. Universal waste trans orters do not need to notify DTSC hazardous waste in a calendar month. (RCRA hazardous waste is hazardous waste that is http//www.drsc.ca. oov Hazardous Waste Universal Wastedndex cfin
(Cal. Code Regs, tit. 22, div. 4.5, ch. 23) ee У £ or submit annual reports for their transportation activities. regulated under the hazardous waste regulations adopted by the U.S. Environmental Protections
Universal wastes are: Management Requirements for Universal Waste Handlers (Cal. Code Regs, tit. 22, sections » Universal waste transporters may store universal waste at a transfer facility for up to Agency.) ail alata ag, ea! ile a 728-0942
1. Electronic devices: Includes any electronic device that is a hazardous waste (with or 66273. 30-66273.39; additional requirements for handlers who conduct authorized treatment, о depending on Local zonne отч aste transporter who exceeds this ; ; ) Р РЕА " ;
ту аак (CRT) A commuter nm eit Cal. Code Regs, tit. 22, sections 66273.70-.77) limitis considered a universal waste handler and is subject to the handler Pursuant to section 66273.8 of title 22 of the California Code of Regulations, a generator who
у s > 8 > p > : ! requirements summarized above. meets the definition of a household or a CESOUWG is exempt from universal waste handler
phones, VCRs, computer CPUs and portable DVD players. | | e Do not dispose of universal waste or treat universal waste except as provided for in the requirements provided he or she:
2. Batteries: Most household-type batteries, including rechargeable nickel-cadmium regulations ЖИ e :
batteries, silver button batteries, mercury batteries, alkaline batteries and other batteries | : А | | Destination Facilities 1) Does not dispose of universal waste;
that exhibit a characteristic of a hazardous waste e Notify DTSC and/or obtain an EPA identification number Ji destino ае ета йур о аа сав а ау thet ects: ерене 2) Relinquishes universal waste only to another universal waste handler, a universal
3. Electric lamps: Fluorescent tubes and bulbs, high intensity discharge lamps, sodium
à : waste transporter, a destination facility, or a curbside household hazardous waste
vapor lamps and electric lamps that contain added mercury, as well as any other lamp that
collection program; and
• Use proper containment—non-leaking, compatible containers recycles a specific type of universal waste. Examples of destination facilities are hazardous waste
exhibits a characteristic of a hazardous waste. (e.g., lead). e Segregate universal waste in distinct areas mi, facilities and xar ds landfills. А. елш И = кесе the ) à — for Аа Ae
4. Mercury-containing equipment: Thermostats, mercury switches, тегс thermometers, КАЕР Е - . univers waste in accor nee wi e requirements an con tions in its zare ous waste 3) Does not con uct treatment of universe waste, except or muted activities
pressure or vacuum gauges, dilators-and weighted iine mercury БЕА flooring e Determine if materials generated when handling/recycling are hazardous wastes facility permit, unless authorized by section 66273.60 of title 22 of the California Code of enumerated in the regulations (e g., removing batteries, light bulbs, or mercury
mercury gas flow regulators dental amalgams counterweights dampers and mercury • Comply with applicable requirements for hazardous waste Regulations to manage it pursuant to the reduced requirements applicable to universal waste switches). This exemption applies only te universal waste generated by the household
added novelties such as j ewelry. NE E em Ro z . . | А 2 : handlers. A destination facility is required to follow certain rules for shipping universal wastes (eg. light bulbs, computers, televisions, thermostats, cell phones, еїс.), not to
5. CRTs The glass picture tubes гета front devices etc Ires RIEN ESTERNI Gorputer e Ifapplicable, comply with zoning requirements when storing universal wastes off-site and for rejecting shipments that contain universal waste and is required to keep records universal waste accepted from other people.
monitors: ә Have spill kits readily available to deal with accidental spills (mercury-containing of all shipments received for three years. A facility that only accepts and accumulates universal
6. CRT glass: A cathode ray tube that has been accidently broken or processed for devices) waste is not a destination facility. Such a facility is regulated as a universal waste handler. W here can I send universal wastes?
recycling. e Use proper labeling and markings
A handler may not send universal waste to a municipal solid waste (garbage) landfill or a
e Accumulate universal waste no longer than one year non-hazardous waste recycling center. All handlers of universal waste must relinquish their
universal waste to one of the following:
7. Non-empty aerosol cans
Universal Wastes may not be disposed of in the trash!
STATE OF CALIFORNIA STATE OF CALIFORNIA STATE OF CALIFORNIA STATE OF CALIFORNIA — - STATE OF CALIFORNIA
ELAS DBS МОС AND FORMALDEHYDE LIMITS FORM FORM
x - ==; 2020 Los Angeles G Building Cod C "e
FORM LA ; D RS FORM DEPARTMENT OF BUILDING AND SAFETY йисесрбсан this ferm йө тө plaid) G RN 1 1 DEPARTMENT OF BUILDING AND SAFETY 2020 Los Angeles Green Building Code GRN 15
ee 2020 Los Angeles Green Building Code GRN 1 0 ТИЗ 2020 Los Angeles Green Building Code GRN 1 0 2020 Los Angeles Green Suillding Code Tables 4.504.1, 4.504 2, 4.5043, 4504.5,5.504.4.1,5504.4.2,5.504.4.3,5.504.45 GREEN BUILDING CODE PLAN CHECK NOTES
VOC CONTENT LIMITS FORARCHITECTURAL COATINGS 24 ORM AEOR POE TMS NON-RESIDENTIAL BUILDINGS
Maximum Formaldehyde Emissions in Parts per Million.
MANDATORY REQUIREMENTS CHECKLIST REFERENCE COMMENTS Grams of VO C per Liter of Coating,
417 SOUTH HILL STREET
LOS ANGELES, CALIFORNIA
SHEET Less Water and Less Exempt Compounds ОГПУ г 1; ting systems shall be designed and installed to 19. еш pue and coatings, uda Wed Unis
ADDITIONS AND ALTERATIONS TO NON-RESIDENTIAL BUILDINGS Sh COATING CATEGORY 23 [CURRENT LIMIT ] wood р eee |. 80 а with the Volatile Organic Compound (VOC) limits listed in
eet # e.g. note #, detail # Flat coainas Hardwood ріумоой composite core | | | 005 | | | Code for Lighting Zones 14 5.504.4.3
"ge , | Partideboard __ _ [Г 0 — — —] fined in TESNA TM-15-11
(COMPLETE AND INCORPORATE THIS FORM INTO THE PLANS) orWA | || orreason for N/A Montat coings — e аа —— ——] eshown in on Table 5106.8 20. The VOC Content Verification Checklist, Form GRT 2, sha
Бей . 06/07/2022 A Е T - TA Thin medium density fiberboarc® |: | ч ө | (5106.8) verified prior to final inspection approval. The manutacturer’
Раши | ` bue Recgeting hy occupants E.T.R. BUILDING ETI. coatings Patter n thie tbk are dered tom th теа by the Calton Alr Re Board, Al Wi M MMC е жили аа.
: 4i . . . “Valtes lt are der ote spe cine п г Re sor rces Board, Alr " i145. TUN. i х ^ Л »
REFERENCE (additions that are > 30% of existing floor area тите suetoteros Ns [— — 400 — — ] Takes Control meas re of Com pos te lead Ве Bred h sooo Hance WI ASTI E 1335. Fr 2. у building or new space within a job site and be provided to the field inspector for ver
COMMENTS = - = 2 cci : additional infomation see Canaria Code сеу fors, Tite 17, Sections 33120 throwh uilding t е « more than 1,000 gal/day (5.303.1.2)
CODE SHEET 26 Testing, adjusting and balancing NO MECHANCIAL PROPOSED Bituminous roof coatings LLL OI TT nci dé ashy Tberboard bas amaxm am ti Кле ss ors; Inches @ mm) 21. All new carpet installed in the building interior meets the besting and product
i я = r REQUIREMENTS Sheet # = 27 |5.410.4.2 — Systems Bituminous roof primers ШШЕ: ШЕШЕН f ^ : 3 fixtures and fiitangs shall not exceed the maximum allowable requirements of one of the following:
SECTION e.g. note #, detail # = L У Bond breakers _ ——— A SEALANT VOC LIMIT (5.303.3) a. Carpet and Rug Institute's Green Label Plus Program
or N/A Concrete curing compounds | 10 | Less Water and Less Exempt Compounds in Grams per Liter
n | — ) —$SEALANTS Žž |
СН МЫНАНЫ | 09 | быт T —
Bridges Architectural 50
| Marine еск
Concreteimasonry sealers 100 Marine deck
Driveway sealers 50 Nonmembrane roof
50
Procedures
Reporting
Operation and maintenance manual
— Inspections and reports
Fireplace and W oodstoves NOT IN SCOPE
b. California Department of Public Health’s Spe
c. NSFYANSI 140 at the Gold level
d. Scientific Certifications Systems Indoor Advantage™ Gold
or reason for N/A
fe
a
я
З;
К
3
т
=
ч
3
R
m
E.
a
5
8
a
=
E
ES
EE
E
o
3
=
m
а.
Ei
3
ЕЧ
w
2.
О
=
=
ш
LL] L
X =
I-
о 4
=
ur
I
"IT
ч:
=O
ч
o
иш
PLANNING AND DESIGN
Storm water drainage and retention during
construction
Short-term bicycle parking
> 10 vehicular parking
NO GRADING PROPOSED 5.410.4.5.1 o only allow спе showerhead te be in operation at a time. (5. 303.3.3)
22. All new carpet cushion installed in the building interior shall mest the
Faux finishing coatings - ) ndscape Certification, Form requirements of the Carpet and Rug Institute Green Label program. (5 504.44 1)
Clear Top Coat 100 ection approval
Decorative Coatings 350 Annu (State Assembly Bill No. 1881) 23. New hardwood plywood, particle board, and medium density fib erboard
Glazes 350
Long-term bicycle parking Temporary ventilation ; NO MECHANCIAL PROPOSED Japan 350 FOROR 5 ыан ЕЕН н weather or завей m
А У m 1 : ; ; iOS
> 10 vehicular parking spaces Covering of duct openings and protection of — — — M — ҮТЕП CWMELO, $ 492.7)
Designated parking mechanical equipment during construction Floor coatings Marine deck d: ras ec exterior vall and foundation «пч elope shall be а in соор Зен ы тик un a aee e eod eurer A inne
vehi р Finish material pollutant control Form-release compounds : - conform Че Section 1403.2 and California showing formaldehyde content for all applicable wood pr 1 ereadily
> 10 vehicular parking " p Graphic arts coatings (sig i 200 ме, are CLE On una oe it bea ae в (5.407.1) available at the job site and be provided to the field ir for v xi
445)
Hightemperature coatings 420
Industrial maintenance coatings
Grading and Paving NO GRADING PROPOSED
ENERGY EFFICIENCY
Adhesives, sealants, and caulks ` GRN 15 NOTE#19
Paints and coatings
ADHESIVE VOC LIMIT 1,2
Less Water and Less Exempt Compounds in Grams
lled such that it doesn’t spray on the
(5407.2.1) 25. 80% of the total area receiving new resilient flooring 5
Ge
all comply with one or
Exterior noise transmission for windows
Traffic marking coatings 100 Contact adhesive
T
sensors and
Эрелтіот & Systems Manual shall be provided to the 29. Buildings that use Demand Control Ventilation shall have C
E.T.R. BUILDING Tub and tile refinish coatings 420
owner and the Field inspecter at the hme of final inspection (5.4104.5) ventilation controls installed in accordance w ith the
| 18 | 5.407.1 Weather protection NEW WALLS
Waterproofing membranes 100
.507.
| 52 | 5.507.4. E.T.R. BUILDING
edition of the California Energy Code, CCR, Title 24, Part 6, Section 121
50
| 150 — — ||
| 5x — 4
| 100 e
| 220 i
[———:428 — —1]
| | 100 ef
[ 38 | Aerosol райиуайа сонное Low solids codings’ __ |- 25129 — — —d more ое tabe:
Solar ready (additions 2,000 sq. ft.) таш V ifi * 2 А-0.1 GRN 15 NOTE#20 ааа ша a Indoor carpet adhesives inne: eee New exterior entries and opening s subject to foct traffic shall be protected a. VOC emission limits defined in the CHPS High Performance Products
ч 4 'erification Ё [GRN 15 МОТЕ#20 | А = г ш pad adhesives | > features such as overhangs, awnings and/or recesses Database
WATER EFFICIENCY & CONSERVATION EJ RATRE EE Metalic Baneried coatings ——— Outdoor carpet adhesives PS ora comb ined depth over the entry of at least 4 feet. (5.407.2.2.1) b. Certified under UL GREENGUARD Gold
a rores | m — i i аю nder the Resilient Floor Covering Insiluis (REC
5.303.1.1 | Additions in excess of 50,000 sq. ft. E.T.R. BUILDING TI р eee nape geen T Yond. fooring adhesive 100 —— с саана under the Resilient Floor Covering Instih CD
5.303.1.2 Excess consumption EW PLUMBING Т Primers, sealers, and undercoaters O Subtloor adhesives | — sS) E] ті ог entries and/or opening subject to d. Meet the California Department of Public Health's Specification 01350
= = 2 | 42 | aoi | У NOTE# 25 & 24 Readive penetrating sealers D 350 | Ceramictile adhesives [. — 'd1B5: -| 6.407 2.2.1) G О т
9 | 5.303.2 Water reduction | 43 | GRN 15 NOTE#25 Recycled coatings [ 250 ^] CT and asphalt tile adhesives [— — —28:— — —.] i; ' т- S
| 10 | 5.303.3 Water conserving plumbin EW PLUMBING = = | Roofooatings у $50 «X9 o mme] 11. Exterior entries shall лате flashing mtegrated with the drainage plane O
11 | 5.303.3.3 Sh head NA SHOWER | 44 | BES, - GRN 15 NOTE # 26 & 27 Roof coatings aluminum 100 hz | (5407.2.2.2) (О LO ©
| 11 | 5.303.3.3 | +s ЕЛ ДТ ТИЛИНЕ | eads INA | \ | 45 15,5047 | " prior to occupancy and recommendations for maintenance with filters cf the
5|5.504.7 Environmental tobacco smoke (ETS) control GRN 15 NOTE # 28 : - 70 ЖОЛУУ | PE GENERAN, O
| 12 | 5,304.1 Outdoor water use in landscape areas NEW L/S X E = preventative coatings 100 12. наас у E a Angeles certified hauler will be used for hauling of ТРТ б shall be included in the operation and maintenance marmal. Q í ©
- ^ - 5 = lex ellacs Cons ion w aste
| 13 | 5.304.3 Irrigation controller and sensor application EWLIS See 730 — o cA
Й - 550 Dineradhesives he special 1$; Erom land clearing shall be 27. Designated outdoor smoking area shall be at least 25 feet From an oor аш LO :
| 14 | 5.304.4 Outdoor water use meters INA ЕТК. BUILDING Exterior noise transmission prescriptive method ETR BUILDING | — —100 — -] (5.408.3) intake or operable windows (5.504.7)
15 | 5.304.5 Exterior faucets EXT. FAU Exteri «cete — f ETR BUILDING oo 100 ^ 7] " А -— + ' ОККО « N Q
16 | 5305.1 URGES d s ESTE - Xierior noise transmission for roo UIL Stans enor SS 14. A final ia re a tenp and adjusting y ш new svete shall be uem 28 и мева melor nv ee тыры ding сш, C О. А
SUS. sPayWa . _ : А :ooi ETR BUILDING Store conselidants ——— — —] — — 450 — —] ed to the held inspector prior lo final approva is rep crt shall be itle 24, Part 2 Sections entilation) an apta 14 (Exterior Walls). For
5 x = 5 " R. BUILDI Exterior noise transmission for walls na — [єтнєлв | Stone consoli dants - 450 2 individual resp or performing these services. (5.410.4.4) additional measures, see Section 5.407.2 (5 505.1) О Oo M
17 | 5.305.2 Recycled water supply to fixtures Swimming pool coatings | | 340 | +
— — od
М.
Pagel of 1
(Rev. 01/01/20) Pagelati www .ladbs.arz
CGBC CONTRACTOR NOTES:
BICKEL GROUP INCORPORATED
3600 BIRCH STREET, SUITE 120
| 19 | 5.407.2.1 Sprinklers : [ Wood coatings 000000] 275 16. All new gas£ireplaces rust be direct-vent, sealed combustion type. Wood (5.50 Pn
= | 53 | УФ. МО NEW MECHANCIAL Wood preservatives: L 350 | ЕЕЕ == = burning fies laces are prohibited per AQMD Rule 445 O LL.
| 20 | 15 NOTE#10 | 54 | 5 5( NOT IN SCOPE L ww | Meta to meal а (5.5031, AQMD Rule 445) 30. The HVAC, refrigeration, and fire suppression equipment shall net contain CFC
= =e = = "Grams of VOC per Iterotooathg, I ck dir qwater aid Bolidhgexem pt com po ti ds. - (5.508 13 «
| 21| 2 The speci d Im tt remah be tect kss reuked Imit are fed hi sibseqie itcolim as lite Plastic foams EE GENI яе най Аб аы " r on Halons сє
tb. 17. Ifthenew HV AC system is used during constriction, use return air filters with a т
| 22 | + Some valves h this table are derkied trom those specited by the Сайга Alr Resources Boa, MER of $ Replace all fi pror to occupancy. (5.504.1.3) 31. Retail food stcres of 8,000 sq. ft. or more of conditi LLI T
$ n Archtect al Coat gr 5100 std Con trol Meat tre, brany S, 2016. More атаба E i 50
| 23 | Construction waste reduction araiBbk mom te АТ На pas Board, ' И 3 куйга M ; Commercial refrigeration system witha global warriiy FWP) of 150
"ifavadierue E vred b bord dez m BTE WIES Dgelier, be 3iierUe whi tie Vglert 18. All new ducts and ether new related air distribution components openings shall or greater shall hav e leak reduction measures in accordance with LAGBC + Oo
| 24 | 5.408.3 Excavated soil and land clearing debris МОС cone it £lallbe alowed. : be covered with tape, plastic, or sheet metal until the final startup of the heating, Section 5.5082. Separate mechanical plan check is required (5 508 2) оО
- > Foradditoral lfomatio regardhig methods ip measte tie VOC core it pected hi tk cooling and ventilating equipment 5. 504.3 ^
tdk, see Sorti CoastairQualty Manag meat Окт Rik 1168, as зке "Aquen. с ? H} co
арлеу a b са gou/DRDB C/C URHTMLUR1168.P DF. N
As a covered entity under Titlell of the Americans with Disabilities Act, the City of Los Angeles does not discriminate on the basis of disability and, upon request, will Asa covered entity under Title Il of the Americans with Disabilities Act, the City of Los Angeles does not discriminate on the basis of disability and, upon request, will or LO
rovide nable acoommod: ensure = i ices a ivities. ‘i ion t sure i i iviti 5 s n " — 7 — ч — " As а covered entity under Title П of the Americans with Disabilities Act, the City of Los Angeles does not discriminate on the basis of disability and, upon request, will
provide reasonable accommodation to ensure e qual access to its programs, services end activities provide reasonable accommodation 10 ensure equal access to its programs, services and activities. As acavered entity under Title Il af the Americans with Disabilities Act, the City of Las Angeles daes nat discriminate an the basis af disability and, upan request, will ЕНЕ О B6 aii Супа] accessio its prorat, pm xem Jenn y HE T O N
Р А " А provide reasonable accammadatian ta ensure equal access ta its programs, services and activities. 7
(Res. 02/12/2020) Page 1 of 2 www. ladbs.org (Res. 02/12/2020) Page2 o 2 www. ladbs.org A A
www.Hb
P
(т) CONTRACTOR SHALL REDUCE CONSTRUCTION WASTE BY RECYCLING OR SALVAGING BY FOR RE-USE A MINIMUM ОР 68% OF THE
j CONSTRUCTION AND DEMOLITION DEBRIS, OR MEET THE LOCAL CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT ORDINANCE
WHICHEVER 15 MORE STRINGENT PER CGBC 5408.1
(2) PERCGHC 5408.1.1 CONTRACTOR TO DEVELOP AND SUBMIT TO THE ENFORCEMENT AGENCY A CONSTRUCTION WASTE MANAGEMENT PLAN THAT.
1. IDENTIFIES THE MATERIALS ТО BE DIVERTED FROM DISPOSAL BY EFFICIENT USAGE, RECYCLING, REUSE ON THE PROJECT
OR SALVAGE FOR FUTURE USE OR SALE.
2. DETERMINES IF MATERIALS WILL BE SORTED ON SITE OR MIXED.
3 |DENTIFIES THE DIVERSION FACILINES WHERE MATERIAL COLLECTED WILL BE TAKEN.
4. SPECIFIES THAT THE AMOUNT OF MATERIALS DIVERTED SHALL BE CALCULATED BY WEIGHT OR VOLUME, BUTNOT BY
CONTRACTOR SHALL UTILIZE A WASTE MANAGEMENT COMPANY THAT CAN PROVIDE VERIFIABLE DOCUMENTATION THAT THE PERCENTAGE OF
MATERIALS DIVERTED FROM THE LANDFILL COMPLY WITH THIS SECTION.
CONTRACTOR SHALL ALSO DEVELOP AND SUBMIT DOCUMENTATION TO THE ENFORCEMENT AGENCY, DEMONSTRATING COMPLIANCE WITH THIS
CONSTRUCTION WASTE MANAGEMENT PLAN PER CGBC 5.408,1.4
(зу ADDITIONS AND ALTERATIONS MEETING THE SCOPING PROVISIONS OF CGBC 301.3 SHALL REQUIRE VERIFIVATION THAT UNIVERSAL WASTE ITEMS
AS NOTED IN UNIVERSAL WASTE NOTES ARE DISPOSED OF PROPERTY AND DELIVERED FROM LANDFILLS.
(а) 100% OF TREES, STUMPS, ROCKS, AND ASSOCIATED VEGETATION AND SOILS RESULTING PRIMARILY FROM LAND CLEARING SHALL BE REUSED
OR RECYCLED PER CGBC 5.408.3
(5) PERCGBC 5410.2, FOR NEW BUILDINGS 10,000 SF AND OVER, BUILDING COMMISSIONING SHALL BE INCLUDED IN THE DESIGN AND
PROGRESS OF THE BUILDING PROJECT TO VERIFY THAT THE BUILDING SYSTEMS AND COMPONENTS MEET THE OWNER'S OR OWNERS
REPHESENTATIVE'S PROJECTREQUIREMENTS. COMMISSIONING SHALL BE PERFORMED IN ACCORDANCE WITH THIS SECTION BY TRAINED
PERSONNEL WITH EXPERIENCE ON PROJECT OF COMPARABLE SIZE AND COMPLEXITY. COMMISSIONING REQUIREMENTS SHALL INCLUDE:
1. OWNER'S OR OWNER REPRESEN TATIVE'S PROJECT REQUIREMENTS
2, BASIS OF DESIGN
3, COMMISSIONING MEASURES SHOWN IN THE CONSTRUCTION DOCUMENTS
4, COMMISSIONING PLAN
5, FUNCTIONAL PERFORMANCE TESTING
& DOCUMENTATION AND TRAINING
7, COMMISSIONING REPORT
8. TESTING AND ADJUSTING
(8) РЕК СОВС 54104.2, FOR BUILDINGS LESS THAN 10,000 SF, CONTRACTOR SHALL DEVELOP A WRITTEN PLAN OF PROCEDURES FOR TESTING
AND ADJUSTING THE FOLLOWING SYSTEMS:
NOTES: 1. HVAC SYSTEMS AND CONTROLS
ТАМАРА МЕ 2 INDOOR AND OUTDOOR LIGHTING AND CONTROLS
3, WATER HEATING SYSTEMS
1. OUTDOOR LIGHTING SYSTEM SHALL BE DESIGNED AND INSTALLED TO COMPLY WITH ALL OF THE FOLLOWING: 4, RENEWABLE ENERGY SYSTEMS
d. THE MINIMUM REQUIREMENTS IN CALIFORNIA ENERGY CODE FOR LIGHTING ZONES 1-4 5 LANDSCAPE IRRIGATION SYSTEMS
b. BACKLIGHT. UPLIGHT AND GLARE (BUG) RATINGS AS DEFINED IN IESNA TM-15-11 eee ee
с. ALLOWABLE BUG RATING NOT EXCEEDING THOSE SHOWN IN ON TABLE 5.106.8
Ст) HVAC SYSTEM SHALL BE BALANCED IN ACCORDANCE WITH APPROVED NATIONAL STANDARDS PER CGBC 5.4104.3.1
2. A COPY OF THE CONSTRUCTION DOCUMENTS OR A COMPARABLE DOCUMENT INDICATING THE INFORMATION FROM ENERGY CODE SECTION 110.10(b) THROUGH 110.10(c) SHALL BE PROVIDED TO THE OCCUPANT. (ENERGY CODE 110.10(d)) jg SERRE E ee eee s esae ea e M ЧИЕ
RESPONSIBLE FOR PERFORMING THESE SERVICES PER CGBC 5.41044
FOR BUILDINGS IN EXCESS OF 50,000 sq. ft., SEPARATE SUBMETERS SHALL BE INSTALLED AS FOLLOWS:
(9) CONTRACTOR TO PROVIDE BUILDING OWNER OR REPRESENTATIVE WITH AN OPERATION AND MAINTENANCE MANUAL WITH CONTENTPER CGBC
FOR EACH INDIVIDUAL LEASED, RENTED OR OTHER TENANT SPACE WITHIN THE BUILDING PROJECTED TO CONSUME MORE THAN 100 HAL/DAY. 54104.5. A COPY OF THE OPERATION AND MAINTENANCE MANUAL SHALL BE PLACED IN THE BUILDING AT THE TIME OF FINAL INSPECTION. ЭНЕЕТ ШШЕ:
WHERE METERS FOR INDIVIDUAL BUILDINGS TENANTS ARE INFEASIBLE, FOR WATER SUPPLIED TO THE FOLLOWING SUBSYSTEMS:
MAKEUP WATER FOR EVAPORATED COOLERS GRATER THEN о OGM FINAL STARTUP WIM TAPE, PLAST, SHEET METAL OR OTHER ACCEPTABLE METHODS TO REDUCE THE AMOUNT OF OUST AND DEBRIS.
STEAM AND HOT-WAER BOLERS ИТН ENERGY INPUT MORE THAN 5000 Btu/h PHH MAY COLECTII MESSER GRE ааз.
с. FOR EACH BUILDING THAT USES MORE THAN 100 GALLONS DAY ON A PARCEL CONTAINING MULTIPLE BUILDINGS (5.303.1.1.) CA GREEN
CONTRACTOR TO INCLUDE А COPY OF ALL INSPECTION VERIFICATIONS AND REPORTS REQUIRED BY ENFORCING AGENCY PER CGBC 5.41045.1
Е BUILDING NOTES
4. LOCKS SHALL BE INSTALLED ON ALL PUBLICLY ACCESSIBLE EXTERIOR FAUCETS AND HOSE BIBS. (5.3045)
5. FOR SITES OVER 500 SQUARE FEET OF LANDSCAPE AREA, WASTE PIPING SHALL BE ARRANGED TO PERMIT DISCHARGE FROM THE CLOTHES WASHER, BATHTUB, SHOWERS, AND BATHROOM/RESTROOMS WASH BASINS ТО BE USED FOR A FUTURE GRAYWATER IRRIGATION SYSTEMS. (5.305.1)
6. WATER USED IN THE BUILDING FOR WATER CLOSETS, URINALS, FLOOR DRAINS, AND PROCESS COOLING AND HEATING SHALL COME FROM CITY-RECYCLE WATER IF AVAILABLE FOR USE WITHIN 200 FEET OF THE PROPERTY LINE. (5.302.2)
7. COOLING TOWERS SHALL HAVE A MIN. OF 6 CYCLES OF CONCENTRATION (BLOWDOWN) OR HAVE A MIN. OF 50% OF MAKEUP WATER SUPPLY TO COOLING TOWERS COME FROM NON-POTABLE WATER SOURCES. (5.305.3) SUB DATE 08022022
8. WHERE GROUNDWATER IS BEING EXTRACTED AND DISCHARGED, A SYSTEM FOR ONSITE REUSE OF THE GROUNDWATER SHALL BE DEVELOPED AND CONSTRUCTED IF THE GROUNDWATER WILL NOT BE DISCHARGED TO THE SEWER. (4.305.4) Вр
9. AN AIR FILTER WITH MIN. EFFICIENCY REPORTING VALUE (MERV) OF 8 OR HIGHER SHALL BE INSTALLED IN THE MECHANICAL SYSTEM FOR OUTSIDE AND RETURN AIR PRIOR TO OCCUPANCY. (5.504.5.3) SEAT BY: E
10. THE BUILDING SHALL MEET OR EXCEED THE PROVISIONS FOR MECHANICAL VENTILATION OF SECTION 1302 OF THE LOS ANGELES BUILDING CODE. (5.505.1) CHECKED BY: Е
11. BUILDING IS NOT LOCATED WITHIN 1000’ ОЕ A FREEWAY, 5МІ. OF AN AIRPORT, NOR IN A LOCATION WHERE THE SOUND LEVEL AT THE PROPERTY LINE EXCEEDS 65 DECIBELS. SHEET NUMBER
12. BUILDING IS NOT EXPOSED TO A NOISE LEVEL OF 65 DECIBELS Leq-ihr DURING ANY HOUR OF OPERATION.
SPECIAL PROCEDURES FOR
HISTORIC TREATMENT
PART 1 - GENERAL
1.1
A.
1.2
1.3
1.4
RELATED DOCUMENTS
Drawings and general provisions of the Contract, including General and
Supplementary Conditions and other Division 1 Specification Sections, apply to this
Section.
SUMMARY
This Section includes special procedures for historic treatment on Project including, but
not limited to, the following:
Storage and protection of existing historic materials.
Temporary protection of historic materials during construction.
Protection during application of chemicals.
Protection during use of heat-generating equipment.
Historic treatment procedures.
оС рә;
Related Sections include the following:
1. ADD HERE ANY RELATED SECTIONS AS NECESSARY
DEFINITIONS
"Preservation": To apply measures necessary to sustain the existing form, integrity,
and materials of a historic property. Work may include preliminary measures to protect
and stabilize the property.
01 35 28 Special Procedures for Historic Treatment
1
"Rehabilitation: To make possible a compatible use for a property through repair,
alterations, and additions while preserving those portions or features that convey its
historical, cultural, or architectural values.
"Restoration": To accurately depict the form, features, and character of a property as it
appeared at a particular period of time by means of the removal of features from other
periods in its history and the reconstruction of missing features from the restoration
period.
"Reconstruction": To reproduce in the exact form and detail a building, structure, or
artifact as it appeared at a specific period in time.
"Stabilize": To apply measures designed to reestablish a weather-resistant enclosure
and the structural reinforcement of an item or portion of the building while maintaining
the essential form as it exists at present.
"Protect and Maintain": To remove deteriorating corrosion, reapply protective coatings,
and install protective measures such as temporary guards; to provide the least degree
of intervention.
"Repair": To stabilize, consolidate, or conserve; to retain existing materials and
features while employing as little new material as possible. Repair includes patching,
piecing-in, splicing, consolidating, or otherwise reinforcing or upgrading materials.
Within restoration, repair also includes limited replacement in kind, rehabilitation, and
reconstruction, with compatible substitute materials for deteriorated or missing parts of
features when there are surviving prototypes.
"Replace" To duplicate and replace entire features with new material in kind.
Replacement includes the following conditions:
1. Duplication: Includes replacing elements damaged beyond repair or missing.
Original material is indicated as the pattern for creating new duplicated elements.
2. Replacement with New Materials: Includes replacement with new material when
original material is not available as patterns for creating new duplicated elements.
3. Replacement with Substitute Materials: Includes replacement with compatible
substitute materials. Substitute materials are not allowed, unless otherwise
indicated.
01 35 28 Special Procedures for Historic Treatment
2
"Remove": To detach items from existing construction and legally dispose of them
off-site unless indicated to be removed and salvaged or removed and reinstalled.
"Remove and Salvage": To detach items from existing construction and deliver them to
Owner.
"Remove and Reinstall": To detach items from existing construction, repair and clean
them for reuse, and reinstall them where indicated.
"Existing to Remain" or "Retain": Existing items of construction that are not to be
removed and that are not otherwise indicated to be removed and salvaged, or removed
and reinstalled.
"Material in Kind": Material that matches existing materials, as much as possible, in
species, cut, color, grain, and finish.
SUBMITTALS
Historic Treatment Program: Submit a written plan for each phase or process including
protection of surrounding materials during operations. Describe in detail materials,
methods, and equipment to be used for each phase of work.
Alternative Methods and Materials: If alternative methods and materials to those
indicated are proposed for any phase of work, provide a written description including
evidence of successful use on other, comparable projects, and program of testing to
demonstrate effectiveness for use on this Project.
Qualification Data: For historic treatment specialists and supervisory personnel.
Include list of completed projects with the scope of work and budget for each.
Photographs or Videotape: Show existing conditions of adjoining construction and site
improvements, including finish surfaces, that might be misconstrued as damage
caused by historic treatment operations. Submit before work begins.
Record Documents: Include modifications to manufacturer's written instructions and
procedures, as documented in the historic treatment preconstruction conference and
as the Work progresses.
01 35 28 Special Procedures for Historic Treatment
3
1.5 QUALITY ASSURANCE
A. Historic Treatment Specialist Qualifications: A firm that employs personnel, including
supervisory personnel, experienced and skilled in the processes and operations
indicated.
B. Historic Treatment Preconstruction Conference: Conduct conference at Project site to
comply with requirements in Division 1 Section "Project Management and
Coordination."
|Ё Review manufacturer's written instructions for precautions and effects of products
and procedures on building materials, components, and vegetation.
a. Record procedures established as a result of the review and distribute to
affected parties.
1.6 STORAGE AND PROTECTION OF HISTORIC MATERIALS
A. | Removed and Salvaged Historic Materials:
1. Clean salvaged historic items.
2. Pack or crate items after cleaning. Identify contents of containers.
3. Store items in a secure area until delivery to Owner.
4. — Transport items to Owner's storage area designated by Owner.
5. Protect items from damage during transport and storage.
6. Do not dispose of items removed from existing construction without prior written
consent of Owner.
B. Removed and Reinstalled Historic Materials:
1. Clean and repair historic items to functional condition adequate for intended
reuse.
2. Pack or crate items after cleaning and repairing. Identify contents of containers.
3. Protect items from damage during transport and storage.
4 Reinstall items in locations indicated. Comply with installation requirements for
new materials and equipment. Provide connections, supports, and
miscellaneous materials necessary to make item functional for use indicated.
C. Existing Historic Materials to Remain: Protect construction indicated to remain against
damage and soiling during historic treatment. When permitted by Architect, items may
be removed to a suitable, protected storage location during historic treatment and
cleaned and reinstalled in their original locations after historic treatment operations are
complete.
01 35 28 Special Procedures for Historic Treatment
4
D. Storage and Protection: When removed from their existing location, store historic
materials within a weather tight enclosure where they are protected from wetting by
rain, snow, or ground water, and temperature and humidity ranges that are appropriate
for the items stored. Secure stored materials to prevent theft. Historic materials are
irreplaceable; therefore, protective custody is essential. Damage and loss shall be
prevented, since repair and replacement may not be possible. These requirements
apply to any subcontractors or others given custody of the items.
Р Identify removed items with an inconspicuous or reversible mark indicating their
original location.
1.7 PROJECT-SITE CONDITIONS
A. Exterior Cleaning and Repairing:
T. Proceed with the work only when forecasted weather conditions are favorable.
a. Wet Weather: Do not attempt repairs during rainy or foggy weather. Do
not apply primer, paint, putty, or epoxy when the relative humidity is above
80 percent. Do not remove exterior elements of structures when rain is
forecast or in progress.
b. Do not perform exterior wet work when the air temperature is below 40
deg F (5 deg C).
б. Do not begin cleaning, patching, or repairing when there is any likelihood of
frost or freezing.
d. Do not begin cleaning when either the air or the surface temperature is
below 45 degF (7 degC) unless approved means are provided for
maintaining a 45 deg Е (7 deg C) temperature of the air and materials
during, and for 48 hours subsequent to, cleaning.
2. Perform cleaning and rinsing of the exterior only during daylight hours.
01 35 28 Special Procedures for Historic Treatment
5
PART 2 - PRODUCTS - (Not Used)
PART 3 - EXECUTION
3.1 PROTECTION, GENERAL
A. | Comply with manufacturer's written instructions for precautions and effects of products
and procedures on adjacent building materials, components, and vegetation.
B. Ensure that supervisory personnel are present when work begins and during its
progress.
C. Temporary Protection of Historic Materials during Construction:
1. Protect existing materials during installation of temporary protections and
construction. Do not deface or remove existing materials.
2. Attachments of temporary protection to existing construction shall be approved
by Architect prior to installation.
D. Review and coordinate with Architect and Landscape Architect to protect landscape
work adjacent to or within work areas as follows:
Ti Provide barriers to protect tree trunks.
2. Bind spreading shrubs.
3. Use coverings that allow plants to breathe and remove coverings at the end of
each day. Do not cover plant material with a waterproof membrane for more than
8 hours at a time.
4. Set scaffolding and ladder legs away from plants.
E. Existing Drains: Prior to the start of work or any cleaning operations, test drains and
other water removal systems to ensure that drains and systems are functioning
properly. Notify Architect immediately of drains or systems that are stopped or blocked.
Do not begin Work of this Section until the drains are in working order.
1. Provide a method to prevent solids including stone or mortar residue from
entering the drains or drain lines. Clean out drains and drain lines that become
blocked or filled by sand or any other solids because of work performed under
this Contract.
2. Protect storm drains from pollutants. Block drains or filter out sediments,
allowing only clean water to pass.
01 35 28 Special Procedures for Historic Treatment
6
3.2
3.3
PROTECTION DURING USE OF HEAT-GENERATING EQUIPMENT
Comply with the following procedures while performing work with heat-generating
equipment, including welding, cutting, soldering, brazing, paint removal with heat, and
other operations where open flames or implements utilizing heat are used:
1. Obtain Owner's approval for operations involving use of open-flame or welding
equipment.
a. Notification shall be given for each occurrence and location of work with
heat-generating equipment.
2. As far as practical, use heat-generating equipment in shop areas or outside the
building.
3. Before work with heat-generating equipment commences, furnish personnel to
serve as a fire watch (or watches) for location(s) where work is to be performed.
4. Do not perform work with heat-generating equipment in or near rooms or in areas
where flammable liquids or explosive vapors are present or thought to be
present. Use a combustible gas indicator test to ensure that the area is safe.
5. Remove and keep the area free of combustibles, including, rubbish, paper,
waste, etc., within area of operations.
a. If combustible material cannot be removed, provide fireproof blankets to
cover such materials.
6. Where possible, furnish and use baffles of metal or gypsum board to prevent the
spraying of sparks or hot slag into surrounding combustible material.
if Prevent the extension of sparks and particles of hot metal through open windows,
doors, holes, and cracks in floors, walls, ceilings, roofs, and other openings.
8. Do not use heat for paint removal.
9. Do not use heat for surface operations where there is flammable material hidden
below the surface.
10. Inspect each location of the day's work not sooner than 30 minutes after
completion of operations to detect hidden or smoldering fires and to ensure that
proper housekeeping is maintained.
HISTORIC TREATMENT PROCEDURES
The principal aim of preservation work is to halt the process of deterioration and
stabilize the item's condition, unless otherwise indicated. Repair is required where
specifically indicated. The following procedures shall be followed:
75 Retain as much existing material as possible; repair and consolidate rather than
replace.
01 35 28 Special Procedures for Historic Treatment
7
2; Use additional material ог structure to reinforce, strengthen, prop, tie, and
support existing material or structure.
3. Use reversible processes wherever possible.
4. Use traditional replacement materials and techniques. New work shall be
distinguishable to the trained eye, on close inspection, from old work.
5. Record the work before the procedure with preconstruction photos and during the
work with periodic construction photos. Photographic documentation is specified
in Division 1 Section "Construction Progress Documentation.”
Prohibit smoking by personnel performing work on or near historic structures.
Obtain Architect's review and written approval in the form of a Constructive Change
Directive or Supplemental Instruction before making changes or additions to
construction or removing historic materials.
Notify Architect of visible changes in the integrity of material or components whether
due to environmental causes including biological attack, UV degradation, freezing, or
thawing; or due to structural defects including cracks, movement, or distortion.
1. Do not proceed with the work in question until directed by Architect.
Where Work requires existing features to be removed, cleaned, and reused, perform
these operations without damage to the material itself, to adjacent materials, or to the
substrate.
Identify new or replacement materials and features with inconspicuous, permanent
marks to distinguish them from original materials. Record the legend of identification
marks and the locations of these marks on Record Drawings.
When cleaning, match samples of existing materials that have been cleaned and
identified for acceptable cleaning levels. Avoid over cleaning to prevent damage to
existing materials during cleaning.
END OF SECTION 01 35 28
01 35 28 Special Procedures for Historic Treatment
8
PROTECTION OF HISTORIC
FEATURES
1.1 SUMMARY
A.
Includes (but is not necessarily limited to):
1. Protection from damage due to construction activities of all historic features to
remain.
2. Cataloguing, removal, and storage of all historic features indicated or as required to
accommodate new construction.
1.2 REFERENCES
A.
B.
“May Co. Salvage Plan,” Paratus Group with Historic Resources Group, February 26,
2015.
NFPA 241. Safeguarding Building Construction and Demolition Operations, National Fire
Protection Agency, Quincy, MA.
1.3 DEFINITIONS
A.
“Historic features” are defined as those materials, finishes, components and areas
identified as significant in the Environmental Impact Report (EIR), and in this case, are
indicated to remain in place, or to be removed and salvaged as part of the work.
“Salvage features” are defined as any historic feature to be removed from the existing
construction and to be retained, repaired and/or modified for potential reuse.
“Off-site facility” is defined as any storage facility to be provided by the contractor or any
subcontractor for storage of salvage features.
“Primary path of construction travel” is defined as those areas that will require a high
level of protection.
. “Secondary path of construction travel” is defined as those areas required for access to
construction procedures.
“Artifact log” is defined as the log form supplied by the contractor and approved the
Architect for cataloguing of salvage features.
1.4 QUALITY ASSURANCE
Protection of Historic Features
1
Contractor qualifications: All historic rehabilitation and restoration work shall be
performed by skilled contractors having not less than 5 years satisfactory experience in
comparable protection, salvage, and removal operations including work on at least 2
projects similar in scope and scale to this project. Provide prequalification documents for
review and approval.
. Contractor shall recognize the value and significance of the May Company Wilshire
building and exercise special care during the work to ensure that existing details,
materials, and finishes which are to remain are not damaged by the work being
performed. This is a historic preservation project; damage is to be prevented.
Replacement is not an equivalent treatment.
Contractor shall be responsible for protection of all existing materials and components to
remain in place or be salvaged throughout the duration of construction. Extent of
protection is to cover all historic features to remain that are in the vicinity of construction
activities, or may be harmed by the movement of materials through the project site,
whether specifically called out on the drawings, or not. All questionable protection
requirements should be identified for Architects review. In the event of damage, such
items shall be repaired or replaced by the contractor at his expense, to the satisfaction of
the Architect and Owner.
. The contractor responsible for the repair or rehabilitation of salvaged features shall also
be responsible for the cataloguing, disassembly, storage, and reinstallation of features.
Protection is to be secured adequately so as to maintain a safe environment for workers
throughout the duration of the project.
1.5 SUBMITTALS
Submit contractor qualifications as listed in Quality Assurance section above.
. Work Description: Submit work description detailing proposed methods and operations
for cataloguing, removal of features, and transportation of items to off-site storage;
protection of features in storage; and protection of features to remain on site.
Artifact Log: Submit sample artifact log prior to commencement of the work. Submit
completed artifact log at the completion of feature removal from the site, and periodically
as the work progresses.
Off-site Storage Facilities: Submit detailed description of building and/or other areas
proposed for storage of removed historic features. Include location, size, physical
attributes, security techniques and procedures, and other pertinent information relating
to the storage of salvaged features.
Shop Drawings: Submit complete set of shop drawings recording on elevations or plans
the location, configuration, and description of all features removed for salvage that will
Protection of Historic Features
2
require reconstruction in its original location. Include location of features, joint locations,
size, spacing, surface-mounted features, materials, conditions and all dimensions so that
feature can be reconstructed in its entirety. Minimum scale 7" = 1'-0”. Existing
construction drawings may be used as base sheets for shop drawings.
1.6 SITE CONDITIONS
A.
С.
Coordinate the performance of work of this section with related or adjacent work.
Removal and protection of items shall be completed prior to commencement of
demolition or new construction activities in each area. At a minimum, install protection in
its entirety for a given feature or area prior to commencement of any demolition
activities.
. At the end of each work day, or during inclement weather, cover work exposed to
weather with waterproof coverings, securely anchored.
Protection of historic features shall remain in place for the duration of the entire project,
unless determined otherwise by the Owner.
PART 2 - PRODUCTS
1
2
2.1 SALVAGE
A.
Carefully catalogue, label, disassemble, transport and store salvage features using
submitted and approved methods.
2.2 PROTECTION MATERIALS
A.
B.
Polyethylene sheets: 4 mil. (general protection purposes)
Lumber: Species to be selected by contractor, sizes to fit field conditions. All lumber to
be fire retardant. Lumber shall not be in direct contact with an historic feature.
. Plywood: % inch, % inch, or 1 inch, fire retardant as required. For “hard” protection at
selected features; shall not be in direct contact with an historic feature.
Soft fiberboard: Homasote Company, Box 7240, West Trenton, NJ 08628.
1. Ve inch Homasote 440.
Protection of Historic Features
3
2. У inch Homasote МСЕК for applications requiring fire ratings.
Neoprene: % inch or % inch strips, stock lengths.
Polyurethane foam sheets: 2 inches and 4 inches thick, as required, and flexible wraps,
as required.
Papers: Brown paper: Kraft paper; permeable wrap: “Tyvek.”
Preservation tape: 3M Scotch brand, number 4811.
Accessories: Fasteners, nails, screws, bolts, anchors or other devices required to
complete installation, sizes as required, but shall not be in direct contact with an historic
feature.
2.3 OFF-SITE FACILITY REQUIREMENTS
A.
Size: Furnish off-site facility of sufficient size and capacity to store and retrieve salvage
features. More than one facility can be provided as long as all physical requirements
listed below are met at each facility.
Physical Requirements:
1. Adequate floor loading capacity to support salvage features.
2. Covered loading and unloading area to allow for transport of features without
exposure to inclement weather conditions.
3. Temperature and humidity: Maintain ambient temperature from a minimum of 45
degrees F to a maximum of 100 degrees F. Maintain relative humidity between 20
percent and 80 percent. Climate control is not required if these conditions can be
met. Configure space to allow for adequate ventilation of stored features. Provide
mechanical devices to circulate air if natural ventilation is inadequate.
4. Artificial light: Provide adequate artificial light to allow for proper handling of features
and for potential examination of features while being stored.
5. Sunlight: Provide adequate protection from sunlight to prevent ultraviolet damage to
stored features.
6. Water protection: Protect stored features and packing materials from exposure to
water, water vapor or high humidity.
7. Vermin control: Protect all stored features from vermin and pests.
Protection of Historic Features
4
8. Fire protection: Storage space must have a functioning smoke alarm. Contractor may
be required to have a fire detection and notification system in place, depending on
the space and the number and value of features being stored.
C. Security: Facility must be bonded with sufficient bonding capacity to suitable replicate
and replace all features stored within the space.
PART 3- EXECUTION
М
2.
3.1 GENERAL
A. Historic features to remain in situ:
1. Install protection in its entirety before commencement of demolition or other work
that may harm historic feature.
2. Protect all historic features to remain in place during construction that may be
damaged by construction activities. In the event of new damage, contractor is to
notify the Architect and Owner immediately as to the nature and extent of damage
and the proposed method for repair. Contractor shall be responsible for repairs and
replacement of newly damaged items to the satisfaction of the Architect and Owner,
at no additional cost to the Owner. Be aware that the inherent value of an historic
original feature is higher than the value of a modern replica of that feature.
3. Do not attach protection materials directly to historic features.
4. Secure protection adequately so as to maintain a safe environment for workers and
other individuals using the site throughout the duration of the project.
B. Features to be removed for salvage or repair:
1. Catalogue, label, disassemble, transport and store historic features which have been
identified for removal. Contractor is responsible for handling, transporting and
storage of the items in the storage facility.
2. Catalogue all salvage features that have been removed on an artifact log. At a
minimum, document feature type, unique number, size, configuration, quantity,
condition, original location, disposition, and location in storage.
3. Store all salvage features in a neat, orderly fashion to allow for access and retrieval.
Store like type features together in groups. Store particularly fragile features in a
manner to prevent damage while in storage.
Protection of Historic Features
5
3.2 PREPARATION
A. Remove all debris and impediments to allow for full access as required to perform
protection of historic features, and for demolition and construction. Protect all historic
features from damage during the removal procedures as specified.
B. Verify condition of the off-site facility to ensure that there is adequate capacity and
access to store and retrieve salvage features.
C. Transport items to the off-site facility as often as necessary to avoid stockpiling items on
site.
3.3 INSTALLATION OF PROTECTION
A. Alternative methods to specified protection may be acceptable if equal or greater
protection is provided. Submit alternate methods to Architect and Owner for review and
approval. Do not proceed with alternate methods until approvals are secured.
B. Protection shall be required to remain in place for the duration of the Project. Install
materials to provide protection throughout the duration of the Project. Protection may
have to be removed during the project for access to protected features, etc. If protection
is temporarily removed, reinstall after work is complete and maintain protection
throughout the duration of the project, including repair and replacement due to wear and
tear.
C. Extent of protection covers all historic features that will remain during construction,
whether specifically called out on the drawings or not. Temporary protection may be
required in areas to perform specific work activities.
D. All protection assemblies shall be self-supporting and self-bracing.
3.4 REMOVAL OF SALVAGE FEATURES
A. General:
1. Exercise extreme care in removing features for salvage and materials attached to
historic features that are to remain.
2. Unbolt bolted connections; leave any embedded connector undisturbed and in place.
3. Unscrew screwed connections; leave embedded connector undisturbed and in place.
4. Do not pry apart members whose finish will be damaged by chipping, crazing or
cracking, or whose structural integrity will be compromised.
Protection of Historic Features
6
5. Remove all nails from wood features from the backside. Drive nails through or pull
from the back so that the head does not splinter the finish face.
6. Remove items whole whenever possible. Where cuts are required, make cuts cleanly
and with the proper tool at logical break points.
B. Light Fixtures: Remove light fixtures in whole units. Protect existing wiring if wiring will be
reused. Wrap with Tyvek, pad with foam, and package in large corrugated cardboard
moving boxes, or custom fabricated plywood crates.
3.5 CATALOGUING OF SALVAGE FEATURES
A. General: Label features in a manner to permit identification of object and its original
location and configuration. Contractor to submit proposed method for labeling and
cataloguing salvage features.
B. Numbering and Cataloguing: Each item removed for salvage or repair shall be given a
unique catalog number which is to be marked on the feature in a permanent medium
(i.e., permanent marker, inscription, or attached metal tag), and listed on the artifact log.
Label the features on the backside or in another obscure location. Contractor to submit
proposed artifact log.
3.6 STORAGE
A. Transport items to off-site storage facility. Store features in the same orientation as they
are installed on site.
B. Organize features so that they are readily retrievable. Store like features together. All
packaging and all features shall be labeled and keyed to a location plan.
3.7 REINSTALLATION
A. Reinstall features removed for rehabilitation in their original location unless otherwise
noted.
B. Contractor is responsible for proper inventorying and distribution to appropriate
subcontractors of salvaged material for reinstallation. Chain of custody from removal to
storage to reinstallation shall be noted and signed by responsible construction staff for
each item.
END OF SECTION
Protection of Historic Features
7
REVISIONS
DATE/DELTA REMARKS
417 SOUTH HILL STREET
LOS ANGELES, CALIFORNIA
2.
О
=
=
ш
LL +.
X =
=
о 4
EM
ur
I
"IT
~E
=O
ч
o
иш
СА 92660
949.757.0511
F
949.757.0411
3600 BIRCH STREET, SUITE 120
www .bickelgrp.com
NEWPORT BEACH,
P
SHEET TITLE:
Standard
For
Rehabilitation
SUB DATE 06/07/2022
| EDDATE 00000000000 DATE
DATE: 05/23/2022
DRAWN BY: TA
JOB NO: 21051
CHECKED BY: EM
SHEET NUMBER:
A—O.2AÀ
Methods Of Cleaning Dirt On Marble
Procedure code:
445506S
Source:
Tacoma Union Station Courthouse/Tacoma, Wa - Gsa/Pbs
Division:
Masonry
Section:
Marble
Last Modified:
06/28/2017
PART 1---GENERAL
1.01 SUMMARY
A. This procedure includes guidance on cleaning honed and polished marble surfaces by machine buffing or using liquid cleaners
or mild detergents.
B. Safety Precautions: When working with chemicals, workersshould wear protective clothing including goggles, face shields,
gloves, etc. in compliance with governing federal safety codes and regulations.
C. See 01100-07-S for general project guidelines to be reviewed along with this procedure. These guidelines cover the following
sections:
1. Safety Precautions
2. Historic Structures Precautions
3. Submittals
4. Quality Assurance
5. Delivery, Storage and Handling
6. Project/Site Conditions
7. Sequencing and Scheduling
8. General Protection (Surface and Surrounding)
These guidelines should be reviewed prior to performing this procedure and should be followed, when applicable, along with
recommendations from the Regional Historic Preservation Officer (RHPO).
1.02 QUALITY ASSURANCE
A. Mock-Ups: Prior to start of general marble cleaning, prepare the following sample panels on building where directed by RHPO.
Obtain RHPO's acceptance of visual qualities before proceeding with the work. Retain acceptable panels in undisturbed condition,
suitably marked, during cleaning as a standard for judging completed work.
1. Demonstrate materials and methods to be used for each type of cleaning and resurfacing for each type of marble surface
and condition on sample panels of approximately 10 sq. ft. in area.
2. Have manufacturer's representative present when the sample work is being done and when the sample work is being
inspected for approval.
3. Test adjacent non-marble materials for possible reaction with cleaning materials.
4. Allow waiting period not less than 7 calendar days after completion of sample cleaning to permit study of sample panels for
negative reactions.
PART 2---PRODUCTS
2.01 MANUFACTURERS
A. BASF-Wyandotte Corporation Chemical Specialties Division 1609 Biddle Wyandotte, MI 48192 313/246-6100
B. ProSoCo, Inc. 755 Minnesota Avenue P.O. Box 1578 Kansas City, KS 66117 800/255-4255 or 913/281-2700
C. Eastern Marble Supply Company P.O. Box 392 Scotch Plains, NJ 07076 908/789-6400
2.02 MATERIALS
A. Liquid Marble Cleaner: A water-soluble non-acidic chemical cleaner manufactured specifically for restorative type cleaning of
polished and honed marble surfaces. Cleaner shall contain no abrasives, grease, lye, or other caustic or corrosive ingredients, such
as "Sure Klean Liquid Marble Cleaner" (ProSoCo, Inc.) or approved equal.
-OR-
Cleaning Detergent: A mildly alkaline phosphorous-free biodegradable liquid soap.
-OR-
Household ammonia and distilled water
B. Cleaning Compound for Buffing a Honed Finish: An abrasive cleaning compound, containing no caustic or harsh fillers,
manufactured specifically for restorative type cleaning of honed marble surfaces such as "Wyandotte Detergent" (BASF-Wyandotte
Corporation) or approved equal.
-OR-
Polishing Agent for Buffing a Polished Finish: A finely ground buffing powder manufactured specifically for restorative type
polishing of polished marble surfaces, such as "Marbalite 452" (Eastern Marble Supply Company) or approved equal.
C. Clean, potable water
2.03 EQUIPMENT
A. Buffing pads for Polished Finish: Fiber brush pads manufactured specifically for restorative type polishing of polished marble
surfaces
-OR-
Buffing Pads for Honed Finish: Synthetic pads manufactured specifically for restorative type cleaning of honed marble surfaces
B. Soft natural bristle brushes (DO NOT USE WIRE BRUSHES OR STEEL WOOL)
C. Circular buffing machine (for floors)
-OR-
Hand-held buffing machine (for surfaces other than floors)
D. Mop and bucket (non-metallic)
E. Sponges
F. Clean, dry cloths
PART 3---EXECUTION
3.01 PREPARATION
A. Protection: Prevent chemical cleaning and stain removal solutions from coming into contact with other surfaces which could be
damaged by such contact.
B. Surface Preparation:
1. Prior to cleaning, remove cellophane tape, masking tape, etc. from surface.
3.02 ERECTION, INSTALLATION, APPLICATION
NOTE: Perform each cleaning method indicated in a manner which results in uniform coverage of all surfaces, including corners,
moldings, interstices and which produces an even effect without streaking or damage to marble surfaces. CLEAN TO ACHIEVE A
DESIRED (NOT NEW) APPEARANCE.
A, Cleaning Honed Marble:
1. Machine buff with a cleaning compound (see Materials, Section 2.02 B. above):
m
. Thoroughly wet honed marble surface with hot water.
2. Sprinkle cleaning compound onto surface.
3. Buff surfaces using a large circular buffing machine with a synthetic pad for floors or a hand-held machine for other
surfaces to lift dirt build-up.
4. Treat edges and corners of surfaces not accessible with the hand-held machine.
5. Thoroughly rinse surfaces with clean, clear water to remove loosened dirt and standing water. Change rinse water
frequently and repeat rinsing as required to completely remove water and dirt residue from surface.
6. Repeat process as to achieve the desired appearance.
ni
Dry surfaces with clean, dry cloths or dry mop floors after rinsing to prevent streaking.
-OR-
2. Follow procedures in Section C. below.
B. Cleaning Polished Marble:
1. Machine buff with a polishing agent (see Materials, Section 2.02 B. above):
a. Mix polishing agent with water to create a paste compound as recommended by manufacturer.
b. Apply paste mixture to surface and buff using a hand-held machine with a fiber brush buffing pad. Treat areas of
approximately 9 sq. ft. at a time, first running the pad horizontally and then vertically across surface.
c. Repeat process as necessary to achieve the desired appearance.
d. Final polish by first wetting with clean water followed by running a clean buffing pad across the surface until dry.
-OR-
GSA
Stripping Built-Up Floor Coatings From
Marble
Procedure code:
445519S
Source:
National Capitol Region Specifications
Division:
Masonry
Section:
Marble
Last Modified:
02/24/2012
PART 1---GENERAL
1.01 SUMMARY
A. This procedure includes guidance on stripping built-upcoatings from marble surfaces. These may include floor coatings
splashed onto adjacent marble surfaces.
В. See 01100-07-S for general project guidelines to be reviewed along with this procedure. These guidelines cover the
following sections:
1. Safety Precautions
2. Historic Structures Precautions
3. Submittals
4. Quality Assurance
5. Delivery, Storage and Handling
6. Project/Site Conditions
T. Sequencing and Scheduling
8. General Protection (Surface and Surrounding)
These guidelines should be reviewed prior to performing this procedure and should be followed, when applicable,along with
recommendations from the Regional Historic Preservation Officer (RHPO).
1.02 SYSTEM DESCRIPTION
A. Performance Requirements: The objectives for marble cleaning are to remove dirt, grime and coatings from the surfaces
without damaging the underlying material and to give all the marble a clean uniform appearance without blotches.
1.03 SUBMITTALS
a. Samples:
1. Sample panels for cleaning and patching shall be prepared for approval and shall establish a standard for all marble
work. The locations and types of control samples are to be indicated on a plan, with a photograph of each control
sample to be submitted to the Contracting Officer's representative. No work shall commence until written approval
for the control samples has been obtained from the Contracting Officer's representative.
2. The Contractor shall clean sample panels 2'-0" by 2'-0" in area, on each color and type of marble,for approval by the
Contracting Officer's representative. Locations of sample panels to be selected by the Contracting Officer's
representative.
1.04 QUALITY ASSURANCE
A, Regulatory Requirements:
1. Comply with municipal and Federal regulations governing all work included in this section and including, but not
limited to, cleaning, waste disposal and protection to adjacent properties.
2. Contractor: The work shall be performed by a firm possessing a minimum of five (5) years of specialized experience
in the restoration and clearing of historic architectural marble, similar to that which is required in this project. The
Contractor shall submit to the Contracting Officer's representative references of previous work, justifying the firm's
experience, The Contacting Officer's representative reserves the right to approve or disapprove the use of the
Contractor contingent upon their experience.
a. NOTE: The quality of the work is highly dependent on the competence of the Contractor because it is not
possible to anticipate every variation encountered in the surfaces, job conditions and methods used.
PART 2---PRODUCTS
2.01 MANUFACTURERS
A. ProSoCo, Inc.755 Minnesota AvenueP.O. Box 1578 Kansas City, KS 66117800/255-4255 or 913/281-2700
B. Eastern Marble Supply Company
2.02 MATERIALS
A. Water: Potable, non-staining and free of oils, acids,alkalis and organic matter.
B. Polishing Compound - An acid-free abrasive compound containing no caustic or harsh fillers or ingredients with natural
resins added, manufactured specifically for polishing interior marble surfaces, such as "RS2B" (Eastern Marble Supply
Company), or approved equal.
C. Cleaning Agents -(General Cleaning): A poultice incorporating surfactants and biodegradable detergents in dry form for the
removal of general staining.Commercially available. The poultice is mixed with water and an additive containing special
deter gents and wetting agents, such as "Sure Klean Marble Poultice", "Sure Klean Marble Poultice Additive" (ProSoCo, Inc.),
or approved equal.
D. Cleaning Agents -(Built-Up Coatings): a non-acidic gel-like application for removal of built-up stains using thixotropic alkali
materials with a pH value between 7 and 10, such as "Sure Klean Liquid Marble Cleaner", "Sure Klean T-942 Limestone
Cleaner" (ProSoCo Inc.), or approved equal.
2.03 EQUIPMENT
A. Stainless steel trowel
B. Wood scrapers
C. Stiff bristle brushes (non-ferrous bristle)
PART 3---EXECUTION
3.01 PREPARATION
A. Protection:
1. Take all necessary precautions and measures to protect all surrounding materials from damage that might be
incurred during the marble restoration work. Any damage caused by the Contractor to other materials is
unacceptable and shall be repaired or replaced by the Contractor to the satisfaction of the Contracting Officer's
representative, at not cost to the Government.
GSA
1. Apply a liquid marble cleaner to the surface (see Materials, Section 2.02 A. above):
1. Apply cleaner to honed or polished marble surface using a stiff bristle brush.
2. Allow cleaner to remain on surface for period recommended by chemical cleaner manufacturer taking care not to
allow cleaning material to dry.
3. Sponge rinse surface thoroughly using clean, clear water to completely remove dirt and cleaner residue. Change
rinse water frequently.
4. Repeat process as necessary to achieve the desired level of cleanliness.
5. Wipe the surface with a clean, dry cloth to prevent streaking.
-OR-
2. Apply a mild detergent solution to the surface (see Materials, Section 2.02 A. above):
1. Mix mild detergent with warm water to create cleaning solution -OR- mix 1 ounce soft soap, 1 quart warm distilled
water and 1 ounce household ammonia.
2. Thoroughly wet the honed or polished marble surface with hot water.
3. Apply cleaning solution with a cloth, sponge or soft-fibered brush. Wash in small overlapping areas.
4. Sponge rinse surface thoroughly using clean, clear water to completely remove dirt and cleaner residue. Change
rinse water frequently.
5. Wipe the surface dry with clean, soft cloths to prevent streaking.
3.02 ERECTION, INSTALLATION, APPLICATION
A. Cleaning Existing Built-Up Coating from Marble:
1. Strip built-up splashed floor coatings from the lower part of marble veneer walls by applying thixotropic alkali
materials to the stone ("Sure Klean Liquid Marble Clean er", and low pressure cold water rinsing (less than 100 psi).
Brush apply the materials undiluted and let dwell for 20 to 60 minutes depending on field test trials. Do not allow
cleaners to dry. The Contractor should clean one whole panel at a time, so as to maintain a uniform result on each
panel and prevent cleaning overlap.
2. Before rinsing, scrub for 5 to 10 minutes with bristle brushes to loosen tenacious coatings. Do not use metal brushes.
Repeat application for stubborn build up. Do not allow cleaners to come in contact with the adjacent materials.
B. General Cleaning of Marble: Remove soiling and stains from marble veneer using a poultice incorporating surfaces and
detergents.
1. Prepare the poultice by mixing the additive with the dry poultice (fuller's earth) to the consistency of thick cream
and apply a AC" thick layer to the pre-wet masonry using a stainless steel trowel or a non-ferrous implement.
2. Cover the poultice with a membrane and allow to dry for 8 to 24 hours depending on field test trials.
3. Scrape poultice from the masonry with a non-metallic implement and scrub with water and a fiber bristle brush.
4. Rinse with low pressure water to remove all traces of the poulticing materials. The removal of crusted splashed
coatings should precede general poultice cleaning in order to achieve a uniform result.
Dutchman Repair Of Marble
Procedure code:
4455225
Source:
National Capitol Region Specifications
Division:
Masonry
Section:
Marble
Last Modified:
02/24/2017
PART 1---GENERAL
1.01 SUMMARY
A. This procedure includes guidance on repairing severely cracked marble blocks using dutchman repair. This procedure is
also appropriate for large spills in marble.
B. For guidance on making other marble repairs, see 04455- 03-R, 04455-04-R, 04455-05-R, 04455-08-R, 04455-20-R and 04455-
21-R.
С. See 01100-07-S for general project guidelines to be reviewed along with this procedure. These guidelines cover the
following sections:
1. Safety Precautions
2. Historic Structures Precautions
3. Submittals
4. Quality Assurance
5. Delivery, Storage and Handling
6. Project/Site Conditions
7. Sequencing and Scheduling
8. General Protection (Surface and Surrounding)
These guidelines should be reviewed prior to performing this procedure and should be followed, when applicable, along with
recommendations from the Regional Historic Preservation Officer (RHPO).
1.02 REFERENCES
A. American Society for Testing and Materials (ASTM) www.astm.org
1.03 SUBMITTALS
A. Product Data: Submit manufacturer's product data for epoxy adhesives or resins, including mixing instructions and
precautionary handling instructions.
B. Samples: Submit samples of marble dutchman units. Include full range of colors and textures required to match existing
stone. Submit samples of stainless steel pins for patching.
1.04 QUALITY ASSURANCE
A. Qualifications:
1. Contractor performing the work shall have a minimum of 5 years experience in masonry restoration work of the type
described for this project.
2. If requested by the Owner, furnish a statement of the experience and qualifications of the firm and of the key
personnel who will work on this project. Include the names and addresses of successful projects completed, and for
each, the name and address of the owner and the architect.
1.05 DELIVERY, STORAGE AND HANDLING
A. Packing and Shipping: Deliver stone materials to the project site in undamaged condition.
B. Storeage and Protection:
1.Store and handle stone to prevent their deterioration or damage due to moisture, extreme temperature changes,
contaminants, breakage, chipping or other causes.
2. Do not use pinch or wrecking bars to move or place stone. Lift stone with wide belt slings where possible. Use wood
rollers to move stone laterally.
1.06 PROJECT/SITE CONDITIONS
A. Environmental Requirements: The work is to be executed only when the air and surface temperature is 40 F and rising, or
less than 90 F. No pointing or patching is to be executed when the temperature is 45 F and falling, or when freezing
temperatures are expected within 48 hours.
PART 2---PRODUCTS
2.01 MANUFACTURERS
A. Jahn Restoration Mortars www.cathedralstone.com
B. Sika Corporation usa.sika.com
2.02 MATERIALS
A. Marble for replacement marble pieces and dutchman repairs to match existing marble type, color and finish, complying
with ASTM C503. Size of replacements and dutchman pieces shall be as required by field conditions.
B. Reinforcement/Anchors: Stainless steel type 302/304 3/8" in diameter threaded rods, length as required.
C. Cementitious patching material such as "M70 Stone Restoration Mortar" (Jahn Restoration), or approved equal.
D. Epoxy grout: High-modulus, low viscosity, high strength epoxy grouting/sealing/binder adhesive such as "Sikadur 35, Hi-
Mod LV" (Sika Corporation), or approved equal.
E. Clean, soft cloths
F. Clean, potable water
2.03 EQUIPMENT
A. Stiff fiber bristle brushes
B. Stiff wire bristle brushes
C. Chisel
D. Hammer
E. Trowel
F. Spray bottle
G. Masonry drill
PART 3---EXECUTION
3.01 PREPARATION
GSA
Epoxy Patching Small Cracks and Holes in
Marble
Procedure code:
445503S
Source:
Tacoma Union Station Courthouse, Tacoma, WA, GSA/PBS
Division:
Masonry
Section:
Marble
Last Modified:
08/17/2016
PART 1---GENERAL
1.01 SUMMARY
A. This specification provides guidance on patching small cracks and holes in marble with a two-component epoxy resin.
B. This specification is appropriate for cracks smaller in width than 1/8" and for holes smaller in diameter than 2".
C. Small cracks and holes in marble or other stone may be caused by impact damage, natural flaws in the stone or work on the
stone. A common cause of holes and cracks is the attachment of fixtures and signage to walls. The later removal of such
attachments leaves unsightly anchor holes which should be plugged or patched.
D. Read "General Project Guidelines" along with this specification. These guidelines should be reviewed prior to performing
this procedure and should be followed, when applicable, along with recommendations from the Regional Historic
Preservation Officer (RHPO). The guidelines cover the following sections:
1. Safety Precautions
2. Historic Structures Precautions
3. Submittals
4. Quality Assurance
5. Delivery, Storage and Handling
6. Project/Site Conditions
T. Sequencing and Scheduling
8. General Protection (Surface and Surrounding)
PART 2---PRODUCTS
2.01 MATERIALS
A. Patching Resin:
1. Manufacturer's standard 2-component epoxy resin, designed specifically for patching or bonding of marble units.
2. Factors to consider when selecting an epoxy should include:
a. Permeability
b. Absorption
c. Thermal expansion coefficients
d. Ultraviolet lighting conditions
B. Aggregate for Epoxy: Ground marble dust to match color of existing marble
C. Clean, potable water
2.02 EQUIPMENT
A. Hacksaw Blade
B. Chisels
C. Hand-held Water Bottle
D. Steel Trowel
E. Caulking gun
F. Stiff bristle brushes (non-metallic)
G. Resurfacing Screens for Honed Finish: A fine grit screen manufactured specifically for restorative type cleaning and
resurfacing of honed marble surfaces.
H. Grinding Stones for Honed Finish: Fine grit emery stones manufactured specifically for restorative type grinding and
resurfacing of honed marble surfaces.
|. Soft, nylon bristle brushes
GSA
Last Reviewed: 2017-09-28
Ve EREGTIIVN, INSTAL КЫРАК ГЫЧ Arr CICA ГРЕЧ
A. Carefully remove loose stone fragments. Reuse all pieces of spalled stone which are in sound condition without serious
cracks or flaws.
B. Clean any exposed metal anchors of all corrosion by scraping and brushing with a stiff wire bristle brush. Replace any
unsound anchors as necessary with new stainless steel anchors of approximate size and shape to match existing. Bed new
anchors in epoxy grout.
C. For resecurring small fragments, see 04455-21-R for guidance.
D. For larger fragments, square off the portion of spalled stone for replacement with dutchman repair. Remove dust and debris
from cavity and fragments using a stiff fiber bristle brush.
. Fit the dutchman for size.
т гт
. For dutchman larger than 4" by 4" by 1", additional reinforcement may be required.
1. Drill holes (size determined by size of reinforcement selected) into both the sound stone and the dutchman.
2. Inject adhesive into the holes and set stainless steel pins into the holes.
G. Coat abutting surfaces of the stone with epoxy adhesive, and secure the stone dutchman in place until the adhesive is
cured.
H. Clean any residual adhesive from the edges using a clean soft cloth. Wet the stone with clean, potable water and fill any
chipped areas and edges with patching mortar. Avoid feather-edging. Tool surface level with surrounding stone. Keep
mortar damp (80%-90% RH) for 72 hours or until cured.
Last Reviewed: 2017-09-28
NOTE: THIS PROCEDURE IS APPROPRIATE FOR CRACKS SMALLER IN WIDTH THAN 1/8" AND FOR HOLES SMALLER IN DIAMETER
THAN 2", THE MAXIMUM SIZE OF THE REPAIR SHOULD BE ADJUSTED ACCORDING TO THE TYPE OF MARBLE AND THE PROPOSED
APPEARANCE.
A. Using a chisel or hacksaw blade, carefully remove unsound marble material and old patching material from cracks and
holes to expose sound marble material for contact with epoxy patch.
B. Brush, vacuum or flush cracks and holes to remove dirt and loose debris.
C. Mix 2-component epoxy resin with marble dust aggregate to create a paste with a consistency suitable for application
(based on RHPO approval). Use marble dust from stone pieces of the same type, color, etc.
D. Using a caulking gun or spatula, apply patching material in cracks and holes as recommended by manufacturer to conform
to adjacent marble surfaces.
E. Allow patching material to cure for period recommended by manufacturer.
F. Once patching material has hardened, grind and polish surface of patching material to match surface characteristics of
adjacent marble.
Last Reviewed: 2017-09-28
REVISIONS
DATE/DELTA REMARKS
<
2
Е
ш О
с“ LL
ur
«X
a 0
I y)
c Ш
Е
— Ш
О ©
nz
~ 4
tw
О
Ir
CA 92660
949.757.0511
F
949.757.0411
BICKEL GROUP INCORPORATED
3600 BIRCH STREET, SUITE 120
NEWPORT BEACH,
P
SHEET TITLE:
Standard
For
Rehabilitation
SUB DATE 06/07/2022
BID DATE
DATE: 05/23/2022
DRAWN BY: TA
JOB NO: 21051
CHECKED BY: EM
SHEET NUMBER:
A— O.2B
= An official website of the United States government
Repointing Marble
Procedure code:
445520S
Source:
National Capitol Region Specifications
Division:
Masonry
Section:
Marble
Last Modified:
03/03/2017
PART 1---GENERAL
1.01 SUMMARY
A. This procedure includes guidance on raking out and repointing the deteriorated or inappropriately repointed horizontal and
vertical jaints on exterior marble.
B. See 01100-07-S for general project guidelines to be reviewed along with this procedure. These guidelines cover the following
sections:
1. Safety Precautions
. Historic Structures Precautions
. Submittals
> WN
‚ Quality Assurance
5. Delivery, Storage and Handling
6. Project/Site Conditions
7. Sequencing and Scheduling
8. General Protection (Surface and Surrounding)
These guidelines should be reviewed prior to performing this procedure and should be followed, when applicable, along with
recommendations from the Regional Historic Preservation Officer (RHPO).
1.02 REFERENCES
A. American Society for Testing and Materials (ASTM) www.astm.org
1.03 QUALITY ASSURANCE
A. Regulatory Requirements: Marble Design Manual, ASTM C144-70, Aggregate for Masonry mortar; ASTM C150-74 Portland Cement;
manufacturer's printed recommendations for product use and installation.
B. Certifications: Prior to delivery, submit certificates attesting compliance with applicable specifications for grades, types, classes.
C. Field Samples: Prior to raking out all areas, cut back joints at location selected by the Contracting Officer using the methods
specified. Raking will continue at no additional cost to the Government, until an acceptable sample is achieved. This area will serve
as standard for joint raking for the entire job. It will be marked and left unpointed until all other pointing is completed. Point when
directed by the Contracting Officer.
1.04 PROJECT/SITE CONDITIONS
A. Existing Conditions: No stone work will be performed when the air temperature is 40 F and falling or when stone surface
temperature is 40 F or below.
PART 2---PRODUCTS
2.01 MATERIALS
A. Portland cement: Type |, ASTM C150, gray and/or white as necessary to match mortar color specified.
B. Hydrated masons lime: ASTM C207.
C. Aggregate: See ASTM C144 (ASTM 19972). Clean sharp sand free of loam, silt, soluble salts and organic matter. Sand color should
match stone color as closely as possible. Aggregate shall conform to the size gradations specified as a result of laboratory analysis
of an approved sample.
1. Choose the color of the aggregate so that the dry mortar color matches specified color.
D. Water: Clean and free of deleterious amounts of oils, acids, alkalis and organic matter.
2.03 EQUIPMENT
A. Chisels
B. Joint tools
C. Hawks
D. Stiff fiber bristle brushes
E. Trowels
F. Rubber mallet
2.04 MIXES
A. Proportions for Marble Pointing, or as determined by mortar analysis:
1. Portland cement: 1 part by volume
2. Lime: 2 parts by volume
3. Aggregate: 9 parts by volume
4. Water: To form a workable consistency
B Mixing Procedures:
1. Measure materials by volume or equivalent height.
2. Do not measure by shovel. Use known measure.
3. Mix ingredients in clean mechanical batch mixer for 3-5 minutes.
4. Let mortar sit for 20 minutes prior to use to allow for initial shrinkage. Use mortar within 1 hour of initial mixing.
PART 3---EXECUTION
3.01 ERECTION, INSTALLATION, APPLICATION
A. Rake out all stone joints in designated areas by hand using a chisel no more than width of the mortar joint. Clean all mortar from
surfaces within the joint or crack so that the new pointing mortar bonds to the building material, not old mortar. Do not chip or
spall edges of the marble. If work is found unacceptable, all raking will cease without additional cost to the Government until
deficiencies in tools, workers or methodologies have been corrected to the Contracting Officer's satisfaction.
B. Raked joint depth to be at least 3/4" but in all cases rake back to expose sound mortar. Raked joint depth should be 2 to 2 1/2
timesthe joint width.
C. Brush, vacuum or flush ioints to remove all dirt and loose debris.
GSA
ег ачи рапта TS GT ST TYW TRE TSS TTT a PDT UU STS TIS SSS SN GI TST PDT AX] RA VE Ga E |a Ply Sa SSS Sa S VEA STS ET TY y
after preceding layer has taken initial set.
F. Use clean tools and equipment free from hardened or partially set mortar.
G. Clean excess mortar from stone and joints, removing splashed mortar and droppings immediately.
H. Do not retemper or use mortar which has partially set, is caked or is lumpy.
|. Finish horizontal and vertical face joints. Do not allow mortar to extend over the surface of the stone.
J. Curing: Keep joints damp (90% RH) for at least 72 hours or until surface is cured. Protect joints from rapid drying due to wind (i.e.,
covering tarps, enclosure on scaffolding).
3.02 ADJUSTING/CLEANING
A. At the time of repairing, pointing and resetting the marble, immediately remove mortar, grout and adhesives from the face of the
masonry.
B. Use only tools and equipment which are clean and free of hardened or partially hardened material.
C. Clean marble only with fiber bristle brushes and water. Use no acids, detergents, or other cleaning agents.
Last Reviewed: 2017-09-28
== An official website of the United States government
Repairing Hairline Cracks And Small Gouges
In Marble
Procedure code:
445508S
Source:
National Capitol Region Specifications - State Department
Division:
Masonry
Section:
Marble
Last Modified:
02/28/2017
PART 1---GENERAL
1.01 SUMMARY
A. This procedure includes guidance on filling narrow cracks, holes and gouges in interior marble.
B. See 01100-07-S for general project guidelines to be reviewed along with this procedure. These guidelines cover the
following sections:
1. Safety Precautions
. Historic Structures Precautions
. Submittals
. Quality Assurance
2
3
4
5. Delivery, Storage and Handling
6. Project/Site Conditions
T. Sequencing and Scheduling
8
. General Protection (Surface and Surrounding)
These guidelines should be reviewed prior to performing this procedure and should be followed, when applicable, along with
recommendations from the Regional Historic Preservation Officer (RHPO).
PART 2---PRODUCTS
2.01 MANUFACTURERS
A. Akemi Plastics, Inc. www.akemina.com
B. Eastern Marble & Granite Supply Company www.easternmarble.com
2.02 MATERIALS
A. Polyester Filler: Knife Grade Polyester-Based Adhesive:
"Akemi Marmorkitt 1000 Platinum" (Akemi Plastic, Inc.,), or "Italian Craftsman Polyester Adhesive" (Eastern Marble &
Granite Supply Company), or approved equal.
NOTE: Selected filler should NOT contain materials that may absorb into the marble and cause staining. Test in an
inconspicuous area.
B. Polishing Compound: An acid-free abrasive compound containing no caustic or harsh fillers or ingredients with natural
resins added, manufactured specifically for polishing interior marble surfaces, such as R52B (Eastern Marble Supply
Company), or approved equal.
C. Water: Clean and free of amounts of oils, acids, alkalies, salts, organic materials, or other substances that may be
deleterious to mortar or any metal in the wall.
2.02 EQUIPMENT
A. Hacksaw Blade
B. Chisels
C. Hand-held Water Bottle
D. Caulking gun
F. Stiff bristle hrushes (non-metallic)
GSA
PART 3---EXECUTION
3.01 ERECTION, INSTALLATION, APPLICATION
A. Using a chisel or hacksaw blade, carefully remove unsound marble material and old patching material from cracks and
holes to expose sound marble material for contact with polyester resin patch.
B. Brush, vacuum or flush cracks and holes to remove dirt and loose debris.
C. Allow to dry thoroughly.
D. Using a caulking gun or spatula, fill narrow cracks, holes, and gouges with polyester filler, colored to match adjacent marble
and honed or polished to match marble finish. Tape around the work area to prevent staining of the marble during filling
operation. Surfaces shall be true and level. Remove tape residue with appropriate solvent to produce the specified finish.
E. Allow patching material to cure for period recommended by manufacturer.
F. Grind marble down until an even plane is achieved. Feather out to unaffected surface as required to avoid marble having
dished appearance. Use right angle water feed grinder with successively finer diamond disks (#60 to #3500) or silicon
carbide grinding stones (36 to 400 grit).
G. Polish to match existing sheet of marble. Use acid-free aluminum oxide polishing compound with felt pad.
CAUTION: USE NO POLISHING COMPOUNDS CONTAINING FLUORIC ACID AS IT WILL ETCH THE MARBLE SURFACE RESULTING IN A
DIMINUTION OF GLOSS.
ЕЕ An official website of the United States government
Repolishing Marble
Procedure code:
445502S
Source:
Outdoor Sculpture Manual - Center For Public Buildings
Division:
Masonry
Section:
Marble
Last Modified:
02/28/2017
THIS PROCEDURE APPLIES TO HIGHLY POLISHED STONE AND IS NOT SUITABLE FOR USE ON HONED MARBLE SURFACES.
PART 1---GENERAL
1.01 SUMMARY
A. This procedure includes guidance on repolishing marble using polishing powder and water.
B. Determine original finish of marble before proceeding with any repolishing procedure.
C. Repolishing reflective surfaces may be necessary after treatment if the surface gloss has been altered. This is especially true
ifthe surface has been etched.
D. Perform as needed to repolish specular stone surfaces, particularly following etching (See 04455-15-R "Removing Etch
Marks in Marble").
E. For general information on the characteristics, uses and problems associated with marble, see 04455-01-S.
PART 2---PRODUCTS
2.01 MANUFACTURERS
A. Eastern Marble & Granite Supply Company www.easternmarble.com
2.02 MATERIALS
A. Mineral water
B. Marble polishing powder: A finely ground buffing powder manufactured specifically for restorative type polishing of
polished marble surfaces, such as "#52-B Polishing Powder" (Eastern Marble) or approved equal. Polishing agents may also
be available at a hardware store or local stone dealer. Or a prepared commercial polishing liquid or cream such as "Italian
Craftsman" (Eastern Marble), or an approved equal.
C. Clean, lint-free cloths
2.03 EQUIPMENT
A. Buffing pads for Polished Finish: Fiber brush pads manufactured specifically for restorative type polishing of polished
marble surfaces
R.Hand-held huffing machine
GSA
3.01 ERECTION, INSTALLATION, APPLICATION
NOTE: Do a test of the proposed polishing treatment in an appropriate, not highly visible area, to determine appropriate approach
to repolishing the marble.
A. Wet the surface with mineral water.
B. Sprinkle the marble polishing powder over the surface.
C. Dampen cloths with mineral water (if they are to be used).
D. Rub the powder onto the stone with the damp cloths or by using a hand-held buffing machine in long, even strokes; keeping
clear of adjoining vertical surfaces.
NOTE: Apply polishing powder to marble surfaces to comply with manufacturer's recommendations for hand application
methods, unless otherwise indicated. Do not allow to remain on surface for periods longer than that indicated or
recommended by manufacturer.
m
. Buff until a uniform polish, consistent with the historic design intent, is achieved. For most historic floors, the original finish
is a honed (non-reflective) finish. Walls and vertical surface were often given a soft satin polish. Highly polished surfaces
became more popular after World War II.
F.. Wipe clean with a damp cloth.
-OR-
G. For prepared liquid or cream polishing agents, follow the manufacturer's recommended directions.
Last Reviewed: 2017-09-28
REVISIONS
DATE/DELTA REMARKS
417 SOUTH HILL STREET
LOS ANGELES, CALIFORNIA
2.
О
=
=
ш
LL] +.
X =
=
о 4
EM
ur
I
"IT
ч:
=O
ч
o
иш
СА 92660
949.757.0511
F
949.757.0411
BICKEL GROUP INCORPORATE
3600 BIRCH STREET, SUITE 120
www.bickelgrp.com
NEWPORT BEACH,
Р
SHEET TITLE:
Standard
For
Rehabilitation
SUB DATE 06/07/2022
BID DATE
DATE: 05/23/2022
DRAWN BY: TA
JOB NO: 21051
CHECKED BY: EM
SHEET NUMBER:
А—0.2С
ЕЕ дп official website of the United States government
Reinforcing Loose Terra Cotta Units And
Patches
Procedure code:
421403S
Source:
Us Custom House/Portland, Or - Gsa/Facilities Support Ctr
Division:
Masonry
Section:
Terra Cotta Unit Masonry
Last Modified:
08/15/2016
PREFACE: This procedure should be performed under the direction of an historical architect or engineer to determine the most
efficient and least destructive manner for executing the work. Approval from the regional historic preservation officer is required.
PART 1---GENERAL
1.01 SUMMARY
A. This procedure includes guidance on installing bent wire armatures or studs in terra cotta to additionally reinforce and
anchor existing patches that are more than 1/2" thick, or any patch which is approximately fist size.
В. This procedure requires substantial intervention and is only to be used to secure large patches to alreadydamaged terra
cotta surfaces. If not properly anchored, large patches are particularly vulnerable to failure and separation due to weight,
thermal expansion and bond failures.
C. See "General Project Guidelines" for general project guidelines to be reviewed along with this procedure. These guidelines
cover the following sections:
1. Safety Precautions
2. Historic Structures Precautions
3. Submittals
4. Quality Assurance
5. Delivery, Storage and Handling
6. Project/Site Conditions
T. Sequencing and Scheduling
8. General Protection (Surface and Surrounding)
These guidelines should be reviewed prior to performing this procedure and should be followed, when applicable,
along with recommendations from the Regional Historic Preservation Officer (RHPO).
PART 2---PRODUCTS
2.01 MANUFACTURERS
A. Sika Corporation
B. Abatron, Inc.
2.02 MATERIALS
A. Stainless steel or bronze wire armature, or threaded rods and bolts. Threaded rods shall be sized according to the need and
loading requirements. Consult with structural engineer and RHPO.
1. Wire shall be 12-gauge or heavier.
2. Stainless steel shall be AISI Type 316.
3. The use of a wire armature or threaded rods shall be determined by size, depth and thickness of patch being
stabilized. To be determined by structural engineer and RHPO.
B. Moisture insensitive, structural epoxy or polyester resin adhesive as recommended by adhesive manufacturer (Sika
Corporation, Abatron, Inc., or approved equal).
C. Acrylic-cement finish.
2.03 EQUIPMENT
A. Masonry drill with diamond tipped coring bits.
B. Electric drill with mixing paddle to pre-mix epoxy adhesive.
C. Clean pail in which to mix epoxy adhesive.
D. Pressure-injection equipment as may be required.
E. Mixing nozzle: As recommended by adhesive manufacturer, the resin components may be automatically mixed by a nozzle
that is secured to the component cartridges.
PART 3---EXECUTION
3.01 ERECTION, INSTALLATION, APPLICATION
A. Holes:
1. The drill holes should be sized according to the wire or rod used. Typically, the hole shall be no greater in diameter
than 1/8-inch or 1/4-inch (depending on the adhesive used) larger than the pin to be embedded, and ten to fifteen
bar diameters deep.
2. Drill shall be non-impact type rotary drill with a masonry bit.
3. Depth of hole shall be sufficient to reach sound backing material.
4. Space wire armature reinforcing at approximately 2-inches on center, arranged in a grid or mesh where applicable,
or as recommended by structural engineer.
5. Clean holes with high pressure air.
B. Protection: Protect surfaces around holes from contact with adhesives. Use petroleum jelly, modeling clay or polyethylene
sheets as required.
C. Installation:
1. Verify the rod length as appropriate for the depth.
2. If using automatic pressure-injection equipment, resin shall be automatically measured and mixed in the mixing
nozzle.
GSA
4. Pack or place the resin into holes.
5. Slowly insert the wire armature or threaded rod into the resin to the full depth of the hole. Countersink head of rods.
6. Do not disturb the anchor until the adhesive has cured. Follow manufacturers instructions.
T. No gaps shall be visible between the rod and the masonry.
D. Plug counter-sunk holes and build-out face of damaged patches as required flush with surrounding surfaces using patching
mortar as described in HBPP procedure "Patching Small Holes, Minor Chips and Spalls in Terra Cotta".
3.02 ADJUSTING/CLEANING
A. Immediately remove spills and excess adhesive with absorbent material and flush with water.
B. Uncured material can be removed with solvent as recommended by adhesive manufacturer.
C. Do not allow excess material to cure as cured adhesive can only be removed mechanically.
3.03 PROTECTION
A. Apply one coat colored masonry acrylic-cement finish to protect and repair damaged surface areas.
B. Apply this protective, coloring, coating to existing old patch areas where the color does not match the terra cotta.
Last Reviewed: 2017-09-28
ЕЕ An official website of the United States government
Repairing Spalled Terra Cotta
Procedure code:
421406S
Source:
National Capitol Region Specifications - Agriculture Bldg
Division:
Masonry
Section:
Terra Cotta Unit Masonry
Last Modified:
04/17/2017
PART 1---GENERAL
1.01 SUMMARY
A. This procedure includes guidance on repairing small spalls in terra cotta using a cementitious patching mortar. For
alternative guidance in repairing spalls in terra cotta using field-prepared mortar, see 04214-01-R.
B. See 01100-07-S for general project guidelines to be reviewed along with this procedure. These guidelines cover the
following sections:
1. Safety Precautions
2. Historic Structures Precautions
3. Submittals
4. Quality Assurance
5. Delivery, Storage and Handling
6. Project/Site Conditions
T. Sequencing and Scheduling
8. General Protection (Surface and Surrounding)
These guidelines should be reviewed prior to performing this procedure and should be followed, when applicable, along with
recommendations from the Regional Historic Preservation Officer (RHPO).
1.02 SUBMITTALS
A. Samples: Color-match patch samples fabricated on pieces of appropriate masonry from or on the building using the
specified repair mortar as required.
PART 2---PRODUCTS
2.01 MANUFACTURERS
A. Jahn Restoration Mortars www.jahnmortars.com
B. Edison Coatings, Inc. www.edisoncoatings.com
2.02 MATERIALS
A. Terra Cotta Patch Mix: "Jahn M100 Terra Cotta Repair Mortar" (Jahn Restoration Mortars, Cathedral Stone Products, Inc.),
"Custom System 45" (Edison Chemical Systems, Inc.), or approved equal. Prepare samples for approval. The RHPO will
select the color most closely matching the existing original terra cotta.
1. Mortar mix should be formulated to match color and texture of existing masonry.
2. Mortar mix should not contain any synthetic additives.
3. Mortar mix should be vapor permeable, frost and salt resistant, shrink resistant, and be physically compatible with
the substrate, including, but not limited to, porosity, tensile, and compressive *strength.
B. Water: Clean, free of oils, acids, alkalis and organic matter.
2.03 EQUIPMENT
A. Stiff, natural bristle brushes
B. Hammer
C. Chisel
D. Trowel
E. Putty knife
2.04 MIXES
A. For Jahn Restoration Mortar: Follow manufacturer's printed instructions.
B. For Custom System 45: Follow manufacturer's printed instructions.
PART 3---EXECUTION
3.01 PREPARATION
A. Protection:
1. Protect persons, motor vehicles, surrounding surfaces of building whose masonry surfaces are being restored,
building site, and surrounding buildings from injury resulting from masonry restoration work.
2. Erect temporary protection covers over pedestrian walkways and at points of entrance and exit for persons and
vehicles which must remain in operation during course of masonry restoration work.
3. Contractor shall test those areaway drains, window well drains, etc., which will be used to assure that drains are
functioning properly prior to performing masonry restoration operations in those areas. The Contractor shall report
immediately to the Construction Engineer the location of drains which are found to be stopped up or blocked.
4. Prevent grout or mortar used in repointing and repair work from staining face of surrounding masonry and other
surfaces. Remove immediately grout and mortar in contact with exposed masonry and other surfaces.
5. Protect sills, ledges, windows, and projections from repair material droppings.
3.02 ERECTION, INSTALLATION, APPLICATION
NOTE: See manufacturer's product specifications for additional requirements in making terra cotta patches.
A. Remove loose mortar and masonry at areas to be patched.
B. Cut back 1/2" to sound terra cotta with chisel and hammer. Score surface to receive patch with chisel to provide a
mechanical key with patching material.
C. Thoroughly clean all loose terra cotta particles, mortar and other dust and debris from surfaces to be repaired by air and
GSA
Contracting Officer's Representative to determine the correct degree of moistening.
E. Mix the cementitious patching material according to manufacturer's instructions.
1. The mixture should be compatible in texture and porosity to the adjacent terra cotta.
2. Patching mortar should be shapable without using molds and as it is being applied should hold its shape right away.
3. Do not mix more material than can be used within 30 minutes, or as recommended by manufacturer.
F. Apply mortar mix with a trowel. Apply patching mortar in layers no greater than 3”. If a second layer is required, allow the
mortar to cure before applying the second layer. If a cement skin forms, remove 1/16" of the surface using a metal straight
edge or scraper.
G. Build up layers so that patch is slightly higher than adjacent surfaces. Do not feather edges.
H. Allow to harden for length of time as recommended by manufacturer, then carefully cut back and tool to match adjacent
surfaces. Maintain mortar joints; do not install patch across joints.
|. Keep patches damp for 72 hours after installations.
3.03 ADJUSTING/CLEANING
A. After mortar has fully hardened, thoroughly clean exposed masonry surfaces of excess mortar and foreign matter using stiff
nylon or bristle brushes and clean water, spray applied at low pressure.
B. Use of metal scrapers or brushes will not be permitted.
C. Use of acid or alkali cleaning agents will not be permitted.
Last Reviewed: 2017-09-28
ЕЕ An official website of the United States government
Patching Small Holes, Minor Chips And
Spalls In Terra Cotta
Procedure code:
421401S
Source:
US Custom House/Portland, Or - Gsa/Facilities Support Ctr
Division:
Masonry
Section:
Terra Cotta Unit Masonry
Last Modified:
04/17/2017
PART 1---GENERAL
1.01 SUMMARY
A. This procedure includes guidance on patching small holes (no greater than fist size), minor chips and spalls in terra cotta
with mortar to match existing units.
B. Make patch repairs only where the area and depth of damage is large enough to make a patch which is at least 1/2-inch
thick; otherwise make surface finish repairs to protect from more weather damage and to maintain a uniform color and
appearance. For guidance on patching masonry cracks, see 04200-03-R; for guidance on reinforcing existing patches, see
04214-03-R.
C. See 01100-07-S for general project guidelines to be reviewed along with this procedure. These guidelines cover the
following sections:
1.Safety Precautions
2. Historic Structures Precautions
3. Submittals
4. Quality Assurance
5. Delivery, Storage and Handling
6. Project/Site Conditions
7. Sequencing and Scheduling
8. General Protection (Surface and Surrounding)
These guidelines should be reviewed prior to performing this procedure and should be followed, when applicable, along with
recommendations from the Regional Historic Preservation Officer (RHPO).
1.02 REFERENCES
A. American Society for Testing and Materials (ASTM) www.astm.org
1.03 SUBMITTALS
A. Patching Mortar Sample: Cured and dried sample of mortar proposed for use in masonry patching; provide with mix design
and complete list of all materials and proportions with details on how mix proportions will be followed in the field; a sample
area on the building may be used for this test.
1.04 PROJECT/SITE CONDITIONS
A. Environmental Requirements: When outside air temperature is below 5 degrees C (40 degrees F), maintain mortar
temperature between 20 degrees C (70 degrees F) and 50 degrees C (120 degrees F) by heating water and/or aggregates.
PART 2---PRODUCTS
2.01 MANUFACTURERS
A. Thoro Consumer Products (BASF Construction Chemicals) www.thoroproducts.com
2.02 MATERIALS
A. Setting and Patching Mortar Materials: Mortar should meet standard compressive strength and permeability requirements
for terra cotta. General ASTM Designation C 270-88a.
1. Portland Cement: ASTM Designation C150-89, Type | or II. Natural light gray or buff color.
2. Hydrated Lime: ASTM Designation C207-79, Type S or equivalent lime putty.
3. Masons Sand: The sand used is the primary giver of the cured mortar color. Match samples provided by RHPO from
original mortar materials.
4. Mineral Colorants: Only as necessary and approved to match terra cotta matrix or surface color.
5. Other admixtures: No accelerators (Calcium Chloride) or additives may be used unless approved by the RHPO.
B. Patching Accessories:
1. Bonding Agents: "ThoroBond" (Thoro Consumer Products), or approved equal.
2. Glaze Replacement Coating for Terra Cotta: Portland cement base, polymer modified, water vapor permeable,
masonry coating; Thoroseal (Thoro Consumer Products) or approved equal.
a. Color to be selected by RHPO to match existing terra cotta finish after curing.
3. Microcrystalline wax
4. Water-tolerant paint
C. Clean, potable water
2.03 EQUIPMENT
A. Masonry drill
В. Hacksaw blade
C. Chisels
D. Wooden mallet
E. Glass cutter
Е. Wire brushes
G, Hand-held water bottle
H. Steel trowel
PART 3---EXECUTION
3.01 EXAMINATION
A. When inspecting for external damage, look for:
1. Missing units
2. Deteriorated or missing mortar
3. Large cracks running through multiple units
4. Material failures such as spalls, and parallel crazing
5. Presence or absence of water-shedding devices like flashing, gutters and downspouts
6. Bulges in the terra cotta, particularly at floor levels and at piers
7. Rust stains from failing anchors
8. Efflorescence from excessive moisture in the wall
B. When inspecting for internal damage:
1. Strike the surface of a unit with a wooden mallet.
2. Undamaged units give off a clear ringing sound, while broken units and those with internal damage give off a flat
thud.
3. Consistent tonal quality among similar pieces is the key to locating damaged units.
3.02 PREPARATION
A. Surface Preparation:
1. Clean broken, spalled, and cracked terra cotta units by scraping, chipping, and wire brushing the damaged area to
expose sound, clean, terra cotta surface.
2. Wash the cleaned surface with clean, clear water or blow compressed air to remove dusts.
3. Tool work areas to be patched to roughen for promoting bonding to patch material.
4, Undercut edges of area to be patched (roughly 30 degrees).
3.03 ERECTION, INSTALLATION, APPLICATION
A. Using a glass cutter, cut a line through the fireskin or glaze around the damaged area at right angles to the edges of the
block.
B. Using a masonry drill and a hacksaw blade, remove all damaged material.
C. Undercut at least 2 of the edges to provide a good key for the repair.
D. Mix patching mortar to a stiff consistency, to be workable, but not to run, sag, or be friable.
1. Consistently and accurately measure materials for each batch according to approved samples.
2. Mix for at least five minutes in a mechanical batch mixer or mortar box.
3. Mix trowel workable consistency for unit masonry setting and resetting.
4. Mix firm dry consistency for repointing.
5. Discard mortar not used within two hours after mixing; do not retemper at mixer.
E. Hand-spray the surface with water before placing the mortar.
GSA
1. Place patching mortar in maximum of 3/8-inch thick lifts, allowing an initial set, before proceeding with additional
lifts, successively, until the whole patch is filled. Hand-spray the mortar with water before each application.
2. Slightly over-fill the patch to allow for shrinkage and finishing.
NOTE: Depth of lifts should be adjusted to type of mortar in order to allow for adequate curing.
H. Finish and dress patch surface to match adjacent surfaces, and begin curing.
ЕЕ An official website of the United States government
Replacing Damaged Terra Cotta Units
Procedure code:
421404S
Source:
Developed For HSPG (NPS - Southeast Regional Office)
Division:
Masonry
Section:
Terra Cotta Unit Masonry
Last Modified:
08/15/2016
PREFACE: This procedure should be performed under the direction of an historical architect or engineer to determine the most
efficient and least destructive manner for executing the work. Approval from the regional historic preservation officer is required.
PART 1---GENERAL
1.01 SUMMARY
A. This procedure includes guidance on removing and replacing severely damaged ceramic veneer, both adhesion type and
anchor type. Sculptural elements are not covered in this procedure.
B. See "General Project Guidelines" for general project guidelines to be reviewed along with this procedure. These guidelines
cover the following sections:
1. Safety Precautions
2. Historic Structures Precautions
3. Submittals
4. Quality Assurance
5. Delivery, Storage and Handling
6. Project/Site Conditions
T. Sequencing and Scheduling
8. General Protection (Surface and Surrounding)
These guidelines should be reviewed prior to performing this procedure and should be followed, when applicable,
along with recommendations from the Regional Historic Preservation Officer (RHPO)
1.02 REFERENCES
A. American Society for Testing and Materials (ASTM),
1.03 SUBMITTALS
A. Shop Drawings:
1. The historical architect shall furnish all drawings, details and other information, including structural drawings,
necessary for the manufacture of replacement material.
2. Shop drawings showing details of construction and jointing of replacement material shall be submitted by the
manufacturer to the contractor for approval by the RHPO before any of the material is processed. Drawings shall
show sections, dimensions, and the connection with other work. (If anchored, the typical and special anchors,
grooves, etc., shall be shown.)
3. The manufacturer shall complete setting drawings, numbered and marked to correspond with numbers and other
marks on the replacement pieces. These drawings shall also show all other necessary data to properly and efficiently
set the material, including dimensions and sizes of joints, anchors, hangers, expansion and control or pressure-
relieving joints, etc., which shall be furnished by others.
PART 2---PRODUCTS
2.01 MANUFACTURERS
A. Boston Valley Terra Cotta
B. Gladding, McBean & Co.
C. Ludowici Celadon
D. The Sherwin Williams Co.
E. Studio S Pottery
F. Superior Clay Corp.
2.02 MATERIALS
A. Terra Cotta Replacement Units (ceramic veneer)
NOTE: ALL REPLACEMENT UNITS SHALL MATCH ORIGINAL IN SIZE APPEARANCE, COLOR AND FINISH.
1. General:
a. All materials shall be in accordance with the architect's drawings and details.
b. All pieces shall be of even thicknessthroughout, and shall be true and even on each face.
c. Each piece shall be thoroughly burned and free of cracks, air bubbles and other defects.
d. All edges and details shall be crisp and sharp.
2. Adhesion Type Ceramic Veneer: Approximately 1" thick, with ribs, grooves or dovetails on back. Individual units shall
not have a surface area greater than 720 square feet.
3. Anchored Type Ceramic Veneer: Machine or hand made, with a wall thickness of approximately 1-5/8" with dovetail
ribs projecting on the back. Handmade units shall have profiles as detailed by the architect.
B. Anchoring system pieces as required - either stainlesssteel, AISI (American Iron and Steel Institute) Type 316, polyester resin,
or as recommended by the ceramic veneer manufacturer.
C. Paint:
1. "Zinc Chromate Primer" (Sherwin Williams), or approved equal.
2. Top coat(s): Number and type of paint as recommended by manufacturer of primer. Paint shall be water tolerable
and made by the same Manufacturer should be same as the primer.
D. Setting Mortar:
1. 1 cu. ft. Portland Cement, ASTM C 150-67, Type | or Type II
2.1/2 cu. ft. approved high calcium slaked lime putty, screened and aged at least 20 days, containing no more than 496
magnesium oxide-OR- ,
3. 1/2 cu. ft. hydrated lime, ASTM C 206 or C 207, Type S
4.4 cu. ft. clean, sharp siliceous sand graded from fine to very fine, ASTM C 144
5. 1 qt. "Hydratite Liquid" or approved equal
E. Pointing Mortar:
1.1vol. portland cement as above.
2. 1/4 vol. aged high calcium lime putty as above, or
3. 1/4 vol. hydrated lime as above.
4.3 vols. very fine sand as above.
5. Gauge above with mix of one volume "Konset" thoroughly mixed in six volumes water, or of "Anti-Hydro"or
"Suconem Red Label" or "Tricosal" or approved equal used according to manufacturer's directions.
F. Grout Mix #1: For all vertical voids back of anchor-type ceramic veneer and handmade ceramic veneer shall be wet and
sloppy composed of the following:
1. 1vol. portland cement as above.
2.3 vols. clean sharp sand as above.
3.2 vols. top gravel, well graded from fine to coarse.
G. Grout Mix #2: For all handmade ceramic veneer sills, copings, balusters, and rails, cornices, etc., shall be lean and composed
of the following:
1, 1 vol. portland cement as above.
2.4 vols. clean sharp sand as above.
3. 3 vols. top gravel, well graded from fine to coarse.
H. Clean, clear potable water
2.02 EQUIPMENT
A. Paint brushes
B. Hawks and trowels as required
C. Hose and spray nozzle
D. Grouting equipment
PART 3---ЕХЕСОТІОМ
3.01 PREPARATION
A. Surface Preparation:
1. Soak replacement pieces in a vat or box of clean water for one hour or more just prior to installation. The pieces
should be noticeably damp at the time of setting. Drain pieces sufficiently to eliminate surface water.
2. At the beginning of setting each day, soak all walls to be faced with clean water. Apply water with a hose and spray
nozzle. Soak again with water not more than one hour before setting of replacement pieces.
3.02 ERECTION/INSTALLATION/APPLICATION
A. Removing Damaged Terra Cotta Units:
1. Remove mortar from around damaged units by hand being careful not to chip the edges of adjacent sound units.
Insert wedges as required as mortar removal progresses to hold damaged units in place until they can be removed.
2. Carefully remove damaged units and all loose grout in cavity behind unit.
B. Installing Anchored Type Ceramic Veneer:
1. Preparing the anchoring system:
a. Inspect the anchors and reinforcing armature thoroughly for any sign of corrosion.
b. Remove any rust from anchors which can be reused. Coat with one coat of a rust inhibiting primer and top
coat(s) of water tolerant paint as recommended by the primer manufacturer.
c. Install new anchors as required and as recommended by the ceramic veneer manufacturer.
2. Setting anchors and grooves:
a. The general contractor shall be guided by the drawings for the placing of all loop-dowel anchors or other
anchors, and the provision for the 1" x 6" horizontal grooves in the concrete to permit the proper anchoring
and grouting of the ceramic veneer.
b. Grooves shall be 12" on vertical centers in all spandrels and 30" elsewhere.
c. Alternate detail: 1/4" x 6" grooves approximately 12" on vertical centers accomplished by the use of alternate
surfaced and unsurfaced form lumber.
d. The loop-dowel anchors, or approved equal anchors, shall be installed in vertical alignment on about 12"
centers; and shall be spaced on equal horizontal centers of approximately 12" but not greater than 18", and
so located, where practical, that a vertical line of loop-dowel anchors will be directly in back of each vertical
joint of ceramic veneer. Keep loop-dowel anchors out of 1" x 6" horizontal grooves.
e. Dimension from face of masonry or concrete wall to face of anchored veneer shall be a nominal 4".
3. Installing pencil rods:
a. Install 1/4" pencil rods vertically through loops of loop-dowel anchors.
b. Install approximately 1" away from the face of the wall.
с. Above openings, the lower end of the pencil rods should have 4" or more bent at right angles over ceramic
veneer soffits, and should lie loosely thereon.
4. Installing loose anchors:
a. All loose anchors shall be located in bed joints and/or interior webs on 12" to 18" horizontal centers.
b. One end of each anchor shall be securely hooked around a pencil rod, dowel rod, or structural steel member
and the other end securely hooked into the ceramic veneer.
C. Loose anchors shall hook around 1/4" dowel pins in joints of soffit pieces. These anchors shall pass through
loops and hook around loop-dowel anchors.
5. Special loop-dowel anchors:
1. In deep ceramic veneer anchored soffits the special loop-dowel anchors shall extend vertically down to
within 1" of the ceramic veneer soffit, and shall be threaded horizontally with 1/4 pencil rods.
2. The long dowel end of the special loop-dowel anchor shall have 2" or more bent at right angles and lay flat
against the top of the ceramic veneer soffit.
3. The loop ends of the special loop-dowel anchors shall extend down vertically at least 5" from the concrete
soffit.
4. Special loop-dowel anchors are to be of the same material as the loop-dowel anchors.
5. Dimension from face of concrete soffit to face of anchored veneer shall be a nominal 8".
6. Grouting:
a. All anchored ceramic veneer shall be set in a full bed of mortar and all voids back of the ceramic veneer shall
be filled solid with grout as specified under Grout Mix #1, and shall be well rodded to eliminate all air
pockets.
b. Where possible to do so, grout should be poured to a height of 6" only behind each continuous course of
anchored ceramic veneer and the grout allowed to set sufficiently to "freeze" the piece in place before
pouring the balance. Grout shall have sufficient plasticity to fill the joints from the rear.
c. All copings and cornices of handmade ceramic veneer shall have filler pieces (grout plugs) at joints.
d. Before being set in place, all handmade ceramic veneer copings, etc., shall be turned bottom side up and
filled solid with a lean wet grout as specified under Grout Mix #2, andshall later be set in place on the wall
and anchored in vertical joints as indicated on setting drawing.
e. Vertical joints shall be grouted solid through openings at joints, provided in ceramic veneer before grout
plugs are placed.
f. This pre-grouting procedure is also to be used in grilles, etc., as directed and whererequired to solidly fill all
voids.
C. Installing Adhesion Type Ceramic Veneer:
1. Setting:
a. Just prior to application of mortar coats, a limited area of the wall and the entire back of the piece of soaked
ceramic veneer about to be set shall be given a brush coat of neat portland cement and water.
b. Immediately thereafter spread on-half of th mortar coat on a limited area of the wall and the other half over
the back of the piece of ceramic veneer.
1. The mortar troweled on the back of the piece of ceramic veneer shall be screeded to a uniform
thickness as measured from the face of the ceramic veneer.
2. The other half of the mortar bed applied to the wall surface shall be screeded to a true and plumb
level.
3. The total thickness of the mortar coat shall average 3/4", but sufficient mortar shall be used to create
a slight excess which will be forced out at the joints at the edge of the piece when it is tapped into
place.
c. When the piece is set against the wall it shall be driven home by repeated tapping with a rubber mallet to
GSA
f. Any piece of ceramic veneer tipped away from the wall for readjustment or improperly set for any reason
shall immediately be removed, cleaned of all mortar, including the wall surface, and reset in accordance with
the above procedure.
2. Soffits: Each piece of ceramic veneer, in addition to the usual centers and wooden wedges, shall be supported by
suitable bent vertical wooden shores exerting a constant upward pressure until the mortar coat is set for several
days.
D. Tooling and pointing:
1. If pointing is not specified, all mortar joints shall be tooled as the setting progresses to form a concave joint.
2. When pointing is specified, all mortar joints shall be raked to a depth of 1/2".
3. Before pointing, joints shall be saturated with clean water, after which they shall be filled solidly with pointing
mortar and tooled.
4. All surplus mortar and stains shall be removed as the setting progresses and the surface shall be left clean.
3.03 ADJUSTING/CLEANING
A. Wipe all excess mortar as the work progresses. Dry brush at the end of each day's work.
B. After mortar is thoroughly set and cured, wash new masonry surfaces, walls, sills, overhangs, etc., of all loose mortar, and
dirt with soap or washing powder detergent and rinse thoroughly with clean water. Abrasives or metal tools shall not be
used.
Last Reviewed: 2017-09-28
REVISIONS
DATE/DELTA REMARKS
H.
Ш
Ш
aa
H
o
-
—
Г
T
H
нр
О
o
~N
m
Jt
LOS ANGELES, CALIFORNIA
CA 92660
949.757.0511
F
www.bickelgrp.com
949.757.0411
BICKEL GROUP INCORPORATED
3600 BIRCH STREET, SUITE 120
NEWPORT BEACH,
P
A
SHEET TITLE:
Standard
For
Rehabilitation
SUB DATE 06/07/2022
| ворак 00000000000 DATE
DATE: 05/23/2022
DRAWN BY: TA
JOB NO: 21051
CHECKED BY: EM
SHEET NUMBER:
A— O.2D
Patching Hairline Cracks In Plaster
Procedure code:
921002S
Source:
Hspg Prepared For Nps - Sero
Division:
Finishes
Section:
Gypsum Plaster
Last Modified:
04/20/2015
PART 1---GENERAL
1.01 SUMMARY
A. This procedure includes guidance on patching hairline cracks in plaster with reinforcing tape and joint compound.
B. Cracks may be cyclical, opening and closing with seasonal variation in humidity which causes the lath to swell and shrink.
С. See 01100-07-S for general project guidelines to be reviewed along with this procedure. These guidelines cover the
following sections:
1. Safety Precautions
2. Historic Structures Precautions
3. Submittals
4. Quality Assurance
5. Delivery, Storage and Handling
6. Project/Site Conditions
7. Sequencing and Scheduling
8. General Protection (Surface and Surrounding)
These guidelines should be reviewed prior to performing this procedure and should be followed, when applicable, along with
recommendations from the Regional Historic Preservation Officer (RHPO).
1.02 PROJECT/SITE CONDITIONS
A. Environmental Requirements:
1. Keep the room temperature above 55 degrees F until the plaster/joint compound has set.
2. Provide plenty of ventilation as the plaster dries.
PART 2---PRODUCTS
2.01 MANUFACTURERS
A. USG Corporation www.usg.com
B. TKO Waterproof Coatings, LLP www.tkocoatings.com
2.02 MATERIALS
A, Joint compound such as "Sheetrock Setting-Type Joint Compound" (USG Corp.), "Krack-kote" (TKO Waterproof), or
approved equal.
1. "Krack-kote": Good for problem cracks that may break through the Sheetrock tape and compound.
a. It uses a pliable adhesive and a glass fiber reinforcing tape; it has more flexibility and strength than ordinary
joint compound.
b. Available from large paint supply stores.
с. Itis more expensive and more timely to apply than ordinary joint compounds.
B. Reinforcing tape (cloth or paper): Cloth is better for flat surfaces because of its open-weave, but it is difficult to find in the
U.S.
C. Acrylic latex caulk
2.03 EQUIPMENT
A. Wide joint knife (approximately 5-6 inches wide)
B. Sponge or heavy-nap cloth
C. Caulking gun
D. Crack widener or triangular can opener
E. Stiff bristle brushes or vacuum
PART 3---EXECUTION
3.01 EXAMINATION
GSA
Patching Small Chips And Cracks In Plaster
Procedure code:
921005S
Source:
Tacoma Union Station Courthouse/Tacoma, Wa - Gsa/Pbs
Division:
Finishes
Section:
Gypsum Plaster
Last Modified:
02/24/2017
PART 1---GENERAL
1.01 SUMMARY
A. This procedure includes guidance on patching small chips, cracks or depressions in plaster surfaces.
B. See 01100-07-S for general project guidelines to be reviewed along with this procedure.
These guidelines cover the following sections:
1. Safety Precautions
2. Historic Structures Precautions
3. Submittals
4. Quality Assurance
5. Delivery, Storage and Handling
6. Project/Site Conditions
T. Sequencing and Scheduling
8. General Protection (Surface and Surrounding)
These guidelines should be reviewed prior to performing this procedure and should be followed, when applicable,
along with recommendations fram the Regional Historic Preservation Officer (RHPO).
C. For guidance on repairing hairline cracks, see 09210-02- R; for guidance on repairing large holes, see 09200-12-R and 09210-
03-R.
1.02 REFERENCES
A. American National Standards Institute (ANSI) www.ansi.org
B. American Society for Testing and Materials (ASTM) www.astm.org
PART 2---PRODUCTS
2.01 MANUFACTURERS
A. USG Corporation www.usg.com
2.02 MATERIALS
А. Gypsum Plaster Materials:
1. General: gypsum plastering materials shall conform to ANSI A42.1. Provide neat or ready-mixed materials at
installer's option unless indicated otherwise.
2. Base coat plaster: Perlite gypsum plaster such as "Structo-Lite" (USG Corp.), or approved equal.
3. Base coat aggregate: Sand.
4. Finish coat plaster: Keene's cement.
5. Finishing lime: Type is installer's option.
B. Bonding Materials: Bonding agent shall conform to ASTM C631.
2.03 EQUIPMENT
1. Joint knife
2. Sponge or heavy-nap cloth
3. Crack widener or triangular can opener
4. Stiff bristle brushes
5. Hawk
6. Slicker (flexible straight-edge)
T. Plasterer's trowel
GSA
3.02 ERECTION, INSTALLATION, APPLICATION
A. Slightly widen the crack with a sharp, pointed tool like a crack widener or a triangular can opener.
B. Brush or vacuum surface to remove dust and debris.
C. Apply joint compound with a wide joint knife; Butter the compound into the crack, spreading it about 3 inches on either
side of the crack.
D. Center mesh reinforcing tape over the crack, and force the tape down into the bed of the joint compound with the knife;
Remove any excess compound by wiping with the joint knife.
E. When the tape is bedded, cover surface with a thin layer of compound and smooth as much as possible by working with the
joint knife.
F. When the first coat has dried (at least 24 hours), smooth out any ridges by "wet sanding" with a damp sponge or a heavy-
nap cloth folded flat or wrapped around a suitable block.
G. Apply a second thin coat of joint compound and feather the edge at least 1 inch beyond the first coat.
H. After the second coat has dried, wet-sand lightly and apply a thin finishing coat.
|, Lightly sand the surface again, and clean off the area with damp sponge.
J. After the surface has dried, brush off any plaster residue or dust.
NOTE: For gaps between plaster surfaces and surrounding woodwork, apply acrylic latex caulk using a caulking gun.
Last Reviewed: 2017-09-28
PART 3---EXECUTION
3.01 ERECTION, INSTALLATION, APPLICATION
A. Scrape loose or damaged finish plaster and peeling paint from surface with chisel or joint knife. Remove material where
required to enlarge cracks, chips, holes, etc. to at least 1/2 inch across and undercut to improve bonding of new material.
B. Brush or vacuum surface to remove dust and debris.
C. Moisten the surface by lightly spraying a fine mist of clean water from a spray bottle.
D. Apply skim finish coat over low areas to bring entire« finished surface out flush with the projecting firm and sound layers of
adjacent plaster or paint. Form plaster as required to match original configuration and design or ornamental plaster.
E. Once dry, sand by hand to produce a surface without bumps, cracks or depressions, ready to receive finish treatment.
3.02 ADJUSTING/CLEANING
A. Upon completion of this work, all floors, walls and other adjacent surfaces that are stained, marred, or otherwise damaged
by work in this procedure shall be cleaned and repaired and all work and the adjacent areas shall be left in a clean and
perfect condition.
B. All completed work shall be adequately protected from damage by subsequent building operations and effects of weather.
Protection shall be by methods recommended by the manufacturer of installed materials and as approved by the RHPO.
Replicating Ornamental Plaster Trim
Procedure code:
920005S
Source:
The Old Custom House/Ny, Ny - Gsa/Pbs, 2-27-91
Division:
Finishes
Section:
Lath & Plaster
Last Modified:
03/13/2017
ORNAMENTAL PLASTER WORK IS A SKILLED CRAFT REQUIRING THE WORK OF A QUALIFIED AND EXPERIENCED CRAFTSMAN.
PART 1---GENERAL
1.01 SUMMARY
A. This procedure includes guidance on replicating ornamental plaster trimwork to replace that which is deteriorated or missing.
B. See 01100-07-S for general project guidelines to be used along with this procedure. These guidelines cover the following
sections:
1. Historic Structures Precautions
2. Submittals
3. Quality Assurance
4. Delivery, Storage and Handling
5. Project/Site Conditions
6. Sequencing and Scheduling
7. General Protection (Surface and Surrounding)
These guidelines should be reviewed prior to performing this procedure and should be followed along with recommendations from
the Regional Historic Preservation Officer (RHPO).
1.02 REFERENCES
A. American Society for Testing and Materials (ASTM) www.astm.org
1.03 SUBMITTALS
A. Product Data: Submit manufacturer's product data for plaster materials, lath and accessories.
B. Design Data/Test Reports/Certificates:
1. Material Certificates: Submit producer's certificates for plaster aggregates to show that materials comply with requirements.
2. Schedule of Work: Submit a schedule of spaces that require ornamental plaster, and a list of ornamental plaster items or
areas that require repair or replacement in each of the affected spaces. Indicate procedures to be used, and time
requirements.
1.04 QUALITY ASSURANCE
A. Regulatory Requirements: Reference Standards: Comply with applicable requirements of Chapter 9 - Ornamental Plaster, in
"Plastering Skills", published by American Technical Publishers, Inc. Comply with other specified standards.
1.05 PROJECT/SITE CONDITIONS
A. Environmental Requirements:
1. General: Comply with requirements of referenced plaster application standards and recommendations of plaster
manufacturer for environmental conditions before, during and after application of plaster.
2. Cold Weather Protection: When outdoor temperature is below 55 degrees F., maintain continuous uniform temperature of
not less than 55 degrees F., nor more than 70 degrees F., for not less than 1 week prior to plaster application, during its
application, and until plaster is dry but for not less than one week after application is complete. Distribute heat evenly;
prevent concentrated or uneven heat from contacting plaster near heat source.
3. Ventilation: Ventilate building spaces as required to remove water in excess of that required for hydration of plaster. Begin
ventilation immediately after plaster is applied and continue until it sets.
4. Protection: Protect adjacent work from soiling, splattering, moisture and other harmful effects which might result from
plastering. Obtain approval of the protection from the contracting officer.
PART 2---PRODUCTS
2.01 MANUFACTURERS
A. National Gypsum Co.
Gold Bond Building Products Division
www.nationalgypsum.com
B. USG Corporation
www.usg.com
C. Perma-Flex Mold Company
www.perma-flex.com
D. Charles Street Supply Co.
www.charlesstsupply.com
2.02 MATERIALS
A. Gypsum Plaster Materials:
1. Base coat plasters: ASTM C28, types as indicated below.
a. Gypsum neat plaster such as "Red Top Gypsum Plaster" (USG.com), "Two-Way Hardwall Gypsum Plaster" (National
Gypsum Co.), or approved equal
b. High strength gypsum neat plaster with a minimum average dry compressive strength of 2,800 psi per ASTM C472 for
a mix of 100 165. plaster and 2 cu. ft. of sand such as "Structo-Base" (USG), or approved equal.
2. Finish coat plasters: Types as indicated below:
a. Gypsum gauging plaster, ASTM C28; for flatwork such as, "Red Top Gauging Plaster" (USG), "Gold Bond Gauging
Plaster" (National Gypsum Co.), or approved equal.
b. Gypsum molding plaster, ASTM C59; for crown moldings such as "USG No. 1 Moulding Plaster" (USG) "Gold
BondMoulding Plaster" (National Gypsum Co.), or approved equal.
c. Gypsum casting plaster, ASTM C59; for ornamental plaster such as "USG No. 1 Casting Plaster" (USG), or approved
equal.
3. Finishing Hydrated Limes: ASTM C206; Type S, or approved equal.
4. Aggregates for Base Coat Plasters: ASTM C35, sand.
B. Clean, potable water
C. Bonding Compound for Gypsum Plaster: ASTM C631.
D. Plaster Molds: Urethane rubber liquid mold material that can produce detailed impressions (Perma Flex Mold Co.), or approved
equal.
E. Reinforcing Fibers: Sisal hemp fibers, or polypropylene fibers, not more than 2" long (Plastic Tooling Co.), or approved equal.
F. Anchors for Reattachment of Existing Plaster: Zinc plated washers with appropriate mechanical fasteners for existing substrates,
(Charles Street Supply Co.), or approved equal.
2.03 MIXES
A. Plaster Base Coat Compositions: Comply with ASTM C842 and manufacturer's directions for gypsum plaster base coat
proportions for three-coat work:
1. Scratch Coat: High strength gypsum gauging plaster with job-mixed sand.
2. Brown Coat: High strength gypsum gauging plaster with job-mixed sand.
B. For Finish Coat: Proportion casting plaster and molding plaster to comply with the manufacturer's instructions. Proportion
gypsum gauging plaster to comply with ASTM C842; 1 part plaster and 2 parts lime.
PART 3---EXECUTION
3.01 EXAMINATION
A. Examine surfaces to receive ornamental plaster and conditions under which the ornamental plaster will be installed. Proceed
with the ornamental plaster work only when substrate surfaces and conditions comply with referenced standards, to ensure
satisfactory installations.
1. Promptly notify the contracting officer of conditions that need to be corrected or coordinated.
3.02 PREPARATION
A. Surface Preparation:
1. Remove ornamental plaster that is damaged or loose and requires replacement, or that has to be reset.
2. Reinforce and secure loose ornamental plaster that is to remain, using appropriate concealed methods (see 09210-04-R for
guidance).
3. Make molds or screeds as necessary for replacement of ornamental plaster. Match existing plaster profiles.
4. Make accurate reproductions for missing, deteriorated or damaged ornamental plaster.
5. Clean plaster surfaces to be restored, to remove loose and deleterious materials that may affect adhesion or application of
new plaster. Re-attach loose lath or install new lath as required.
6. Spray existing plaster to be pointed or patched with water, or use bonding agent, to ensure adhesion of new plaster. Install
keying systems for larger pieces as necessary. Comply with referenced standards.
7. All existing plaster to be painted shall be stripped down to a bare finish plaster surface with a non-water based solvent of
paint stripper which cannot be water flushed clean.
8. Measure and layout ornamental plaster accurately to maintain pattern and alignment of the work.
3.03 ERECTION, INSTALLATION, APPLICATION
NOTE: Conform to the requirements of the latest edition of "Gypsum Construction Handbook" published by USG Corporation
concerning application of ornamental plaster.
A. Make a template from sheets of metal (brass) cut full-scale in shapes to match existing; use to screed or form gypsum plaster to
desired shapes and contours.
1. Coat metal sheet with layout dye - a blue dye that makes the scribed pattern easier to follow.
2. When the dye is dry, scribe, cut and carefully file the template to remove any roughness or other imperfections that might
be transferred to the finished work.
3. Use a sled to guide the template as it is pushed through the plastic mass. Basic parts of the sled include a "slipper-board"
and the board to which the template is nailed.
a. For bench work the sled is guided by the table edge. Bench-run molds are installed on the job with mechanical
fasteners or adhesively attached with gypsum plaster.
b. For run-in-place work, a guide strip is attached to the wall or ceiling and forms one edge of the pattern; after work is
completed the guide strip is removed.
4. For circular shapes:
a. Follow procedures described in Section 3.03 A.1.- A.3. above, except scribe the center line of the circular shape on
the template.
b. Center a pivot plate to this line and attach to the template board.
C. Mix Plaster: Use special plaster designed and manufactured for ornamental plaster work.
NOTE: Міх the plaster a little below normal consistency for the first mix, then allow the mix to "cream" a bit before placing it on the
bench in front of the template. For run-in-place work a slightly stiffer consistency is desirable.
1. For Hand Mixing:
a. Weigh the plaster, and measure or weigh the water.
b. Sift plaster into water evenly. Do not drop handsful of plaster into the water at one time.
c. Allow to soak 2 minutes undisturbed, then mix thoroughly. Stir from bottom, forcing material to top. Take care to
avoid beating air into mix. Proper mixing forces air out of mix.
d. Continue mixing until a smooth, even mass is produced.
2. For Mechanical Mixing: Mechanically mix cementitious and aggregate materials for plasters to comply with applicable
referenced application standards and with recommendations of plasters manufacturer.
a. Weigh plaster and measure water accurately.
b. Sift or strew plaster slowly and evenly.
c. Allow it to soak 2 to 5 minutes, and mix for 2 to 5 minutes.
NOTE: For batches of 10 to 50 lbs., use a 3" diameter, 3-blade, 25 degree pitch propeller with 1/4 or 1/3 hp. 1,760 rpm direct-drive
motor. For batches of 50 to 200 Ib., use a 4" diameter, 3-blade, 25 degree pitch propeller with 1/2 hp. 1,760 rpm direct-drive motor.
D. Replicate the Ornamental Trim:
1. For Run Work or Straight Mold:
NOTE: This method is used to produce staff work or pattern stock having parallel edges or to form a straight molding.
a. For bench work, some plaster should be allowed to lap over the end of the bench to act as an anchor and prevent
GSA
2. 2. For Circular Shapes (Turning): Like run work, turning can be done in the shop or run-in-place.
a. For bench work, place a center post in a hole in the bench.
b. For run-in-place work, position the center post accurately at the center of the circular shape to be formed and
securely attach or brace to the structural supports.
NOTE: THE CENTER POST SHOULD HAVE A RUNNING THREAD, WITH A DOUBLE NUT FOR HEIGHT ADJUSTMENT. THE
PIVOT POINT MUST BE ABSOLUTELY RIGID AND SET HIGHER THAN THE TOP OF THE PATTERN TO BE MADE, SO THAT
THE TEMPLATE WILL SCREED CLEARLY AS IT ROTATES AROUND THE PIVOT POINT.
3. Duplicate plaster molds by taking impressions from existing plaster molds; create new rubber molds from these
impressions and cast plaster into these molds.
4. Remove plaster molds after plaster has cured, following plaster manufacturer's instructions.
5. Strip and clean existing decoration to produce a clean, sharp mold.
3.04 ADJUSTING/CLEANING
A. When replication and plasterwork is completed, remove unused materials, containers and equipment. Clean floors and adjacent
surfaces of all plaster debris, including plaster droppings daily.
B. Provide final protection and maintain conditions, in a manner suitable to the RHPO, which ensure ornamental plaster being
without damage or deterioration at time of substantial completion.
Last Reviewed: 2017-09-28
Duplicating Plaster Castings
Procedure code:
920011S
Source:
Developed For Hspg (Nps - Sero)
Division:
Finishes
Section:
Lath & Plaster
Last Modified:
02/02/2017
PART 1---GENERAL
1.01 SUMMARY
A. This procedure includes guidance on duplicating plaster ornament that is chipped or has deteriorated. Plaster of Paris is the
most common casting material.
B. See 01100-07-S for general project guidelines to be reviewed along with this procedure. These guidelines cover the following
sections:
1. Safety Precautions
2. Historic Structures Precautions
3. Submittals
4. Quality Assurance
5. Delivery, Storage and Handling
6. Project/Site Conditions
T. Sequencing and Scheduling
8. General Protection (Surface and Surrounding)
These guidelines should be reviewed prior to performing this procedure and should be followed, when applicable, along
with recommendations from the Regional Historic Preservation Officer (RHPO).
PART 2---PRODUCTS
2.01 MANUFACTURERS
A. Rubber Casting Materials:
=
. Abatron, Inc.
5501 95th Ave.
Kenosha, WI 53144
800/445-1754 or 414/653-2000
. Industrial Plastic Supply
309 Canal Street
New York, NY 10013
212/226-2010
. Perma-Flex Mold Company
N
UJ
1919 Livingston Avenue
Columbus, OH 43209
614/252-8034
. Polytek Development Corp.
P.O. Box 384
Lebanon, NJ 08833
908/534-5990
. Smooth-On, Inc.
1000 Valley Road
Gillette, NJ 07933
908/647-5800
>
ол
В. Rubber Latex: #660:
1. Cementex Со.
336 Canal St.
New York, NY 10013
212/741-1770
C. Plaster:
1. Gold Bond Building Products Division
National Gypsum Co.
P.O. Box 25884
Charlotte, NC 28229
704/536-0023
. U.S. Gypsum Association
810 First Street NE,
#510
Washington, DC 20002
202/289-5440,
FAX 202/289-3707
N
2.02 MATERIALS
A. Plaster of Paris: "Kal-Kote Finishing Plaster" (Gold Bond, National Gypsum Co.), "Red Top Molding Plaster" (U.S. Gypsum
Association), or approved equal.
B. Spackle or patching compound
C. Rubber latex such as #660 (Cementex Co.)
D. Paper towels
E. Plywoad
F. Clean, potable water
G. Cheese cloth or burlap strips
2.03 EQUIPMENT
A. Stiff bristle brushes
B. Heating lamp, electric hair dryer or warm oven
2.04 MIXES
NOTE: VERIFY MIX WITH MANUFACTURER'S INSTRUCTIONS
A. 7 parts plaster
B. 4 parts water
PART 3---EXECUTION
3.01 PREPARATION
A. Surface Preparation:
1. Remove ornamental plaster that is damaged or loose and requires replacement, or that has to be reset.
2. Reinforce and secure loose ornamental plaster that is to remain, using appropriate concealed methods.
3. Clean plaster surfaces to be restored, to remove loose and deleterious materials that may affect adhesion or application of
new plaster. Reattach loose lath or install new lath as required.
4. Spray existing plaster to be pointed or patched with water, or use bonding agent, to ensure adhesion of new plaster. Install
keying systems for larger pieces as necessary. Comply with referenced standards.
5. All existing plaster to be repaired shall be stripped down to a bare finish plaster surface with a non-water based solvent or
paint stripper which is not water flushed clean.
3.02 ERECTION/INSTALLATION/APPLICATION
NOTE: IT IS NOT ALWAYS NECESSARY TO DETACH THE PLASTER ORNAMENT IN ORDER TO DUPLICATE IT. HOWEVER, IF THE PLASTER
ORNAMENT CAN NOT BE REMOVED FROM THE WALL OR CEILING TO MAKE THE MOLD, CURING MAY TAKE SEVERAL DAYS BETWEEN
LATEX COATS AND SEVERAL WEEKS FOR THE FINAL CURING.
A. Making the Mold:
1. Detach from the ceiling or wall plaster casting to be duplicated.
2. Patch the fragment or fill in any damaged portions of the pattern using spackle or other patching compound.
3. Carefully clean the fragment for mold making.
4. Brush the master piece with the rubber latex.
5. Cure the latex at a temperature of about 1100F.; Use an infrared heating lamp, an electric hair dryer, or a warm oven to
provide the source of heat; Cure for about 1 hour using heat.
6. When the rubber has cured, apply a second latex coating (the number of coats required is dictated by the size of the original
and the depth of the relief); Cure as above.
B. Building the Mother:
1. The purpose of the mother is to support the mold when it is filled with wet plaster.
GSA
the mold.
4. Separate the mother from the rubber mold as soon as the plaster has set (in less than an hour).
5. Wash the interior of the mold with soap and water and remove any residual byproducts left from the curing process.
C. Mixing the Plaster:
1. Add 7 parts by volume of plaster to 4 parts water; Use cold water to retard the set-up time.
2. Sprinkle plaster powder in slowly; Stir as little as possible.
D. Casting the Plaster:
1. Before pouring plaster into mold, fill the mold with water and then pour water out (this will moisten the walls and ensure
penetration of the plaster into all crevices).
2. Add plaster and cheesecloth or burlap strips for strength; Jog the plaster-filled mold gently to nudge plaster into all the
indentations.
3. Level the plaster; Plaster should be hard enough to remove from the mold in 30 minutes; Allow 24 hours to air dry before
installing.
E. Install the plaster casting using a thin coat of plaster of paris as an adhesive; Hold the piece in place for a few minutes until the
plaster sets; A mastic adhesive or epoxy or gypsum board joint cement are other good adhesives for light pieces.
REVISIONS
DATE/DELTA REMARKS
417 SOUTH HILL STREET
LOS ANGELES, CALIFORNIA
2.
О
=
=
ш
LL] +.
X =
=
о 4
EM
ur
I
"IT
r-
=O
ч
o
иш
СА 92660
949.757.0511
F
949.757.0411
BICKEL GROUP INCORPORATED
3600 BIRCH STREET, SUITE 120
www.bickelgrp.com
NEWPORT BEACH,
Р
SHEET TITLE:
Standard
For
Rehabilitation
SUB DATE 06/07/2022
| ворак 00000000000 DATE
DATE: 05/23/2022
DRAWN BY: TA
JOB NO: 21051
CHECKED BY: EM
SHEET NUMBER:
А—0.2Е
REVISIONS
DATE/DELTA
REMARKS
TERES]
==
[ien LL.
= [== ==
iN CQ 5 =
3 ® 4H © <í 30
d © 73' PUBLIC RIGHT OF WAY © —— sa Hae -
o ЖӨ ЭЖ j © — as Г то
BOOK 1324, PAGES 69-78 5 $ BOOK 1324 PAGES 60-78 Ф)
BASIS OF BEARING $ © ‚ ; aJ
_ _ " " Е hi ——— ПИОНИР e _ ч CENTERLINE OF RIGHT OF WAY _ - a _© |... 409.86 6 _ i _ а Ш “Г | | |
сыы FOUND LEAD & TAG LS #2304 Г dis il © @ — [= —1
ON LINE AND 2.00'N р D uan І
FOUND LEAD & TAG LS #2998 | (Rb @ m S07*1219"E Y > Ш
+ ON LINE AND 1.00N V |886 @ © © 21.19'
г FOUND MAG NAIL PER MAP BOOK 1324, PAGES Б РЕР 8 " * О (9
| ON LINE & 4.74'N - = «va ЧҮ S521538'E __ (05706 TYPICAL 203.86 т -9 i o >
ü is (М) nons OWT." - 39'; >, SoufuWESTERLY RIGHT ОҒ: NE ER. . TON ey —G 5. > Е | О) Q
L Ей) ay " ч Y : NA. n" 26.1, ы e. . . I v HR
| | 7. М7 Nszissstw 105.05" mae yeas? = aida — — : NN sw IG 2587 ~N <
| | э, 5 ы a > v E 2 А. b "Г wid Rede | ' Г] =
| DEW 2 z з» „о |8 ч Фф
| | TE - NG и 4 УАТ NS x ES. IN |
paren 2 z 2 Ti ТИР EASEMENT AREA us l aoe О
| | 2 й NA а: PER RECORDING NO: 87—745703 К> ang l l q
І Ы М NA a “AN € : E І |
Г кые E a NIN - 2 " | ч
E NE vw EE |
| S a Wo b. ы |
І E e NF wm] ш І
l 2 ай PARKING GARAGE NS PARKING GARAGE | -O| g = j =] О)
а Na "d PARKING SPACES Tm E.
| >: OWNER МАМЕ UNAVAILABLE ONLINE = Ni REGULAR- 290 ATRAI Bi i
i Cee N PARCEL МО: 5149—027—901 NZ г HANDICAP=2 bma І —
| | YIN NE AN А р = |
Pare a 2 Nig
E i {ш йш
| _ E] ‚\ | Veet] | | I
"BRN “Ж ГЕЗ .
1 I, tem RY Z Vi- i Š |
t T NE Me] o.
Б И NF wie >e |
| B И М РМ A © 4B e. |
| Е IP 2Y \ Bybee ..
i ® МЕ MZ Wile..." 5 І
i2 A № ub. bi
| sorely 0 55200'50"E —— 105.05' NL dé. 3 | Qoor
|] ——9——— ‘ew aes cites A5 Жыкы i Mr lbs Ss > S- – – a TAN 7,0 À deed ` Me B = | ш N © Ta
x E а 95.0 BUILDING IS 0.2 ON, 2 " ЛУУЛУГУ АТА! Р. z POO AANS i m
| aR | Legs КЕ MOST NORTHERLY CORNER OF LOT A | * Mu l FT OoO
| eg 8 ©8й | Gus | S. E $ | TUNO
én S 288 шен PARCEL 1 | E те re oh
| 28 [| бохи [FI Spo: AIRSPACE LOTS 2, 3 AND 4 | т s$ І Co.
| gz 2238 |: SE (SEE SHEET 2 OF 2 FOR DETAILS) | WE n. i І О 5 < N
oj e | LEO 9
| 28 ' 253 Bow | S т | 2 DOO.
< | db Be ep | t 23 om Ode
| x 98 OS wee TRACT NO. 53831 | q3; | OL
i Eg E J "955 MAP BOOK 1324, PAGES 69—78 | =." | | e “Фф
2* |! g a - " FC SUBWAY TERMINAL LESSOR, L.P. | BUILDING IS ОМ ИМЕЛ | а | Our...
Ps | Uwe PARCEL NO: 5149-027-016 i s -E zuot
n. E ace l H — Ф
| me | LIB | re
! . ШЕ | Ай. | а a "x
m: | «4 £4. | Ш –
n. mV | AUT ә 0
| 5$ 1 В “ee MULTI-STORY | ы Ж | | T - 2-
| [NE ET ea BUILDING | Afu] COUR о
mse ae AREA=50,238 SQ.FT. І iy | Or Cio
® PUR RAILROAD COMPANY EASEMENT PER FOOT PRINT) ! z 48.00
og 40.00! 4r = РЕН ВООК 3943, РАСЕ m 6 NL Ч “4. [E | i d — Q P c
| >а; - Be % LOWER PARKING LEVEL L-------------------------------------- „ТР ! uj a. о >
Әз | 7 HANDICAP vday | cru
[we F ) оос о»
! Á xm (А Celor І e е LLI Е
: E : [тиенне ннен НАН Ap: |5 | moznus
a
| a SR 2 POINT OF BEGINNING POINT OF BEGINNING | Fu] |
| ! ШКУ аР ee _____ —— ———— S | |
í anf | ПЕЕ Е 45.00. І
Моо IE ul ON NN aa ua ah Para a aa P P a ОРАР ү $ ga Mite eeke LB E И а а аы ааай a a a Sy] A5. или зг
| 40.00 ||.. J— соон | ЕИ mag р "шр EN AN ndn | Es J 18 |
pod $E i » , NS. NC e
eT | N52°04'31°W М. 324.26 iy |
| ze ТЕ Е з аса ма Se eee eee ]* 3e s !
би T v TE N520420'WR) 80.9208) |... N52'0420 WR) 131.92(R) ee NE
sg | s ЕЕ Р Eee PARCEL 4 5 |
ge 8 15° UGHT AND AIR EASEMENT ЕЁ 12° INGRESS, AND 15' LIGHT AND AIR EASEMENT b2 |
Е | 34 PER ACCESS EASEMENT PER en | \
| ей | | p TT INSTRUMENT NO. 98—305962, ra] \ |
| жый | 5 EE AMENDED PER INSTRUMENT NO. Г 1 | І
ы | z 22 01-0145851 л 1
| ЕВ OWNER МАМЕ UNAVAILABLE ONLINE | 9
M | PARCEL NO: 5149—028-023 ADJACENT 6 STORY MIXED USE BUILDING | al
| z= l | | m l
І Be р-а І
| | |
7 s
N3751'00"E
FOUND SPIKE AND DISK
PER P.W.F.B. 1321—121 AND MAP
BOOK 1324, PAGES 69—78
CENTERLINE OF RIGHT OF WAY
4
The plans, ideas, arrangements and designs indicated or represented by this
drawing are owned by, and are the property of BICKEL GROUP, and were
created and developed solely for use on, and in connection with this
specific project, and shall not be used, in whole or in part, for any purpose
for which they were not originally intended without written permission from
BICKEL GROUP © 2021
SHEET TITLE:
GRAPHIC SCALE ENG | SEARS |
Q0 15 30 60 a t SITE PLAN
FOR REFERECE
ONLY
LINE TABLE
SUB DATE 06/17/2022
BID DATE
DATE: 06/13/2022
DRAWN BY:
JOB NO:
CHECKED BY:
SHEET NUMBER:
A-0.3
REVISIONS
| DATE/DELTA REMARKS
RSS AA
€ 1 :
= DERE
E.T.R.
OFFICE i
B-OCCUPANCY
34 860 SF / 150 = 233 OCCUPANTS
Ф . . `~
E ee шш шш шш шш шш шш шш шш шш шш шш шш ши шш шш шш шш шш шш шш шш шш шш шш шш шш шш шш шш шш шш шш шш шш шш шш шш шш юш шш юш == -— m — н н == -— m m € € € €
`~ . + #
417 SOUTH HILL STREET
LOS ANGELES, CALIFORNIA
>
О
=
=
ш &
ш Е
Y 2
r=
TE.
— I
- LL
T c
oo
~ Qc
eO
Y LI
o
I
а: асаа QOL E Vows REOS ono ee pee gore ANTS x 0.2
ЭЖЖ 23.4” ВОЮ. EGRESS
! IDTH
^ eg ge > 0b. M ва — 3 3w—
! DN
1 Sse
=
1 ШШШ ЫШ | Jc o AaMNMU"-ssst9teeeouEE я
! ===
1 Si =a
a
i —
i г====
І а
1 jen
І o
І Гаа]
i =
i
1
1
! EXISTING 11 STORY
! MIXED USE BUILDING
[|
[|
п шаоо-
3 AE T m | | OMM О шо С
=н DEETOGO
Wie LA =
осо
О OZ E: |
DOO CC (Г (69) O о "
OF -oo
o Ових? о
uzuoi;
Ш акы x
230 wa
= aso
Ш От, о_
L O ig
X Ort w
| ADJACENT 6 STORY O u cos
І ADJACENT 6 STORY ADJACENT 6 STORY MIXED USE BUILDING CC х О > +
! MIXED USE BUILDING MIXED USE BUILDING = оошо z
EXISTING STAIRS EXISTING FENCE AND GATE EXISTING DRAIN EXISTING FENCE AND GATE EXISTING DRAIN EXISTING FENCE e «m Б Zaz
TO REMAIN TO REMAIN INLET TO REMAIN TO REMAIN INLET TO REMAIN AND RAMP
4 TO REMAIN
116 OCCUPANTS x 0.2 ЕТЕ.
= 23.2” RQD. EGRESS
WIDTH OFFICE
72” PROVIDED EGRESS
= CITY OF LOS ANGELES
DISABLED ACCESS SECTION
This set of plans and specifications has beea reviewed and is approved for
compliance with state and local laws and ordinances related to accessibility to EXISTING & PROPOSED ENLARGED SITE PLAN &
public accommodations and housing.
EGRESS PLAN
The stamping of this set of plans and specifications shall not be held to
permit or to be an approval of the violation of any provisions of federal, state, and SCALE - 3/32" z 1-0"
local laws and ordimances related to accessibility to public accommodations and
housing. , LEGEND- EGRESS PLAN LEGEND &
йы ОА Total „Шы enn ы ий ius 4
UO — — — EXISTING EXIT PATH TO STREET TO REMAIN % downy i mel b ond o te propery of AAEL. GR, ан wre
Date: 03/31/2023 ---- ff} ----- CUMULATIVE OCCUPANT LOAD FOR " ee iil and д ты aed hieu i Pape
LO TS
EGRE PATH/EXIT BICKEL GROUP © 2021
MEUS | L2] EXISTING CONCRETE WALL TO REMAIN
— EXISTING CONSTRUCTION TO REMAIN
CLA EXISTING MASONRY TO REMAIN
EXIT SIGNS TO BE PROVIDED UNDER SHEET TITLE:
SEPARATE TENANT IMPROVEMENT
PERMIT PRIOR OCCUPANCY
SPACE SIGNIFICANCE | SEE FLOOR PLAN FOR MORE INFORMATION ENLARGED SITE
[| PARTA | ALL CEILING & FLOORING TO BE RESTORED PLAN @ PASEO
PART B | ALL CEILING AND FLOORING TO BE RESTORED
ЙИ outor SCOPE
DATE: 06/13/2022
DRAWN BY: TA
JOB NO: 21051
CHECKED BY: EM
SHEET NUMBER:
| | REVISIONS
| |
DATE/DELTA REMARKS
a 1—14 WZZM LLL LLL UL Ln LLLA LLL LLL LL à. | + #_______, —__| }_|_ #-_ VLLL EE] EP EY See ( к )
Fes 1 py
| ШУТЛ dcm EL WD Rea BT ORT TT as pM СС | УРЫК. AL LI LI oL A Td a a ST NCIS a ТАЕ Жол
[|
TREES EUN К мк ОШ Ed ——— € ОАА
A | | ni
Д 4
In | Il
m ! ll
EXISTING STAIRS |
TO REMAIN, TYP. !
І
І
!
|
|
E
RASSA
RS
a
NSSS
SSS
INFILLED
HISTORIC RAMP
TO REMAIN
SSS es
S
SS
NIS
NS SSS
SSS
SS
WS
S SSSS
ASS
As
SSSSSS
SS
RSSSSSNNNS
N
— 22 TN id dA de ЧИНЕ Е ИА Н
ЕВ |
E.T.R. |
MECHANICAL AREA |
EXISTING COLUMNS
TO REMAIN, TYP.
1 1 І 1
I 1 I 1
EXISTING | | | |
CASING ! | | EXISTING COLUMNS
TO REMAIN | | | | TO REMAIN, |TYP. |
| | | | OFFICE EXISTING SHAFT EXISTING STAIRS
| | | | TO REMAIN, TYP.
| | | |
р
£g---—--—--
O
С)
С)
Ст.
"U
2
Z
O
—< --— --—--
TO REMAIN ТҮР.
| | | |
@ | | КК NE
N | | | | B-OCCUPANC |
| | | | |
| | |
EXISTING SHAFT | | |
ТО ВЕМА\М, ТҮР. | | |
| | |
| |
| | | i / E
| | | ra
| | ! EXISTING STOREFRONT
К | | | | EAD EE UAR ма
d poco gy S _ | _ ___ “%
DN | О ЕХІЅТІМС | | | Jj à
| | , І f
|
1
1
417 S HILL STREET
HISTORIC REHABILITATION
417 SOUTH HILL STREET
LOS ANGELES, CALIFORNIA
l
І
l
І
|
|
SSNS
SSFSSN
[
|
І
l
|
І
INFILLED
Мух
EXISTING (81)
STOREFRON
HISTORIC RAMP
SSS
W
o ини с Jl--—--—-- 7 ———6- 1 i І 1 1 1 --—--—(c)
| / | | | | І I | | NON-HISTORIC І І | | | | " EXISTING
| EE рор S Sose
/ ) | EXISTING STAIRS ! | | | ME | | | EXISTING WALL ОР EGRESS | же гои раа:
| | TO REMAIN, TYP. | | | | | | | | | | ee |
| / | | | i | | | RE | | | NE |
--—--—-- ]1---—4 --—--—--—--—--—-- EA —— — -— ыыы 0) —-.—--—.a---—--—-1—--—|
l l
| l
|
| [
! l
A TO REMAIN | |
Ф | E.T.R. |
СЕ ren дак,
——— fe 2 xy
|
Л // | T TO REMAIN
2 И |
© / EXISTING CASING EXISTING CABING UNUSABLE |
© jo @ TOREMAIN | TO REMAIN | SPACE | |
© f І І І
У БАБ аттыр f @ ||
SS 22 oe F €—€—— -H зы же =з ра == к= = е uiu duri. — egg ныны шыр кышы шщ NAE
QU 5 5 „„, # .„„ #У 7227 ia ists 7177728222222 TE а ааа ае ааа —— oo РРР —a) off
| м. | E O TT
| | РУ EXISTING “ж ТО ВЕ | EXISTING Shen TO BE | | | “ЖООК А — M | o 9 0
] ] ] | PREPARED FOR NEW STOREFRONT PREPARED FOR NEW STOREFRONT о T dos N О
LO А
(8) (10) бо.) Ce] < ^
O oO
EXISTING CONCRETE EXISTING DOOR TO BE "ZR. EXISTING CONCRETE EXISTING WALL OF EGRESS EXISTING FENCE =
WALL TO REMAIN REMOVED; EXISTING 42307 WALL ТО REMAIN CORRIDOR TO REMAIN у AND GATE TO REMAIN
OPENING TO REMAIN FOR Yi
NEW DOOR EXISTING EGRESS
REFERENCE IMAGES STAIRS TO REMAIN
- T 7 ra 7 EXISTING EGRESS
8 | e P
.bickelgrnp
EXISTING/DEMO FLOOR PLAN | GROUND FLOOR
SCALE = 3/32" = 1-0"
п шае
ш N
ә,
(у E
rk йа
oO95&5
ш 2ш
JESS
ш_ От
м б
бш
cB
m «mo
I
O
<
üi Ge
ov
‚©
ҮР
On
0 o
> Ч
ui
zo
wW № WwW
77
HZ WY)
Staircase To Subway Terminal | Main Hall LEGEN D
ou) EXISTING CONCRETE WALL TO REMAIN
ШИШ EXISTING CONSTRUCTION TO REMAIN
CL EXISTING MASONRY WALL TO REMAIN
SPACE SIGNIFICANCE
| | PARTA |ALL CEILING & FLOORING TO BE RESTORED
PART B | ALL CEILING AND FLOORING TO BE RESTORED
OUT OF SCOPE
М NOT IN CONTRACT | NEIGHBORING PROPERTY dn aa oars Wane еи BL Co we
Seis EU мыкы FOF е түш
for which they were not originally in intended етін еп permission from
BICKEL GROUP © 2021
CITY OF LOS ANGELES
DEPARTMENT OF BUILDING AND SAFETY SHEE IITE.
DISABLED ACCESS SECTION
€— А EXISTING
This set of plans and specifications has been reviewed and is йа ж FLOOR PLAN
compliance with state and local laws and ordinances related to accessibility to
public accommedations and housing.
The stamping of this set of plans and specifications shall not be held to
permit or to be ав approval of the violation of any provisions of federal, state, and
local laws and ordinances related to accessibility to public accommodations and
housing. 5
By: EDDIE GARIN Total of Sheets = ілге ЗИ е
JOB NO: 21051
CHECKED BY: EM
Date: 03/31/2023 SHEET NUMBER:
@) Historic Low Sofit © Existing Storefront Entrance| East Elevation А-1 О
o Waiting Room & Concourse Looking East (4) Existing Columns, Тур.
| REVISIONS
L EXISTING bis TO REMAIN
| | |
| | | | | DATE/DELTA REMARKS
227777777 UL LLL LLL LLL LLL A LLL LLL LLL LLL LLL LLL Lol LLL LLL A Я к ишер» —(к)
оо тоа азизи
MES жишш
БЕК
SS
SS
SSSSN
|
EXISTING |
CONCRETE |
$S
x
WN
ааах
TO REMAIN
oo
EXISTING STAIRS |
TO REMAIN, TYP. |
Еа
WARS
= IN
Бенин MEN MEER. AAL
!
EXISTING ( OLUMNS paman SSS
| 1
I
| l
NN NS
TO BE REHABILITATED PER
NOTES, TYP.
И ЕНН.
|
І
І
l
SSSSS
RSSSSN
SS
А
— — S — q —— —— ——— ——
КУ
SSS
МК
|
a
|
|
|
| RSENS
T
T
|
|
|
=
КИНИ БИРЕ
=m
ts ae
1
I
EXISTING |
HISTORIC !
CASING |
1
l
EXISTING COLUMNS
TO BE REHABILITATED
TO REMAIN | PER NOTES, ТҮР,
l
|
OFFICE
-OCCUPANCY
EXISTING о
AROUND THE SKYLIGHT
TO BE REHABILITATED PER
NOTES, TYP. :
!
l
l
l
! З
! А |
P_i . H
! { Uu
l {
| CEHUOEDHBIASESUNCEN A
l
!
EXISTING SHAFT
TO REMAIN, TYP.
417 SOUTH HILL STREET
LOS ANGELES, CALIFORNIA
EXISTING иа
ENTRANCE ТО REMAIN
SSS
SSS}
Ss
I a a Фф. L —Ó—— фф
i} 1
| EXISTING | "EE. | s.
| І | f
|
EXISTING |
СОМСВЕТЕ @ |
TO REMAIN |
"ERR EE —{ —— ———
NON-HISTORIC | |
!
| EXISTING
| COLUMN TO REMAIN
!
|
!
l
VESTIBULE
TO REMAIN
Z
О
þ—
=
ш S
Tim
Y
Y=
TE.
-l I
=! Ш
T c
oo
~ Qc
m
O
ч
o
I
SSSSN
1
|
Dl NS 1
ЕТЕ 2-HOUR FIRE |
1
|
1
[
SSS
ааах
EXISTING 2-HOUR FIRE
RATED, WALL ENCLOSING |
THE ants EXIT STAIR|
TO REMAIN i
| |
ae а шош ш aoa ee —- Se =
EXISTING STAIRS
TO REMAIN, TYP.
SESS
SSNS TRS
SSS
NS
EXISTING
STOREFRONT
TO REMAIN
EXISTING pce
TO BE REHABILITATED
PER NOTES '
СЕС DIES „меры
i а аа г м LORNA vow
WEED X
-———————————— — GN (à LL ULL = = Гі M Te ey: a E i ieee
A Eh 1B ZZ N 200236877 2 Г 100222 2 2 110—222 2 2 2—02 2 222 Г 10222 222222222 2 210222222 22 210222222 2 1102222222 2 10022222222 222 LLL PEE Г21102_Г Г A y —(а) т = €
ДЕ ЕЕ), БЕ) о
| | | NI | NEW ee | NEW eae | | | | | | [Ld | | | | | NC | | | | | (л) © O О
| | | l IN EXISTING OPENING | IN EXISTING OPENING | | | | | | | | | l | | | | | | | | Q M О
| « ps
(8) (10) (10.4) Os) О (18) c not
St
EXISTING CONCRETE NEW DOOR IN EXISTING (2 Y EXISTING CONCRETE (2 \ EXISTING FENCE О
WALL TO REMAIN OPENING \a-3.0/ WALL TO REMAIN Me30/ AND GATE TO REMAIN JE
PER ELEVATIONS AND DOOR ШЕ
SCHEDULE
REFERENCE IMAGES | HISTORIC & CURRENT 7 э -———- pesce 2
«
PROPOSED FLOOR PLAN | GROUND FLOOR
SCALE = 3/32" = 1-0"
LEGEND
ОСТ EXISTING CONCRETE WALL TO REMAIN
ENEN| EXISTING CONSTRUCTION TO REMAIN SPACE SIGNIFICANCE
ГЛ EXISTING MASONRY WALL TO REMAIN
L| PART A NOT IN CONTRACT,
NEIGHBORING
PART B PROPERTY
BICKEL GROUP
ARCHITECTURE
BICKEL GROUP INCORPORATED
3600 BIRCH STREET, SUITE 120
NEWPORT BEACH,
P: 949.757.0411
www .bickelgrop
Exposed Existing Pink Tennessee
Marble
И OUT OF scope
EXISTING FLOORING
-s
f ! EXPOSED EXISTING PINK TENNESSEE 7 ly
Е v MARBLE, TO BE REHABILITATED PER
NOTES
GENERAL NOTES
PART A, CHARACTER-DEFINING ELEMENTS
ap French Pink Tennessee Marble | Flooring
e Condition: Remains for the most part dirty, studded with partition fasteners, and damaged by suspended renovation.
e Repairs: Clean, patch with resin, match the tone, fill dents to avoid trip hazards; repair all surfaces as per rehabilitation
recommendations in A-0.2
Q Terra Cotta Cladding | Columns (GL 9-11)
© e Condition: Intact above and stripped below the suspended ceiling system. The bottom portions of the columns аге
refinished in gypsum board or plaster in a smaller, square profile.
e Repairs: Remove all non-historic elements. Clean, patch, and repair existing terra cotta cladding. See
recommendations in A-0.2. Rebuilt the removed portions of the cladding with GFRC following the original octagonal | "-—
shape; GFRC to be aligned with existing terra cotta cladding; attachment to be designed as design-build. piede peli deiude nr eae ie бе
created and developed solely for use on, and in connection with this
Ф Marble - Concrete Borderline
>
Existing Columns
Skylight Hall, Historic Concourse,
Significant Space Contributing Space
де project, and shall not е used, in poii in part, for any puo
© Terra Cotta Capitals | Columns BOXEL GROUP © поп nn иі wren pemision from
@ Exposed Existing Concrete, © Existing Plaster Casing Ө e Condition: Overall, preserved; There's peeling paint, and chipped plaster in places.
Non-contributing Element e Repairs: Clean, patch, and repair as per rehabilitation recommendations in A-0.2 SHEET TITLE:
ы Bier ed e
he | | | 48 Е OF POR DANC ery PART B, CHARACTER-DEFINING ELEMENTS
dila E 9 DISABLED ACCESS SECTION | :
LAT. ap French Pink Tennessee Marble | Floorin PROPOSED
43] ; : e Condition: Remains for the most part dirty, studded with partition fasteners, and damaged by suspended renovation. FLOOR PLAN
This set of plans and specifications has been reviewed and is approved for е Repairs: Clean, patch with resin, match the tone, fill dents to avoid trip hazards; per rehabilitation recommendations іп
compliance with state and local laws and ordimances related to accessibility to A-0.2
public accommedations and housing. i
ON EEE P EE d idum dal nd be hd de Ө Terra Cotta Cladding | Columns
| сс al abana сес provisions of federal, state, and e Condition: Intact above and stripped below the suspended ceiling system. The bottom portions of the columns are
| 3 acti ordinances M sevi э кик иннин ы refinished in gypsum board or plaster їп a smaller, square profile.
CI ——— —————————— | e Repairs (applicable to capitals): Existing to remain.
E TAI LS © Е MA I N WA I TUI N Gs l s
E - — ——M = -— : By: Total of Sheets . . DATE: 06/13/2022
FYBWAY ү“ Т ERMIN & L`. B | 03/31/2023 O Plaster Casing | Door and storefronts openings DRAWN BY:
5 (oC. POR - THE + SVBWAY - TERMINAL + BVILDING, СӨ: Date: e Condition: Remains for the most part dirty. There's peeling paint, and chipped plaster in places. ucc Бү:
| LO ANGELES «= a UT c Yo Ns `
22016-10000-19644 e Repairs: Clean, patch, and repair existing casing per recommendations in A-0.2. For the new storefront opening, built
SI А i | | s E ELI EN. ИЕ S ii Qnis pa desuper ocu y v e a vos P hanle caa. h т т х я li А А z a : > SHEET NUMBER:
-— - | D. | new casing from mold to match adjacent existing casing profiles.
G) Floor Plan, South Half | Original Drawing (2) © Terra Cotta Clad Columns | Original Drawing @ © Terra Cotta Clad Columns | Original Drawing A-2 O
ө
In case of necessary interventions beyond those proposed, consult with the lead architect.
| | | | REVISIONS
| | |
| i EXISTING PIPE CHASE, TO REMAIN! EXISTING HISTORIC LOW SOFIT, TO REMAIN |
| | | |
| | | | DATE/DELTA REMARKS
| | |
== | ETE | | N Re N |
| JS N Qo М |
: N AQ N
, 9 | | N XW LQ YASS
|
MECHANICAL AREA
[e |
ЕТЕ. 5
4
4
|
|
|
|
|
|
|
|
.
a
[|
|
а
|
at
|
|
=
|
Vul ure
жїз ET 9.7 74
[
|
|
0
[|
l
l
l
l
l
І
l
l
l
|
l
l
l
l
l
>E
j
І
І
[
І
[
І
[
І
[
[
І
[
————
!
І
0
0
[
П
[
І
[
[
І
І
[
І
[
[
І
П
]
| | NN ERR
| | “RESIDENTIAL ARAR EDING
a ae bas
ACE ER
a Oe FEM Ta: ot a
=
els ee үс ЖУ,
PETE Rr eon
&]
- [—— 8 s N&* ш NN NW NW NW NW шиш HN IN сис С-ы йсй WEZ
| | HO ө. | | (Мете ОО ll Y -uo
p i | | | | | | | | | ! | | | | ||| OFFIC | | | ILLI | | LL.
| : : | | | cca | SPCQURANEY р I! , | em;
_ E | | | | | | | | | B-OCCUPANCY | | (| ЕЕЕ! || | | Y) J T
= mmm wjr F` ~ == 2°
| | | | | | | | | | | a = | | | || || |товесоокоматеоматн | N) | | | d т т
: ee н 2 UU = БЕШ
Кл eee E Se Se uum BRE пар Bee еее лк Nee See Vee eee -
mE 1 | | | | | | | | | : Ui 22. | neer айбык ied YE od | | О =
x | | | | | | | dem | : | | =
S | | | mN + 0
ENS i - Ac LS SEZ вании] 4. q- тк == ii x Т = q О
+
HISTORIC REHABILITATION
[ | [ | D l | | l ! і ! l ] l l l |
| ] | | | | | j j "I | pub “== CEILING REHABILITATION
| | | | | | | | | | TO BE COORDINATED WITH
| | | Т.К. | | | | | | ‚|| | | | |||! | | REVISED OVERHEAD
| | | UNUSABLE | INSTALLATIONS
г ж! [кт | С с | | | | EXISTING EGRESS CORRIDGR TO REMAIN ! : — : |
СЕСЕ С алиа YY Г Yi) an), ff, ai 77777777 стии wy, WH 0220222222222 0222222222222 TOTO. CHAE... LEE OOOO 7 MÀ |. OL Ш ag С Р
| | | | | | | | | | | | | |_| | | | || | | reresgo
! PAINTED PLASTER COFFERS AND ORNAMENTED BEAM EXISTING CEILING AT UPPER FLOOR EXISTING HISTORIC LOW | | EXISTING CEILING AT UPPER FLOOR ! SKYLIGHT ABOVE PLASTER COFFERS, NOT VISIBLE — Lys N о
L H l д еч ТҮР; ТО ВЕ а РЕВ " " " EGRESS Pu TO p à SOFIT, ри 4 " EGRESS ENCLOSURES, TO REMAIN d FROM BELOW; REPLACE|GLAZING PER к! " O т Е or?
Lo dD s
O
tu
\ | A А
(8) (10) бол ba exo (18) mr 2095
Or -oo
REFERENCE IMAGES | HISTORIC & CURRENT REFLECTED CEILING PLAN | GROUND FLOOR oO opr?
' cues 7 oan А E = Iie = TE N di a PUN акса Орел ра (а E — " — mn" E СС 4 Ф
a Түс, SCALE = 3/32" = 1-0 ЕТЕ те
= LEGEND = On a
A ine, Ш ST Ou
im ' T EB [| го N
S es ШШЩ] EXISTING CONSTRUCTION TO REMAIN SPACE SIGNIFICANCE N Or Cio О
с. MEE alt (а) 2222 “OR
T N | | SÉ o9 usi:
e MIS | | PARTA OUT OF SCOPE т хо>
| ОГ. = оошо?
Je qj CEILING FEATURES ТО ::* CROWN PART B I] NoT IN CONTRACT, i ec
ы ше: BE REBUILT FROM MOLD . *** MOLDING NEIGHBORING PROPERTY moznams
2 ^^ vee ч. ай. P ee | “=== ES AMT | PART A, CHARACTER-DEFINING ELEMENTS
, Y% ` \ n. і - Я EE | ii =7 HIR КӨЛ ге ПЕ! TPR. fis
' И d Ж, | ge 7 —— м мад || | E Ceiling Type 1 | Plaster coffers (GL 9-11
@ Subway Terminal | Main Hall Looking East Ө (3) Crown Molding Details, Arcade | Original e Condition: A beam and coffer system of painted plaster, with rosettes between coffers - extensively damaged from the
anchoring of the suspended ceiling system and other work.
Drawings KS " TO
9 e Repairs: All non-historic elements їо be removed. Clean, patch, and rehabilitate as per recommendations іп А-0.2. То be
painted cream white. Leave one or two clean existing modules for reference.
Ceiling Type 2 | Original coffered skylight
e Condition: The original wood frames with compo ornaments and multi-globe pendant lighting are missing. The original plaster
coffers are extensively damaged from the anchoring of the suspended ceiling system and other work.
e Repairs: All non-historic elements to be removed. Clean, patch, and rehabilitate as per recommendations in A-0.2. Install 14"
clear, tempered glazing with frosted coating on bottom side. To be painted cream white.
Ceiling Type 3 | Plaster coffers
e Condition: The existing original metal grid holding the ceiling is compromised . Original plaster elements and pendant lighting
are missing. The existing original plaster coffers are extensively damaged from the anchoring of the suspended ceiling system
and other work.
e Repairs: Existing original metal structure - to be repaired; combine, where necessary, with the new suspension system. Missing
original metal structure - apply new grid, see A-5.0 for details. Existing plaster features - all non-historic elements to be removed;
repair, and rehabilitate according to notes in A-0.2. Missing elements - to be rebuilt from mold to match ceiling Type 3; for
attachment, see A-5.0. To be painted cream white. Leave one or two clean existing modules for reference.
Ceiling Type 4 | Original Arcade skylight doing ore owned by and re the propery of ВСЕ, GROUP, ond ere Н
created and developed solely for use on, and in connection with this
e Condition: The original plaster framing along with the original wood frames with compo ornaments are damaged from the S teh ley кот жеш кеке valu bien jor imn Tem
anchoring of the suspended ceiling system and other work. The original obscure glass is missing. еы
e Repairs: All non-historic elements to be removed; repair, and rehabilitate. Missing elements - to be rebuilt from mold to match
ceiling Type 4. Install 34" clear, tempered glazing with frosted coating on bottom side in the original wood frames. See А-0.2 for
rehabilitation guidelines.To be painted cream white. Leave one or two clean existing modules for reference.
Ceiling Type 5 | Original crown molding, Arcade
o Ceiling Type 4 | Arcade Skylight, Wood Frames
w/ Compo Ornaments & Plaster Coffers
SHEET TITLE:
aM
REFLECTED
e Condition: Missing or severely and extensively damaged from the anchoring of the suspended ceiling system and other work. CEILING PLAN
e Repairs: To be restored, rehabilitated, and rebuilt from mold to match crown molding types; per recommendations in A-0.2. To
be painted cream white.
Ceiling Type 6 | Arched plaster coffers
To be cleaned as per elevations and notes A-0.2E. FTT
SUB DATE 06/17/2022
PART B, CHARACTER-DEFINING ELEMENTS
Ceiling Type 1 | Plaster coffers DATE: 06/13/2022
Ў . : А DRAWN BY: TA
¿3 e Condition: A beam and coffer system of painted plaster, with rosettes between coffers - extensively damaged from the JOB NO: 21051
MELE Y = anchoring of the suspended ceiling system and other work. CHECKED BY: ЕМ
| d MEI MI | | e Repairs: Clean, patch, and paint as per rehabilitation recommendations їп A-0.2. To be painted cream white. SHEET NUMBER:
@ Ceiling Type 1 | Plaster Coffers, North Ramp @ Ceiling Type 2 | Coffered Skylight © Ceiling Type 3 | Plaster Coffers With Q Ceiling Type 6 | Arched Plaster Coffers, Vestibule 6 Ceiling Type 5 | Crown Molding, Arcade A-2 1
Center Piece, Arcade In case of necessary interventions beyond those proposed, consult with the lead architect. Ы
REVISIONS
DATE/DELTA REMARKS
Шаг ШИ
Ce Т = tel e
Hoe \ evel 02s Quse 7 | EZ
21-6" DT Ер" |
рч on ы E
aa | | | =
SGA | | | т = =
egoa — DS | | | gre E EEN tesla. e - < <
Ш =
SOUTH ELEVATION - DEMO LLI = r 2.
3/32" = qus -—- Ш c
(c шо
= nc LL.
[— —
I- 00-3
[1 -————— — — — —————— —— ———————— ——————— 2 '———————— —— — үүт ӨӨӨ NS tS EEE сма ra 31 О) О) «
ls =; [== m 7 SUN - gui, T н]
! Lu L. -H:H аң 0 Б $ jo
1 m| g sA e e Ы Ши Tie
| =! A үш | к у NU үү у у күү | л ү үл ү ae oe | un
1) „= 8 ааа = О)
Ta =a m Ж | m- m-m- тылу дин эшч шиш шшш иш чиш — — пин - шин ЁТ T
FAS | ee a К —] Ш = ш
E hgga? cam um durs
| Ale =e / mm um m ш a M |
ши Ш. 1 Т Eee cou
nm Ж _ = oe ШИЙ = ШИ S
—— кпе ВИИ кн с — aeos e o o9
oe : ES EZ O 2 Z
| aM | | | ~ <
| | | | үм Y + 0)
Hoe NC EevelF02 4; | | | EZ qm О
21-6" | | | er
| [ | | F-
| E 21
| [|
T T / T T T E
Level 01 % Level Ot 4)
SOUTH ELEVATION - PROPOSED
New dark bronze anodized aluminum storefront window frame arcadia
(or equal). PPG solarban 60(2) clrieli{oreauaNdeLkssulating low e glass
panels "t" deno
details 6,7,11,12 que a РОО ТФ]
This set of plans and specifications has beem reviewed and is approved for
compliance with state and local laws and ordimances related to accessibility to
public accommedations and housing.
3/32" = 1'-0"
оо т
D. ШО ОЁ
GENERAL NOTES: aie 9959
TIME
: — - е" ODAE” о.
a> Rusticated granite tiles. Original, significant character-defined features O35 «^o
from primary importance to be cleaned. (E I- = 000,
(22 Terra Cotta. Original, significant character-defined features from O9c- à о
primary importance to be cleaned as рег note A-0.2D Ө; Owl un
Common Bricks. Original, non-contributing to be cleaned. Ш 2 = - Ф
Skylight. Original, significant character-defined features from primary „к акш у
importance to be cleaned, sealed and broken glasses to be changed. — © Onto
Elevator and metal stair. Non-original, to remain. LJ Tr Т | оа
Remove existing door. Existing opening to remain for new door. “ Og £ P О
Prepare existing openings for new storefront per proposed floor plan О зт Or:
and elevation. О ш cos
еб oss
Not used. peo s s
Not used. Ш < mozàs
The stamping of this set of plans and specifications shall not be held to
permit or to be az approval of the violation of any provisions of federal, state, and
local laws and ordimances related to accessibility to public accommodations and
housing.
@ О Ө Fifth Street historical look - granite tiles, terra cotta and common By; . EDDIE GARIN Total of Sheiti
bricks Date: 03/31/2023
The plans, ideas, arrangements and designs indicated or represented by this
drawing are owned by, and are the property of BICKEL GROUP, and were
created and developed solely for use on, and in connection with this
specific project, and shall not be used, in whole or in part, for any purpose
for which they were not originally intended without written permission from
BICKEL GROUP © 2021
SHEET TITLE:
ETY)
Е. a
ll UN
ү DEMO AND
| PROPOSED
ELEVATION
a UA EUM REX Ml nn m ER a en ry yt
mac N^ r
JE E I
- * ax Er T ow
g ARP an Dy S m
дує, 5 БҮ,
SUB DATE 06/17/2022
BID DATE
i DATE: 06/13/2022
@ Skylight current look DRAWN BY:
JOB NO:
CHECKED BY:
Ф Q Fifth Street current look - granite tiles and common bricks
a 5 Fifth Street current look - metal stair
a @ 5 Fifth Street current look - elevator
SHEET NUMBER:
REVISIONS
DATE/DELTA
CITY OF LOS ANGELES
PENT RAE ASES DEPARTMENT OF BUILDING AND SAFETY
D |
aa Rusticated granite tiles. Original, significant character-defined features from primary В D ACCESS SECTION
importance to be cleaned.
o © ©) © © © e) OO © 2. Barrel vaulted vestibule with coffered ceiling. Ceiling originally in polychrome painted
| | | | | | | | BU | plaster. Original shape and structure, non-original paint. Significant character-defined This set of plans and specifications has beea reviewed and is approved for
Е "€ features from primary importance to be cleaned as per notes A-0.2E. compliance with state and local laws and ordinances related to accessibility to
M | | zi | | | ere | ш idi 3. Lunettes composed of glass mosaic. Original, significant character-defined features public accommodations and housing. |
| | | | | M. al | | from primary importance to be cleaned. |
| |] | |] С 74 @ Granite corbels. Original, significant character-defined features from primary The stamping of this set of plans and specifications shall mot be held to
- | zs | IS su | mm importance to be cleaned. permit or to be an approval of the violation of any provisions of federal, state, and
Ф D EE CAL ©) Pendant light fixture. Non-original, non-contributing features. To be retained and local laws and ordinances related to accessibility to public accommodations and
mE cleaned. housing.
Т ИШИ \ @ Aluminum glass store front. Non-original material, raster and location. |
Non-contributing feature. To be retained and cleaned. By: Total of Sheets
: | m Plaster wall at side of arched vestibule entrance - originally shops show windows.
^. M AOS "P^ „Г |# Ain _| Non-original, non-contributing feature. То be cleaned. Date:
о ГЕТТО Wa \ » / NIA NU] 7 Level ot
EAST ELEVATION - TO BE RESTORED
3/32" = 1'-0"
1
417 S HILL STREET
HISTORIC REHABILITATION
417 SOUTH HILL STREET
LOS ANGELES, CALIFORNIA
: PEO PLE 3
NA I |ü NAL BA
= /° n т =т=т en a ae
ps. E d д > пош org
| mE - ET | - oT
@ @@ Ө Hill Street historical look - granite tiles, arched entrance and iron @ © @ Ө Hill Street historic look - original pendant light fixture, coffered @ @ @ @ Hill Street current look - granite tiles, arched entrance, coffered >C © © о
glass storefront celing and glass mosaic ceiling, pendant, aluminum glass storefront and plaster wall О P F
; ch
Oo
St
о
"
li
BICKEL GROUP INCORPORATED
3600 BIRCH STREET, SUITE 120
NEWPORT BEACH,
P: 949.757.0411
www.bickelgrop
SIND
2"
cs
BERNARDS
Бу
Pipam
y
|
MUST |
TURN RIGHT
= -
9
ae
4
LL Ы
I
|
Р)
© © © Ө Hill Street current look - granite tiles, arched entrance, coffered @ @ Hill Street current look - granite tiles and aluminum glass @ @ @ Hill Street current look - coffered ceiling, glass mosaic and
ceiling, pendant and aluminum glass storefront storefront pendant light fixture
du | UP
i оо Re ЖҮ E
П AM
€J
use on, and in connection with this
in whole or in part, for any purpose
p it ission from
SHEET TITLE:
ELEVATION TO
BE RESTORED
SUB DATE 06/07/2022
(вот DATE
DATE: 06/14/2022
E. NM. Н С ре СМЕА.
DRAWN BY:
@ Hill Street current look - aluminum glass storefront @ © Ө Hill Street current look - granite corbels, aluminum glass @ © Ө ill Street current look - granite corbels, aluminum glass @ © Hill Street current look - glass mosaic and pendant light fixture | шй
storefront and plaster wall at side of entrance storefront and plaster wall at side of entrance SHEET NUMBER:
REVISION
3," C.R. CHANNEL SWAY ATTACH BRACES TO CONCRETE JOISTS ABOVE HARDWAREGROUP 1 SIONS
BRACE BOTH DIRECTIONS W/ 2 — Ж”Ф x X" SELF TAPPING SCREWS, ТҮР.
DATE/DELTA REMARKS
1 EXIT DEVICE 2601 CD 313 PR
TAPPING SCREWS 1 RIM CYLINDER 12E-72 PATD CORMAX BE
docu шш шш =
Ps 2 DOOR CLOSER QDC115R 3135 SH
SPACER BLOCK P45HD- 110 313 SD
m p ol mc com паа
| 3 DE (ue ошар ааа п
6 1 GASKET PROVIDED BY ALUM. DOOR MFG.
сше ышы сс ущ
1 DRIP CAP 16 A 4" ODW NA
BOTH ENDS
SADDLE TIES, TYP. EA.
INTERSECTION
FURRING CHANNEL MEMBERS
1%” RESTRAINING CHANNEL
EVERY 96 SQ. FT.
MAIN SUPPORTS, TYP.
PER SCHED.
——_ EXISTING BRICK WALL TO REMAIN, 4 1
PATCH AND REPAIR AS NEEDED
REINFORCED CONCRETE . EXISTING CASING TO REMAIN
% Ф x 34" EXPANSION BOLT (W/ 2%”
EMBEDMENT, MIN.), TYP.
(НИТ! КМК BOLT 38—314 OR EQUIV.,
ICBO NO. 2156)
12 GA STEEL CLIP L BENT TO 135° ET.R. М.Е. 7'—2”
—БмРрОЮТ — € POINT
CAULKING AND BACKER ROD
SHIM AS REQUIRED
PER SCHED.
SWAY BRACE W/ 4 TIGHT TURNS
STOREFRONT WINDOW FRAME
HANGER WIRE W/ 8 TIGHT TURNS 1” INSULATED GLAZING, LOW-E,
TEMPERED
NOTE: USE 8 GA WIRE @ SUSPENDED
DRYWALL/PLASTER CEILING INTERIOR EXTERIOR
( ! ) DBL STOREFRONT DOOR
SOME: 1/2"-1-0*
SPLAY OR HANGER WIRE ATTACHMENT STOREFRONT HEAD @ EXISTING OPENING ( Г | DOOR STYLES
scale: NOT TO SCALE SCALE: 3”=1'-0” scu: 1/2”=1’-0”
NOTE: BOTTOM OF ALL DOORS TO HAVE A 10” SMOOTH UNINTERRUPTED SURFACE.
417 S HILL STREET
HISTORIC REHABILITATION
417 SOUTH HILL STREET
LOS ANGELES, CALIFORNIA
INTERIOR EXTERIOR
1” INSULATED GLAZING, LOW-E,
TEMPERED
STOREFRONT WINDOW FRAME
CAULKING AND BACKER ROD
(BOTH SIDES)
(E) SLOPE TO ALL DOORS SHALL COMPLY WITH SECTION 1016 C.B.C.
REMAIN FIN. FL Р
———— 1. A FLOOR OR LANDING NOT MORE THAN 1/4" BELOW THE THRESHOLD IS REQUIRED ON
EACH SIDE OF AN EXIT DOOR.
О
СА 92660
. C
F: 949.757.0511
grp
1/2 EXPANSION JOINT TO- REMAIN PROVIDE SIGN W/ 1” HIGH LETTERS ON CONTRASTING BACKGROUND AT DOOR TRANSOM
TO READ: "THIS DOOR TO REMAIN UNLOCKED WHEN THIS SPACE IS OCCUPIED”
ISTI ILDI FOUNDATI T
REM PUNTOS Н . EXIT DOORS SHALL BE OPERABLE FROM THE INSIDE WITHOUT THE USE OF A KEY OR
ANY SPECIFIC KNOWLEDGE.
. ALARM LOCK AND PANIC HARDWARE PER ELECTRICAL DRAWINGS.
STOREFRONT SILL
SUE 3”—1'—0” PROVIDE PILE WEATHERSTRIPPING AT HEAD, JAMB AND SILL.
ске
FRAMES SHALL BE EITHER ALUMINUM OR HOLLOW METAL AS INDICATED.
ALL DOORS SHALL BE 1 3/4” IN THICKNESS.
7——— EXISTING BRICK WALL TO REMAIN,
PATCH AND REPAIR AS NEEDED . EXTERIOR DOORS SHALL HAVE WEATHERSTRIPPING AT THE HEAD AND JAMB, AND А
THRESH T ;
EXISTING CASING TO REMAIN HRESHOLD AT THE SILL
Qo
ш N
тт
< ш
cr
OZ
2 2
x
о
Ош
2 ш
— ш
а Á
DEO
Or
c o
O r
=
у 0
YO
О
Оф
(n c
NEWPORT BEACH,
P: 949.757.0411
www.b
ALLOW 2” FROM EDGE OF DOOR FRAME TO FINISH OF ADJACENT WALL FOR HARDWARE
CLEARANCES.
EXTERIOR . DOORS SHALL SWING TO A FULL OPEN POSITION, WHEN OPENING FORCE NOT TO
45° SPLAYED WIRE BRACE . LX EE EXCEED 5 POUNDS FOR EXTERIOR AND INTERIOR DOORS AND 15 POUNDS FOR FIRE
WHERE OCCURS 8 GA GALV. WIRE @ 56 О.С. MAX. DOORS IS APPLIED AT RIGHT ANGLES TO HINGED DOORS AND AT THE CENTER PLANE
W/ MIN 4 WRAPS OF SLIDING OR FOLDING DOORS. COMPENSATING DEVICES OR AUTOMATIC DOOR
OPERATORS MAY BE UTILIZED TO MEET THE ABOVE STANDARDS. (SEE CBC SECTION
А 1%” COLD ROLLED RESTRAINING С E.T.R. УЕ. 7'—2” 11В—404.2.9)
1% Do @ 100 SQ. FT. ВМ. Pot — 9 POINT
ER < . ALL DOOR HARDWARE SHALL BE LEVER TYPE, PUSH TYPE OR PANIC TYPE.
%” COLD ROLLED E CAULKING AND BACKER ROD
© 16” O.C. MAX.
STOREFRONT WINDOW MULLION TITLE—24/ADA REQUIREMENTS
PER CBC CH. 118—404: HANDLES, PULLS, LATCHES AND OTHER OPERATING DEVICES
%” RIBLATH FASTENED W/ %” x X" INTERIOR ЭТОМ DRUGS ON ACCESSIBLE DOORS SHALL HAVE A SHAPE THAT IS EASY TO GRASP WITH ONE HAND
SELF TAPPING SCREWS @ 16" O.C. EIE AND DOES NOT REQUIRE TIGHT GRASPING, TIGHT PINCHING OR TWISTING OF THE WRIST
MAX. : TO OPERATE. LEVER-OPERATED MECHANISMS, PUSH-TYPE MECHANISMS, AND U-SHAPED
1" INSULATED GLAZING, LOW-E, HANDLES ARE ACCEPTABLE DESIGNS. WHEN SLIDING DOORS ARE FULLY OPEN, OPERATING
GYPSUM PLASTER PER CEILING TYPE TEMPERED HARDWARE SHALL BE EXPOSED AND USABLE FROM BOTH SIDES. HARDWARE REQUIRED
PER RCP FOR ACCESSIBLE DOOR PASSAGE SHALL BE MOUNTED NO LOWER THAN 34” (864MM)
AND NO HIGHER THAN 44” (1118mm) ABOVE THE FINISHED FLOOR.
STOREFRONT DOOR HEAD 2 ) DOOR NOTES
SOME: 3'=1'—0” Soa: NOT TO SCALE
INTERIOR EXTERIOR
1" INSULATED GLAZING, LOW-E, | The plans, ideas, arrangements and designs indicated or represented by this
TEMPERED CITY OF LOS ANGELES | ppp E LE.
DEPARTMENT OF BUILDING AND SAFETY fr ic iy were ro. orna inde wild. wen permission fum.
DISABLED ACCESS SECTION BICKEL GROUP © 202
SHEET TITLE:
This set of plans and specifications -
STOREFRONT DOOR compliance with state and local laws ordinances related to accessibility to DOOR SCEDULE
public accommodations and housing. & EXTERIOR
1/4” THRESHOLD AND INTERIOR
The stamping of this set of plans and specifications shall not be held to DETAILS
Е пе. permit or to be am approval of the violation of any provisions of federal, state, and SEE DETAIL 2 FOR DOOR NOTES FOR ADDITIONAL INFORMATION AND REQUIREMENTS
<< _———#Ф local laws and ordinances related to accessibility to public accommodations and SEE DETAIL 5 FOR DOOR HARDWARE
7 OF' 7 ”T” STAYS FOR TEMPERED GRAZING
= — "PH" STAYS FOR PANIC HARDWARE/EXIT DEVICE TO BE PROVIDED
ZALAS AEL, Total of — — Sheéti
DATE: 06/13/2022
ze BUILDING FOUNDATION TO DRAWN BY:
Date: 03/31/2023 pis)
CHECKED BY:
STOREFRONT DOOR SILL DOOR SCHEDULE SHEET NUMBER:
SOME: J'-1-0" SCE: NOT TO SCALE A-5 0
it
xX
1/2” EXPANSION JOINT TO REMAIN
KA